MIRA MESA HIGH SCHOOL
Costea Photography

MIRA MESA HIGH SCHOOL, NEW CLASSROOMS AND MUSIC BUILDING

Architects Mosher Drew como Arquitectos

A 21st CENTURY CLASSROOM MODEL
Traditional K-12 education buildings have created an entourage of partitioned structures promoting a single lecturer instruction style, and resulting in mostly isolated classrooms. Current teaching pedagogy has changed the architectural dynamic to reinforce information distribution, team collaboration, and ‘learn by doing.’ Teachers have assumed a role of ‘advisor’ or ‘guide’ to facilitate students’ efforts to research information and create their own knowledge base. A new classroom model should respond by facilitating creative, critical-thinking and communication skills enhanced by a group dynamic. Therefore, we believe the built environment must respond directly to the need for diversity and the collaborative spirit of education through design for flexibility, mobility, and dynamic learning. 

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

The future education building for Mira Mesa High School will reinforce this intent by providing a multi-environment, dynamic learning setting. This multi-setting structure extends beyond traditional indoor-outdoor design by utilizing three distinct variations of instructional spaces combined to create a diverse ‘collaborative nucleus.’ The design offers standardized interior classrooms for traditional needs, but then merges with shared patios and outdoor teaching clusters to promote physical and visual connections to create unique learning experiences. This model allows interior classrooms to be fluidly interactive with an adjacent classroom, patio and outdoor teaching cluster, or each can be partitioned into separate break-out type spaces.

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

The ‘collaborative nucleus’ structure is aligned with other similar structures, enclosing a central landscape area where the ‘teaching clusters’ are located. This architectural model reinforces diversity in learning while promoting the physiological and psychological benefits of connectivity to nature.

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

MUSIC BUILDING FOR MIRA MESA HIGH SCHOOL
Mira Mesa High School has one of the strongest music programs in California with 266 band members and 65 orchestra members. The band participates in multiple on-site and national events throughout the year, including Rose Parade and Carnegie Hall performances. Program success and expansion necessitated a new state-of-the-art facility. As part of campus-wide modernization, vision for the Music Building generated three distinct strategies guiding the design resolution:

1. Enhanced Volume and Acoustics for instrumental performance.
2. Campus Placement accommodating band access to the adjacent stadium, pedestrian connectivity to the campus core and tractor trailer access for equipment loading. 
3. Elevate School Spirit with an iconic building exemplifying school identity and vitality of a premier music program

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

The design highlights two primary high-volume practice rooms, internally formed by angled walls and ceilings acoustically treated for sound deflection and absorption, and externally representative of musical performance. Additionally, strategic integration of natural daylighting enhances light quality without causing disruptive glare for musicians, and a ventilation strategy that includes ‘duct socks’ minimizing undesired sound while optimizing indoor air quality. The band and orchestral group performance rooms are linked by centralized low volume support spaces. 

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

Critical functional requirements included: 

1. Placement of instrument storage units distributed around main practice rooms to augment flow of many students and their instruments.
2. Multiple small rehearsal rooms varying from individual to quartet ensembles.
3. Centralized teacher visibility/surveillance throughout the building.
4. Entrances expressing welcome, student connectivity to the campus and band member egress to parade staging areas.

photo_credit Costea Photography
Costea Photography
photo_credit Costea Photography
Costea Photography

Team:

Design Architect & Architect of Record: Architects Mosher Drew

Contact: Ramiro Losada-Amor

Owner/Client: San Diego Unified School District, John Stokes (Project Coordinator)

General Contractor: Balfour Beatty, Grant Muscavitch

Structural: WSP, Craig Voss

Mechanical/Plumbing: Turpin & Rattan, Cesar Rodriguez

Electrical: Turpin & Rattan, Cesar Rodriguez

Landscape: KTU+A, Kurt Carlson

Civil: WSP, Michael MaGee

Graphic Designer: Visual Asylum, MaeLin Levine

Photographer: Costea Photography  

Caption
Caption
Caption
Créditos Del Proyecto
General Contractor
Arquitectos Paisajistas
Mechanics, Plumbing, Electricity
WSP
Structural & Civil Engineers
Hoja De Especificaciones Del Producto

Project Spotlight
Product Spotlight
Noticias
WHO Academy in Lyon is a purpose-driven facility for global health training
23 dic. 2024 Noticias
La Academia de la OMS en Lyon es un centro orientado a la formación en salud mundial

La Academia de la OMS, situada en el Biodistrito de Gerland, en Lyon, es una instalación dise... Más

Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico
13 dic. 2024 Noticias
Fernanda Canales diseña una tranquila "Casa para la Tercera Edad" en Sonora, México

El estudio de arquitectura mexicano Fernanda Canales ha diseñado un centro comunitario circul... Más

Australia’s first solar-powered façade completed in Melbourne
12 dic. 2024 Noticias
Finalizada en Melbourne la primera fachada de Australia que funciona con energía solar

Situado en Melbourne, el 550 Spencer es el primer edificio de Australia que genera su propia electri... Más

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
12 dic. 2024 Noticias
SPPARC finaliza la restauración del antiguo almacén de la Sociedad Cooperativa del Ejército y la Armada de la época victoriana

En el corazón de Westminster (Londres), el estudio de arquitectura londinense SPPARC ha resta... Más

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
11 dic. 2024 Noticias
La pátina verde del puesto de café de Kioto se consigue con salsa de soja y productos químicos

Ryohei Tanaka, del estudio de arquitectura japonés G Architects Studio, diseñó... Más

New building in Montreal by MU Architecture tells a tale of two facades
11 dic. 2024 Noticias
El nuevo edificio de MU Architecture en Montreal cuenta la historia de dos fachadas

En Montreal (Quebec), Le Petit Laurent es un edificio residencial y comercial de nueva construcci&oa... Más

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 dic. 2024 Noticias
RAMSA completa la McCourt School of Policy de la Universidad de Georgetown, con instalaciones únicas de Maya Lin

Situada en el céntrico Campus Capital de la Universidad de Georgetown, la McCourt School of P... Más