Jump to content

Adisumarmo Airport Rail Link

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by JarrahTree (talk | contribs) at 14:24, 23 May 2018 (removed Category:Transport in Jakarta using HotCat impossible - nowhere near jakarta - solo to airport is in central java). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Adisumarmo Airport Raillink Services (ARS)
Overview
Native nameRute KA Bandara Adisumarmo
StatusUnder construction
OwnerPT Kereta Api Indonesia & PT Angkasa Pura I
LocaleCentral Java, Indonesia
Termini
Websitewww.railink.co.id
Service
TypeExpress rail
SystemAirport rail link
ServicesAdisumarmo Airport - Solo Balapan
Operator(s)PT Railink [id]
Rolling stockTwo INKA DMU
4-carriage trainsets
History
Planned openingNovember 2018; 6 years ago (2018-11)
Technical
Line length13.5 km (8.4 mi)
CharacterGround
Track gauge1,067 mm (3 ft 6 in)
ElectrificationNIL
Operating speed60 km/h (37 mph)
Adisumarmo ARS
SMO
Adisoemarmo Airport
KDO
Kadipiro
Western route
SLO
Solo Balapan Kereta Api Indonesia Batik Solo Trans Tirtonadi Bus Terminal
PWS
Purwosari Kereta Api Indonesia Batik Solo Trans Heritage railway
former branch to Boyolali
KT
Klaten Kereta Api Indonesia Bus interchange0
Eastern route
SK
Solo Jebres Kereta Api Indonesia Batik Solo Trans
SR
Sragen Kereta Api Indonesia
WK
Walikukun Kereta Api Indonesia
NGW
Ngawi Kereta Api Indonesia
MAG
Magetan Kereta Api Indonesia
freight line to Pertamina depot
MN
Madiun Kereta Api Indonesia
former branch to Ponorogo

Note: Stations marked Kereta Api Indonesia
serve long-distance trains.

Adisumarmo Airport Railink Services (ARS) (Template:Lang-id) is an airport rail link service in Central Java, Indonesia. This rail link was built to cut travel time from Surakarta city center to the airport, as one of the government's efforts to improve the integration between public transport modes and meet the needs of community mobilization, and to create a safe, secure, convenient and timely transportation facility.

The Adisumarmo ARS is the fourth airport rail link in Indonesia connecting passengers between the city centre and airport after Kualanamu ARS, Soekarno–Hatta ARS and Minangkabau ARS.

Background

A new railway is being constructed to the airport. The 13.5-kilometer airport rail will connect Solo Balapan Station to Adi Soemarmo Airport. Construction of the airport rail line consists of two segments: segment 1, from Solo Balapan Station to Solo Baru Station along 3.5 km which is the existing railway track. Meanwhile, segment 2, starting from Solo Baru Station to Adi Sumarmo Airport along the 10 km to be built new railway line. By using this airport train, the distance from Solo to Adi Sumarmo Airport will only take about 15 minutes. The airport railway is predicted to finish in November 2018.[1]

Train services will be provided by PT Railink, a joint venture between PT Angkasa Pura I and PT Kereta Api Indonesia (Template:Lang-en). The trains are manufactured by INKA.[2][3]

See also

References

  1. ^ Liputan6.com. "Ada Kereta Bandara, Solo ke Bandara Adi Soemarmo Hanya 15 Menit". liputan6.com. Retrieved 2018-02-04.{{cite news}}: CS1 maint: numeric names: authors list (link)
  2. ^ IRJ PRO. "Work begins on Indonesian airport rail link". IRJ PRO. Retrieved 2017-04-10.
  3. ^ Jakarta Globe. "Jokowi Lays Corner-Stone for Airport Rail Link Project in His Native Solo". Jakarta Globe. Retrieved 2017-04-09.