Moel Maelogan: Difference between revisions
Ehrenkater (talk | contribs) mNo edit summary |
m Dating maintenance tags: {{Who}} |
||
Line 38: | Line 38: | ||
The electricity produced goes to the local [[Llanrwst]] sub-station 4.5 km away, and is sold to the [[Non-Fossil Purchasing Agency]]. |
The electricity produced goes to the local [[Llanrwst]] sub-station 4.5 km away, and is sold to the [[Non-Fossil Purchasing Agency]]. |
||
Under the project name of "Ail Wynt" (Second Wind), Cwmni Gwynt Teg planned a further 11 turbines<ref>[http://webarchive.nationalarchives.gov.uk/20070130120000/http://www.planningportal.gov.uk/england/professionals/en/1050578640924.html ]</ref> but this was rejected{{who}}. Despite further opposition<ref>{{cite web|author=John Vidal |url=https://www.theguardian.com/money/2004/may/07/utilities.greenpolitics |title=John Vidal on the war against wind farms | Environment |publisher=The Guardian |date= |accessdate=2013-10-15}}</ref> an amended plan for an additional 9 turbines was passed, and these were built and commissioned in 2008 "within a more compact area and at reduced height".<ref>{{cite web |url=http://www.ailwynt.co.uk/facts.html |title=Archived copy |accessdate=2008-08-28 |deadurl=yes |archiveurl=https://web.archive.org/web/20080724030948/http://www.ailwynt.co.uk/facts.html |archivedate=2008-07-24 |df= }}</ref> |
Under the project name of "Ail Wynt" (Second Wind), Cwmni Gwynt Teg planned a further 11 turbines<ref>[http://webarchive.nationalarchives.gov.uk/20070130120000/http://www.planningportal.gov.uk/england/professionals/en/1050578640924.html ]</ref> but this was rejected{{who|date=September 2018}}. Despite further opposition<ref>{{cite web|author=John Vidal |url=https://www.theguardian.com/money/2004/may/07/utilities.greenpolitics |title=John Vidal on the war against wind farms | Environment |publisher=The Guardian |date= |accessdate=2013-10-15}}</ref> an amended plan for an additional 9 turbines was passed, and these were built and commissioned in 2008 "within a more compact area and at reduced height".<ref>{{cite web |url=http://www.ailwynt.co.uk/facts.html |title=Archived copy |accessdate=2008-08-28 |deadurl=yes |archiveurl=https://web.archive.org/web/20080724030948/http://www.ailwynt.co.uk/facts.html |archivedate=2008-07-24 |df= }}</ref> |
||
Cwmni Gwynt Teg won an [[Ashden Award]] in 2003 for its work on the wind farm.<ref>[http://www.ashdenawards.org/winners/cgt Cwmni Gwynt Teg wins Ashden Award]</ref> |
Cwmni Gwynt Teg won an [[Ashden Award]] in 2003 for its work on the wind farm.<ref>[http://www.ashdenawards.org/winners/cgt Cwmni Gwynt Teg wins Ashden Award]</ref> |
Revision as of 19:01, 16 September 2018
Moel Maelogen | |
---|---|
Country | Wales, United Kingdom |
Coordinates | 53°08′08″N 03°43′00″W / 53.13556°N 3.71667°W |
Status | Operational |
Commission date | January 2003 |
Owner | Co WP Mombkg UK branch |
Operator | GT O+M |
Power generation | |
Units operational | 3 x 1.3 MW |
Make and model | Bonus V47 |
Nameplate capacity | 3.9 MW |
Moel Maelogan (shown on O.S. maps as 'Maelogen', and also sometimes spelled 'Moelogan' and 'Mælogan') is a hill (summit height 424m) on the western edge of Mynydd Hiraethog (also known as the Denbigh Moors) in north Wales, and overlooking the Conwy Valley. It is known mostly as the general location of a wind farm.
The initial three turbines were erected in 2002, and started generating in January 2003; each turbine is capable of producing 1300 kW. This scheme marked erection of the UK wind industry's 1000th turbine[1] and was initially welcomed, as it had been set up by three local farmers to boost their incomes, under the name of Cwmni Gwynt Teg ("Fair Wind Company"). After commissioning, however, it was opposed by some, not least because, although not located in the Snowdonia National Park itself, the turbines are visible from many parts of it.
Of the three turbines, two were owned and operated by the local farming co-operative; the third was owned and operated by Energiekontor UK Ltd,[2] the UK subsidiary of the German wind development company Energiekontor AG, which was instrumental in the finance and construction of the wind farm.
The electricity produced goes to the local Llanrwst sub-station 4.5 km away, and is sold to the Non-Fossil Purchasing Agency.
Under the project name of "Ail Wynt" (Second Wind), Cwmni Gwynt Teg planned a further 11 turbines[3] but this was rejected[who?]. Despite further opposition[4] an amended plan for an additional 9 turbines was passed, and these were built and commissioned in 2008 "within a more compact area and at reduced height".[5]
Cwmni Gwynt Teg won an Ashden Award in 2003 for its work on the wind farm.[6]
See also
References
- ^ http://goliath.ecnext.com/coms2/summary_0199-2762007_ITM
- ^ "Energiekontor UK Ltd: Wind Farm Developer: Leeds, Yorkshire". Energiekontor.co.uk. 1999-08-24. Retrieved 2013-10-15.
- ^ [1]
- ^ John Vidal. "John Vidal on the war against wind farms | Environment". The Guardian. Retrieved 2013-10-15.
- ^ "Archived copy". Archived from the original on 2008-07-24. Retrieved 2008-08-28.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)CS1 maint: archived copy as title (link) - ^ Cwmni Gwynt Teg wins Ashden Award