Jump to content

Public performance measure: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Improved reference formatting.
Citation bot (talk | contribs)
Alter: title. | Use this bot. Report bugs. | Suggested by Abductive | #UCB_webform 3457/3850
 
(21 intermediate revisions by 14 users not shown)
Line 1: Line 1:
{{Short description|Measure of the punctuality and reliability of passenger trains in Britain}}
The '''Public Performance Measure (PPM)''' is a measure of the [[punctuality]] and reliability of passenger [[trains]] in [[Great Britain|Britain]]. It is the [[percentage]] of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time',<ref name=NR1>{{cite web|title=Performance|url=http://www.networkrail.co.uk/about/performance/|website=NetworkRail|accessdate=29 April 2015}}</ref> where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e. [[commuting|commuter]] services), or within ten minutes for long-distance operators.<ref name=ontime>{{cite web|title=Proportion of trains running on time|url=https://www.gov.uk/government/publications/proportion-of-trains-running-on-time|website=GOV.UK|publisher=Department for Transport|accessdate=29 April 2015}}</ref>
{{Use dmy dates|date=July 2017}}
{{Use British English|date=July 2017}}
The '''public performance measure (PPM)''' is a measure of the [[punctuality]] and reliability of passenger [[trains]] in [[Great Britain|Britain]]. It is the [[percentage]] of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time',<ref name=NR1>{{cite web|title=Performance|url=http://www.networkrail.co.uk/about/performance/|website=NetworkRail|accessdate=29 April 2015|archive-url=https://web.archive.org/web/20151208114925/http://www.networkrail.co.uk/about/performance/|archive-date=8 December 2015|url-status=dead}}</ref> where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e. [[commuting|commuter]] services), or within ten minutes for long-distance operators.<ref name=ontime>{{cite web|title=Proportion of trains running on time|url=https://www.gov.uk/government/publications/proportion-of-trains-running-on-time|website=GOV.UK|publisher=Department for Transport|accessdate=29 April 2015}}</ref>


It is the industry standard measurement of performance,<ref name="NR1"/> and has been used since 6 June 2000.<ref name=ppm_methodology>{{cite web|title=Methodology — Public Performance Measure|url=https://dataportal.orr.gov.uk/displayreport/report/html/ea0ad5a2-daca-47ec-a72e-b6e50a36a3f1|website=Office of Rail and Road|accessdate=29 April 2015}}</ref>
It is the industry standard measurement of performance,<ref name="NR1"/> and has been used since 6 June 2000.<ref name=ppm_methodology>{{cite web|title=Methodology — Public Performance Measure|url=https://dataportal.orr.gov.uk/displayreport/report/html/ea0ad5a2-daca-47ec-a72e-b6e50a36a3f1|website=Office of Rail and Road|accessdate=29 April 2015}}</ref>


The target for PPM varies each year, and is agreed with the [[Office of Rail Regulation]], who in October 2013 said that, "Network Rail should... ensure that 92.5% of trains arrive on time nationally by 2019 (as measured using PPM), compared to 90.7% today."<ref name=finaldetermination>{{cite web|title=Final determination of Network Rail's outputs and funding for 2014-19|url=http://orr.gov.uk/publications/reports/final-determination|website=Office of Rail and Road|accessdate=29 April 2015}}</ref>
The target for PPM varies each year and for each train operator, and is agreed with the [[Office of Rail Regulation]]. In October 2013 ORR said that, "Network Rail should... ensure that 92.5% of trains arrive on time nationally by 2019 (as measured using PPM), compared to 90.7% today."<ref name=finaldetermination>{{cite web|title=Final determination of Network Rail's outputs and funding for 2014-19|url=http://orr.gov.uk/publications/reports/final-determination|website=Office of Rail and Road|accessdate=29 April 2015}}</ref>

==Causes==
Network Rail delays due to infrastructure faults cause about 39% of delays, train operating companies 28%, weather, trespass, vandalism, cable theft and fatalities 20%, other train operating companies (mostly other passenger trains) 13%.<ref>{{Cite web |url=http://www.networkrail.co.uk/about/performance/ |title=Network Rail July 2015 PPM info sheet |access-date=14 March 2015 |archive-url=https://web.archive.org/web/20151208114925/http://www.networkrail.co.uk/about/performance/ |archive-date=8 December 2015 |url-status=dead }}</ref>
===History===
Prior to PPM's introduction in 2000, there were a variety of punctuality measures. For example, in 1957 [[Gerry Fiennes]] published an analysis showing that [[Permanent way (history)|permanent way]] restrictions accounted for 25% of delays, locomotives (eg poor steaming due to wrong type of coal for the engine) 25%, signals (mostly due to other delays) 15%, signal failures 10%, coach defects 8%, station duties 4% and miscellaneous (eg. open doors, lamps out, special stops) 13%.<ref>Railway Magazine September 1957 p. 597</ref>

From 1 April 2019, Network Rail introduced a new 'more detailed and precise set of measures...The official measure of punctuality used up till now, known as the public performance measure (PPM), considers trains to be punctual if they are five or 10 minutes after schedule, for short and long-distance trains are respectively, at their destination. The new measures will report cancellations and the proportion of trains arriving to the minute at every station on the timetable, known as a ‘station stop’, where technology allows...'<ref>{{cite web|title=Railway Performance|url=https://www.networkrail.co.uk/who-we-are/how-we-work/performance/railway-performance/|website=NetworkRail|accessdate=24 June 2019}}</ref>


==Criticisms==
==Criticisms==
{{refimprove section|date=July 2017}}
* PPM doesn't measure strict punctuality &minus; whether a train arrived strictly on time &minus; but has an inbuilt margin for lateness. This means that a train can be 'on time' according to PPM, but still late enough for passengers to miss their connections. It also means there can be, or appear to be, a difference between the rail industry's perception of what is success, and that of passengers.<ref name=railnews>{{cite news|title=Network Rail’s claim of ‘record punctuality’ runs into criticism|accessdate=29 April 2015|work=RailNews|date=27 May 2009}}</ref><ref>{{cite news|title=Network fail: One in three trains runs late, 'real' punctuality figures reveal|url=http://www.dailymail.co.uk/news/article-2171392/Network-Rail-Real-punctuality-figures-just-seven-trains-Britain-run-time.html|accessdate=29 April 2015|work=Daily Mail|date=10 July 2012|ref=dailymail}}</ref>
* PPM doesn't measure strict punctuality &minus; whether a train arrived strictly on time &minus; but has an inbuilt margin for lateness. This means that a train can be 'on time' according to PPM, but still late enough for passengers to miss their connections. It also means there can be, or appear to be, a difference between the rail industry's perception of what is success, and that of passengers.<ref name=railnews>{{cite news|title=Network Rail's claim of 'record punctuality' runs into criticism|url=http://www.railnews.co.uk/news/business/2009/05/27-nr-punctuality-virgin.html|accessdate=29 April 2015|work=RailNews|date=27 May 2009}}</ref>
* PPM doesn't reflect passenger experience, as no weight is given to the number of passengers on each train &minus; a late night service with few passengers on is counted the same as a rush hour service. Therefore, according to PPM, a near-empty train which arrives 6 minutes late is worse than a fully loaded commuter train which arrives 4 minutes late. As busier rush hour trains are more likely to be delayed than off peak trains, PPM scores are likely to be higher than what most passengers experience.
* PPM doesn't reflect passenger experience, as no weight is given to the number of passengers on each train &minus; a late night service with few passengers on is counted the same as a rush hour service. Therefore, according to PPM, a near-empty train which arrives 6 minutes late is worse than a fully loaded commuter train which arrives 4 minutes late. As busier rush hour trains are more likely to be delayed than off peak trains, PPM scores are likely to be higher than what most passengers experience.
* As only the time at the terminating station is recorded, a train could have been late at some of its intermediate stations, affecting passengers alighting at those stops, and this would not be recorded. This is particularly the case for timetables with 'backloading', which is when extra minutes are built into the final leg of the journey as 'catch-up' time.
* As only the time at the terminating station is recorded, a train could have been late at some of its intermediate stations, affecting passengers alighting at those stops, and this would not be a PPM fail. This is particularly the case for timetables with 'backloading', or 'padding', which is when extra minutes are built into the final leg of the journey as 'catch-up' time. While time at the terminus is important for morning commuter trains into a city, when most passengers alight at the terminus, for inter-city trains, cross-country trains, and evening commuter trains out of a city, it is irrelevant to most passengers, who will alight at different points along the journey.
* PPM doesn't measure the ''quality'' of the service provided:
* If a different type or size train is run than originally scheduled, then this doesn't count as a PPM fail. Therefore if a train is run with fewer carriages than normal, meaning that some passengers are unable to board who would normally be able to do so, the train can still be a PPM success.
**It makes no judgement whether customer demand is met by the level of service provision, for example whether departure times match customer journey times, how many people have to stand, or whether people are able to board the first train that departs.
**If minutes are added to a timetabled journey due to repeated lateness, then the service will deteriorate, but PPM will improve.
**If a different type or size train is run than originally scheduled, then this doesn't count as a PPM fail. Therefore if a train is run with fewer carriages than normal, meaning that some passengers are unable to board who would normally be able to do so, the train can still be a PPM success.
* PPM is measured against the planned timetable as agreed between the [[Train operating company|operator]] and [[Network Rail]] at 22:00 the night before.<ref>[https://www.networkrail.co.uk/who-we-are/how-we-work/performance/public-performance-measure Network Rail]</ref> So it is possible for train operators and Network Rail to remove services the day before, for example due to strike action, fail to deliver what the customer is used to expecting, and not fail on PPM.


==References==
==References==
{{Reflist}}
{{Reflist}}



{{UK-rail-transport-stub}}
[[Category:Transport policy in the United Kingdom]]
[[Category:Transport policy in the United Kingdom]]
[[Category:Department for Transport]]
[[Category:Department for Transport]]

Latest revision as of 06:46, 16 July 2023

The public performance measure (PPM) is a measure of the punctuality and reliability of passenger trains in Britain. It is the percentage of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time',[1] where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e. commuter services), or within ten minutes for long-distance operators.[2]

It is the industry standard measurement of performance,[1] and has been used since 6 June 2000.[3]

The target for PPM varies each year and for each train operator, and is agreed with the Office of Rail Regulation. In October 2013 ORR said that, "Network Rail should... ensure that 92.5% of trains arrive on time nationally by 2019 (as measured using PPM), compared to 90.7% today."[4]

Causes

[edit]

Network Rail delays due to infrastructure faults cause about 39% of delays, train operating companies 28%, weather, trespass, vandalism, cable theft and fatalities 20%, other train operating companies (mostly other passenger trains) 13%.[5]

History

[edit]

Prior to PPM's introduction in 2000, there were a variety of punctuality measures. For example, in 1957 Gerry Fiennes published an analysis showing that permanent way restrictions accounted for 25% of delays, locomotives (eg poor steaming due to wrong type of coal for the engine) 25%, signals (mostly due to other delays) 15%, signal failures 10%, coach defects 8%, station duties 4% and miscellaneous (eg. open doors, lamps out, special stops) 13%.[6]

From 1 April 2019, Network Rail introduced a new 'more detailed and precise set of measures...The official measure of punctuality used up till now, known as the public performance measure (PPM), considers trains to be punctual if they are five or 10 minutes after schedule, for short and long-distance trains are respectively, at their destination. The new measures will report cancellations and the proportion of trains arriving to the minute at every station on the timetable, known as a ‘station stop’, where technology allows...'[7]

Criticisms

[edit]
  • PPM doesn't measure strict punctuality − whether a train arrived strictly on time − but has an inbuilt margin for lateness. This means that a train can be 'on time' according to PPM, but still late enough for passengers to miss their connections. It also means there can be, or appear to be, a difference between the rail industry's perception of what is success, and that of passengers.[8]
  • PPM doesn't reflect passenger experience, as no weight is given to the number of passengers on each train − a late night service with few passengers on is counted the same as a rush hour service. Therefore, according to PPM, a near-empty train which arrives 6 minutes late is worse than a fully loaded commuter train which arrives 4 minutes late. As busier rush hour trains are more likely to be delayed than off peak trains, PPM scores are likely to be higher than what most passengers experience.
  • As only the time at the terminating station is recorded, a train could have been late at some of its intermediate stations, affecting passengers alighting at those stops, and this would not be a PPM fail. This is particularly the case for timetables with 'backloading', or 'padding', which is when extra minutes are built into the final leg of the journey as 'catch-up' time. While time at the terminus is important for morning commuter trains into a city, when most passengers alight at the terminus, for inter-city trains, cross-country trains, and evening commuter trains out of a city, it is irrelevant to most passengers, who will alight at different points along the journey.
  • PPM doesn't measure the quality of the service provided:
    • It makes no judgement whether customer demand is met by the level of service provision, for example whether departure times match customer journey times, how many people have to stand, or whether people are able to board the first train that departs.
    • If minutes are added to a timetabled journey due to repeated lateness, then the service will deteriorate, but PPM will improve.
    • If a different type or size train is run than originally scheduled, then this doesn't count as a PPM fail. Therefore if a train is run with fewer carriages than normal, meaning that some passengers are unable to board who would normally be able to do so, the train can still be a PPM success.
  • PPM is measured against the planned timetable as agreed between the operator and Network Rail at 22:00 the night before.[9] So it is possible for train operators and Network Rail to remove services the day before, for example due to strike action, fail to deliver what the customer is used to expecting, and not fail on PPM.

References

[edit]
  1. ^ a b "Performance". NetworkRail. Archived from the original on 8 December 2015. Retrieved 29 April 2015.
  2. ^ "Proportion of trains running on time". GOV.UK. Department for Transport. Retrieved 29 April 2015.
  3. ^ "Methodology — Public Performance Measure". Office of Rail and Road. Retrieved 29 April 2015.
  4. ^ "Final determination of Network Rail's outputs and funding for 2014-19". Office of Rail and Road. Retrieved 29 April 2015.
  5. ^ "Network Rail July 2015 PPM info sheet". Archived from the original on 8 December 2015. Retrieved 14 March 2015.
  6. ^ Railway Magazine September 1957 p. 597
  7. ^ "Railway Performance". NetworkRail. Retrieved 24 June 2019.
  8. ^ "Network Rail's claim of 'record punctuality' runs into criticism". RailNews. 27 May 2009. Retrieved 29 April 2015.
  9. ^ Network Rail