default search action
Christos Koulamas
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j91]Christos Koulamas, George J. Kyparisis, Michael L. Pinedo, Guohua Wan:
Erratum to "Competitive Two-Agent Scheduling and Its Applications". Oper. Res. 72(4): 1749-1750 (2024) - [c39]George E. Raptis, Muhammad Taimoor Khan, Christos Koulamas, Dimitrios Serpanos:
Towards Integration of EPANET and ASM2S To Enhance Security in Water Distribution Systems. ETFA 2024: 1-8 - 2023
- [j90]Christos Koulamas, George J. Kyparisis:
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection. Eur. J. Oper. Res. 305(2): 608-616 (2023) - [j89]Christos Koulamas, George J. Kyparisis:
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems. Eur. J. Oper. Res. 305(3): 999-1017 (2023) - [j88]Christos Koulamas, George J. Kyparisis:
Simultaneous minimisation of mean and variation of waiting times in a two-stage proportionate blocking flow shop. J. Oper. Res. Soc. 74(11): 2289-2299 (2023) - [c38]George E. Raptis, Muhammad Taimoor Khan, Kyriakos Stefanidis, Christos Koulamas, Dimitrios Serpanos:
Towards Run-Time Security Monitoring of Distributed Industrial Control Systems. ETFA 2023: 1-8 - [c37]Christos Anagnostopoulos, Georgios Mylonas, Apostolos P. Fournaris, Christos Koulamas:
A Design Approach and Prototype Implementation for Factory Monitoring Based on Virtual and Augmented Reality at the Edge of Industry 4.0. INDIN 2023: 1-8 - [c36]Christos Panagiotou, Lidia Pocero Fraile, Christos Koulamas:
Detecting Health & Safety Hazards through AI and Edge Computing on Mobile Devices. MECO 2023: 1-4 - [i4]Christos Anagnostopoulos, Georgios Mylonas, Apostolos P. Fournaris, Christos Koulamas:
A Design Approach and Prototype Implementation for Factory Monitoring Based on Virtual and Augmented Reality at the Edge of Industry 4.0. CoRR abs/2306.09692 (2023) - 2022
- [j87]Christos Koulamas, George J. Kyparisis:
Flow shop scheduling with two distinct job due dates. Comput. Ind. Eng. 163: 107835 (2022) - [c35]Christos Anagnostopoulos, Christos Koulamas, Aris S. Lalos, Chrysostomos D. Stylios:
Open-Source Integrated Simulation Framework for Cooperative Autonomous Vehicles. MECO 2022: 1-4 - [c34]Lidia Pocero Fraile, Christos Koulamas:
Design and Evaluation of an Indoor Positioning System based on Mobile Devices. MECO 2022: 1-6 - 2021
- [j86]Christos Koulamas, George J. Kyparisis:
The no-wait flow shop with rejection. Int. J. Prod. Res. 59(6): 1852-1859 (2021) - [j85]S. S. Panwalkar, Christos Koulamas:
New results for minimising variation of flow time in two-machine proportionate no-wait flow shops. Int. J. Prod. Res. 59(9): 2789-2799 (2021) - [j84]Christos Koulamas, George Steiner:
New results for scheduling to minimize tardiness on one machine with rejection and related problems. J. Sched. 24(1): 27-34 (2021) - [c33]Lidia Pocero Fraile, Apostolos P. Fournaris, Christos Koulamas:
Design and Performance Evaluation of an Embedded EDHOC Module. MECO 2021: 1-6 - [c32]Dimitrios Karadimas, Christos Panagiotou, John Gialelis, Christos Koulamas, Stavros A. Koubias:
Process based Machine Learning for Energy Optimization in Industrial Enterprises. MECO 2021: 1-4 - 2020
- [j83]Stavros Nousias, Gerasimos Arvanitis, Aris S. Lalos, George Pavlidis, Christos Koulamas, Athanasios P. Kalogeras, Konstantinos Moustakas:
A Saliency Aware CNN-Based 3D Model Simplification and Compression Framework for Remote Inspection of Heritage Sites. IEEE Access 8: 169982-170001 (2020) - [j82]S. S. Panwalkar, Christos Koulamas:
Analysis of flow shop scheduling anomalies. Eur. J. Oper. Res. 280(1): 25-33 (2020) - [j81]Christos Koulamas:
The proportionate flow shop total tardiness problem. Eur. J. Oper. Res. 284(2): 439-444 (2020) - [j80]S. S. Panwalkar, Christos Koulamas:
Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines. J. Sched. 23(1): 145-154 (2020) - [j79]Christos Koulamas, Mihai T. Lazarescu:
Real-Time Sensor Networks and Systems for the Industrial IoT: What Next? Sensors 20(18): 5023 (2020) - [j78]Aris S. Lalos, Evangelos Vlachos, Kostas Berberidis, Apostolos P. Fournaris, Christos Koulamas:
Privacy Preservation in Industrial IoT via Fast Adaptive Correlation Matrix Completion. IEEE Trans. Ind. Informatics 16(12): 7765-7773 (2020) - [c31]Apostolos P. Fournaris, Aris S. Lalos, Petros Kapsalas, Christos Koulamas:
Decentralized, Secure and Cognitive Architecture for Automotive CyberPhysical System of Systems. MECO 2020: 1-5 - [c30]Nikos Germenis, Panagiotis Fountas, Christos Koulamas:
Low Latency and Low Cost Smart Embedded Seismograph for Early Warning IoT Applications. MECO 2020: 1-4 - [i3]Christos Anagnostopoulos, Aris S. Lalos, George Pavlidis, Christos Koulamas, Athanasios P. Kalogeras, Ana García López, Giacomo Di Benedetto:
Cultural and Heritage Site Defect Detection via 3D Saliency Map Extraction. ERCIM News 2020(121) (2020)
2010 – 2019
- 2019
- [j77]Christos Emmanouilidis, Petros Pistofidis, Luka Bertoncelj, Vassilis Katsouros, Apostolos P. Fournaris, Christos Koulamas, Cristobal Ruiz-Carcel:
Enabling the human in the loop: Linked data and knowledge in industrial cyber-physical systems. Annu. Rev. Control. 47: 249-265 (2019) - [j76]Apostolos P. Fournaris, Christos Alexakos, Christos Anagnostopoulos, Christos Koulamas, Athanasios P. Kalogeras:
Introducing Hardware-Based Intelligence and Reconfigurability on Industrial IoT Edge Nodes. IEEE Des. Test 36(4): 15-23 (2019) - [j75]Christos Koulamas, George J. Kyparisis:
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives. Eur. J. Oper. Res. 278(1): 149-159 (2019) - [j74]Christos Koulamas, S. S. Panwalkar:
The two-stage no-wait/blocking proportionate super shop scheduling problem. Int. J. Prod. Res. 57(10): 2956-2965 (2019) - [j73]S. S. Panwalkar, Christos Koulamas:
The evolution of schematic representations of flow shop scheduling problems. J. Sched. 22(4): 379-391 (2019) - [c29]Aris S. Lalos, Evangelos Vlachos, Kostas Berberidis, Apostolos P. Fournaris, Christos Koulamas:
Robust and Efficient Privacy Preservation in Industrial IoT via correlation completion and tracking. INDIN 2019: 1225-1228 - [c28]Apostolos P. Fournaris, Spilios Giannoulis, Christos Koulamas:
Evaluating CoAP End to End Security for Constrained Wireless Sensor Networks. NTMS 2019: 1-5 - [c27]Stavros Nousias, Aris S. Lalos, Athanasios P. Kalogeras, Christos Alexakos, Christos Koulamas, Konstantinos Moustakas:
Sparse modeling and optimization tools for energy efficient and reliable IoT. SA 2019: 1-4 - [p2]Apostolos P. Fournaris, Andreas Komninos, Aris S. Lalos, Athanasios P. Kalogeras, Christos Koulamas, Dimitrios Serpanos:
Design and Run-Time Aspects of Secure Cyber-Physical Systems. Security and Quality in Cyber-Physical Systems Engineering 2019: 357-382 - [p1]Aris S. Lalos, Athanasios P. Kalogeras, Christos Koulamas, Christos Tselios, Christos Alexakos, Dimitrios Serpanos:
Secure and Safe IIoT Systems via Machine and Deep Learning Approaches. Security and Quality in Cyber-Physical Systems Engineering 2019: 443-470 - [i2]Apostolos P. Fournaris, Christos Koulamas:
Components and Tools for Large Scale, Complex Cyber-Physical Systems Based on Industrial Internet of Things Technologies. ERCIM News 2019(119) (2019) - 2018
- [j72]Christos Koulamas, S. S. Panwalkar:
New index priority rules for no-wait flow shops. Comput. Ind. Eng. 115: 647-652 (2018) - [j71]Christos Koulamas, Athanasios P. Kalogeras:
Cyber-Physical Systems and Digital Twins in the Industrial Internet of Things [Cyber-Physical Systems]. Computer 51(11): 95-98 (2018) - [j70]George J. Kyparisis, Christos Koulamas:
The price-setting newsvendor problem with nonnegative linear additive demand. Eur. J. Oper. Res. 269(2): 695-698 (2018) - [j69]George J. Kyparisis, Christos Koulamas:
Competition in two-tier serial and assembly supply chains with general consumer utility functions. Int. J. Prod. Res. 56(17): 5854-5865 (2018) - [j68]George J. Kyparisis, Christos Koulamas:
The price-setting newsvendor with nonlinear salvage revenue and shortage cost. Oper. Res. Lett. 46(1): 64-68 (2018) - [j67]George J. Kyparisis, Christos Koulamas:
Resale price maintenance in supply chains with general multiplicative demand. Oper. Res. Lett. 46(4): 373-378 (2018) - [c26]George Kalogeras, Christos Koulamas, Athanasios P. Kalogeras, A. Moronis:
Precision Robustness Testing of a Simulation Model for Energy Use in Buildings. ETFA 2018: 932-939 - [c25]Christos Alexakos, Christos Anagnostopoulos, Apostolos P. Fournaris, Christos Koulamas, Athanasios P. Kalogeras:
IoT Integration for Adaptive Manufacturing. ISORC 2018: 146-151 - [c24]George Kalogeras, Christos Koulamas, Athanasios P. Kalogeras, A. Moronis:
Verification and validation of a simulation model for energy use in buildings. WFCS 2018: 1-4 - 2017
- [j66]S. S. Panwalkar, Christos Koulamas:
On the dominance of permutation schedules for some ordered and proportionate flow shop problems. Comput. Ind. Eng. 107: 105-108 (2017) - [j65]Christos Koulamas:
Common due date assignment with generalized earliness/tardiness penalties. Comput. Ind. Eng. 109: 79-83 (2017) - [j64]Federico Della Croce, Christos Koulamas, Vincent T'kindt:
A constraint generation approach for two-machine shop problems with jobs selection. Eur. J. Oper. Res. 259(3): 898-905 (2017) - [j63]Federico Della Croce, Christos Koulamas, Vincent T'kindt:
Minimizing the number of tardy jobs in two-machine settings with common due date. J. Comb. Optim. 34(1): 133-140 (2017) - [c23]Christos Alexakos, Christos Anagnostopoulos, Apostolos P. Fournaris, Athanasios P. Kalogeras, Christos Koulamas:
Production process adaptation to IoT triggered manufacturing resource failure events. ETFA 2017: 1-8 - [c22]Christos Koulamas, A. Moronis, Athanasios P. Kalogeras, D. Liberanome:
Choosing measures for energy efficient hospital buildings. ETFA 2017: 1-7 - [c21]A. Moronis, Christos Koulamas, Athanasios P. Kalogeras:
Validation of a monthly quasi-steady-state simulation model for the energy use in buildings. ETFA 2017: 1-6 - [c20]Soroush Rastegarpour, Luca Ferrarini, Rosalia Pacheco-Torres, Athanasios P. Kalogeras, Christos Koulamas:
Sensitivity analysis of medical centers energy consumption with EnergyPlus. ETFA 2017: 1-7 - 2016
- [j62]Christos Koulamas, S. S. Panwalkar:
The proportionate two-machine no-wait job shop scheduling problem. Eur. J. Oper. Res. 252(1): 131-135 (2016) - [j61]George J. Kyparisis, Christos Koulamas:
New structural properties of supply chains with price-only contracts. Oper. Res. Lett. 44(6): 831-834 (2016) - [j60]Christos P. Antonopoulos, Katerina Asimogloy, Sarah Chiti, Luca D'Onofrio, Simone Gianfranceschi, Danping He, Antonio Iodice, Stavros A. Koubias, Christos Koulamas, Luciano Lavagno, Mihai T. Lazarescu, Gabriel Mujica, George D. Papadopoulos, Jorge Portilla, Luis M. Redondo, Daniele Riccio, Teresa Riesgo, Daniel Rodríguez, Giuseppe Ruello, Vasilis Samoladas, Tsenka Stoyanova, Gerasimos Touliatos, Angela Valvo, Georgia Vlahoy:
Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project. Sensors 16(6): 804 (2016) - [c19]Apostolos P. Fournaris, Nicolas Sklavos, Christos Koulamas:
A High Speed Scalar Multiplier for Binary Edwards Curves. CS2@HiPEAC 2016: 41-44 - 2015
- [j59]Christos Koulamas, S. S. Panwalkar:
On the equivalence of single machine earliness/tardiness problems with job rejection. Comput. Ind. Eng. 87: 1-3 (2015) - [j58]Christos Koulamas, S. S. Panwalkar:
Job selection in two-stage shops with ordered machines. Comput. Ind. Eng. 88: 350-353 (2015) - [j57]Christos Koulamas, George J. Kyparisis:
The three-machine proportionate open shop and mixed shop minimum makespan problems. Eur. J. Oper. Res. 243(1): 70-74 (2015) - [j56]Christos Koulamas:
A note on scheduling problems with competing agents and earliness minimization objectives. Eur. J. Oper. Res. 245(3): 875-876 (2015) - [j55]John J. Kanet, Federico Della Croce, Christos Koulamas, Vincent T'kindt:
Erratum - One Machine Sequencing to Minimize Total Tardiness: A Fourth Theorem for Emmons. Oper. Res. 63(2): 351-352 (2015) - [j54]Christos Koulamas, S. S. Panwalkar:
A note on the complexity of scheduling problems with linear job deterioration. J. Glob. Optim. 62(2): 409-410 (2015) - [c18]Apostolos P. Fournaris, Nicolaos Klaoudatos, Nicolas Sklavos, Christos Koulamas:
Fault and Power Analysis Attack Resistant RNS based Edwards Curve Point Multiplication. CS2@HiPEAC 2015: 43-46 - [c17]Apostolos P. Fournaris, Ioannis Zafeirakis, Christos Koulamas, Nicolas Sklavos, Odysseas G. Koufopavlou:
Designing efficient elliptic Curve Diffie-Hellman accelerators for embedded systems. ISCAS 2015: 2025-2028 - [c16]Christos P. Antonopoulos, Fotis Kerasiotis, Christos Koulamas, George D. Papadopoulos, Stavros A. Koubias:
Experimental evaluation of the waspmote platform power consumption targeting ambient sensing. MECO 2015: 124-128 - [c15]Fotis Kerasiotis, Christos Koulamas, Christos P. Antonopoulos, George D. Papadopoulos:
Middleware approaches for wireless sensor networks based on current trends. MECO 2015: 244-249 - 2014
- [j53]S. S. Panwalkar, Christos Koulamas:
The two-machine no-wait general and proportionate open shop makespan problem. Eur. J. Oper. Res. 238(2): 471-475 (2014) - [c14]Federico Della Croce, Christos Koulamas, Vincent T'kindt:
A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection. ISCO 2014: 198-207 - 2013
- [j52]S. S. Panwalkar, Christos Koulamas:
The three-stage ordered flow shop problem with flexible stage ordering. Comput. Ind. Eng. 64(4): 1093-1095 (2013) - [j51]George J. Kyparisis, Christos Koulamas:
On index priority sequencing rules for scheduling with time-dependent job processing times. Oper. Res. Lett. 41(5): 445-448 (2013) - [j50]George J. Kyparisis, Christos Koulamas:
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers. Oper. Res. Lett. 41(5): 540-544 (2013) - [c13]Christos P. Antonopoulos, Fotis Kerasiotis, Christos Koulamas, George D. Papadopoulos, Stavros A. Koubias:
Design of a WSN software stack Synthesis Evaluation Module. PIMRC Workshops 2013: 81-85 - 2012
- [j49]S. S. Panwalkar, Christos Koulamas:
An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines. Eur. J. Oper. Res. 221(1): 7-13 (2012) - [j48]Federico Della Croce, Christos Koulamas:
A note on minimizing the sum of quadratic completion times on two identical parallel machines. Inf. Process. Lett. 112(19): 738-742 (2012) - [c12]George Provelengios, Paris Kitsos, Nicolas Sklavos, Christos Koulamas:
FPGA-based Design Approaches of Keccak Hash Function. DSD 2012: 648-653 - [c11]Michael Charitos, Christos Koulamas, Grigorios Kalivas:
In-tunnel mobile communications deployment of an heterogeneous WLAN-WiMAX wireless network. FGST 2012: 196-201 - [c10]Spilios Giannoulis, Christos Koulamas, Christos Emmanouilidis, Petros Pistofidis, Dimitris Karampatzakis:
Wireless Sensor Network Technologies for Condition Monitoring of Industrial Assets. APMS (2) 2012: 33-40 - [c9]Kyprianos Papadimitriou, Dionisios N. Pnevmatikatos, Apostolos Dollas, Christos Koulamas, Stavros Aggelidakis, Petros Chatzidakis, Leonidas Vasilikiotis, Maria Emmanouilidou:
Developing RFID-Based Systems for Security in Marine Transportations. Panhellenic Conference on Informatics 2012: 50-55 - [i1]Christos Koulamas, Petros Pistofidis, Christos Emmanouilidis:
Engineering Asset Lifecycle Optimal Management: WelCOM Approach to E-Maintenance. ERCIM News 2012(91) (2012) - 2011
- [j47]George J. Kyparisis, Christos Koulamas:
A note on the classification of consumer demand functions with respect to retailer pass-through rates. Eur. J. Oper. Res. 211(1): 213-215 (2011) - [j46]George J. Kyparisis, Christos Koulamas:
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers. Oper. Res. Lett. 39(6): 471-474 (2011) - 2010
- [j45]Christos Koulamas, George J. Kyparisis:
A note on the effects of downstream efficiency on upstream pricing. Eur. J. Oper. Res. 200(3): 926-928 (2010) - [j44]Christos Koulamas:
The single-machine total tardiness scheduling problem: Review and extensions. Eur. J. Oper. Res. 202(1): 1-7 (2010) - [j43]Christos Koulamas, Sushil Gupta, George J. Kyparisis:
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times. Eur. J. Oper. Res. 205(2): 479-482 (2010) - [j42]Christos Koulamas:
A note on single-machine scheduling with job-dependent learning effects. Eur. J. Oper. Res. 207(2): 1142-1143 (2010) - [j41]Aggeliki S. Prayati, Christos P. Antonopoulos, Tsenka Stoyanova, Christos Koulamas, George D. Papadopoulos:
A modeling approach on the TelosB WSN platform power consumption. J. Syst. Softw. 83(8): 1355-1363 (2010) - [j40]Christos P. Antonopoulos, Aggeliki S. Prayati, Tsenka Stoyanova, Christos Koulamas, George D. Papadopoulos:
Corrigendum to "A modeling approach on the TelosB WSN platform power consumption" [J. Syst. Software 83 (2010) 1355-1363]. J. Syst. Softw. 83(12): 2665 (2010) - [j39]Christos Koulamas:
A faster algorithm for a due date assignment problem with tardy jobs. Oper. Res. Lett. 38(2): 127-128 (2010)
2000 – 2009
- 2009
- [j38]Christos Koulamas:
A faster fully polynomial approximation scheme for the single-machine total tardiness problem. Eur. J. Oper. Res. 193(2): 637-638 (2009) - [j37]Christos Koulamas, George J. Kyparisis:
A note on the proportionate flow shop with a bottleneck machine. Eur. J. Oper. Res. 193(2): 644-645 (2009) - [j36]Christos Koulamas, George J. Kyparisis:
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem. Eur. J. Oper. Res. 196(1): 61-68 (2009) - [c8]Christos P. Antonopoulos, Aggeliki S. Prayati, Tsenka Stoyanova, Christos Koulamas, George D. Papadopoulos:
Experimental evaluation of a WSN platform power consumption. IPDPS 2009: 1-8 - 2008
- [j35]Christos Koulamas, George J. Kyparisis:
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines. Eur. J. Oper. Res. 187(2): 660-666 (2008) - [j34]Christos Koulamas, George J. Kyparisis:
Single-machine scheduling problems with past-sequence-dependent setup times. Eur. J. Oper. Res. 187(3): 1045-1049 (2008) - [j33]Christos Koulamas, George J. Kyparisis:
Single-machine scheduling with waiting-time-dependent due dates. Eur. J. Oper. Res. 191(2): 577-581 (2008) - 2007
- [j32]Christos Koulamas, George J. Kyparisis:
Single-machine and two-machine flowshop scheduling with general learning functions. Eur. J. Oper. Res. 178(2): 402-407 (2007) - [j31]Christos Koulamas, George J. Kyparisis:
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines. Eur. J. Oper. Res. 182(2): 945-951 (2007) - [c7]Christos Koulamas, Aggeliki S. Prayati, George D. Papadopoulos:
A framework for the implementation of adaptive streaming systems. WMuNeP 2007: 23-26 - 2006
- [j30]Christos Koulamas:
A Newsvendor Problem with Revenue Sharing and Channel Coordination. Decis. Sci. 37(1): 91-100 (2006) - [j29]George J. Kyparisis, Christos Koulamas:
Flexible flow shop scheduling with uniform parallel machines. Eur. J. Oper. Res. 168(3): 985-997 (2006) - [j28]Jatinder N. D. Gupta, Christos Koulamas, George J. Kyparisis:
Performance guarantees for flowshop heuristics to minimize makespan. Eur. J. Oper. Res. 169(3): 865-872 (2006) - [j27]George J. Kyparisis, Christos Koulamas:
A note on makespan minimization in two-stage flexible flow shops with uniform machines. Eur. J. Oper. Res. 175(2): 1321-1327 (2006) - [c6]Christos Koulamas, Aggeliki S. Prayati, Gauthier Lafruit, George D. Papadopoulos:
Measurements and modeling of resource consumption in wireless video streaming: the decoder case. WMuNeP 2006: 67-72 - 2005
- [j26]Christos Koulamas, George J. Kyparisis:
A correction to "Single machine scheduling with release times, deadlines and tardiness objectives" [EJOR 133 (2001) 447-453]. Eur. J. Oper. Res. 160(2): 574-575 (2005) - 2004
- [j25]Jatinder N. D. Gupta, Christos Koulamas, George J. Kyparisis, Chris N. Potts, Vitaly A. Strusevich:
Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan. Ann. Oper. Res. 129(1-4): 171-185 (2004) - [j24]Christos Koulamas, George J. Kyparisis:
Concurrent flowshop scheduling to minimize makespan. Eur. J. Oper. Res. 156(2): 524-529 (2004) - [j23]Christos Koulamas, George J. Kyparisis:
Makespan minimization on uniform parallel machines with release times. Eur. J. Oper. Res. 157(1): 262-266 (2004) - [j22]Aggeliki S. Prayati, Christos Koulamas, Stavros A. Koubias, George D. Papadopoulos:
A methodology for the development of distributed real-time control applications with focus on task allocation in heterogeneous systems. IEEE Trans. Ind. Electron. 51(6): 1194-1207 (2004) - [j21]Christos Koulamas, Stavros A. Koubias, George D. Papadopoulos:
Using cut-through forwarding to retain the real-time properties of Profibus over hybrid wired/wireless architectures. IEEE Trans. Ind. Electron. 51(6): 1208-1217 (2004) - 2003
- [c5]Christos Koulamas, Stavros A. Koubias, George D. Papadopoulos:
Real-time performance of cut-through forwarding in hybrid wired/wireless industrial networks. ETFA (1) 2003: 23-30 - 2002
- [j20]George J. Kyparisis, Christos Koulamas:
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines. INFORMS J. Comput. 14(1): 68-80 (2002) - 2001
- [j19]Christos Koulamas, George J. Kyparisis:
The three-stage assembly flowshop scheduling problem. Comput. Oper. Res. 28(7): 689-704 (2001) - [j18]Christos Koulamas, George J. Kyparisis:
A note on scheduling flowshops with flexible stage ordering. Eur. J. Oper. Res. 129(1): 224-229 (2001) - [j17]Christos Koulamas, George J. Kyparisis:
Single machine scheduling with release times, deadlines and tardiness objectives. Eur. J. Oper. Res. 133(2): 447-453 (2001) - [j16]George J. Kyparisis, Christos Koulamas:
A note on weighted completion time minimization in a flexible flow shop. Oper. Res. Lett. 29(1): 5-11 (2001) - [j15]Radovan Stojanovic, Panagiotis Mitropulos, Christos Koulamas, Yorgos A. Karayiannis, Stavros A. Koubias, George D. Papadopoulos:
Real-Time Vision-Based System for Textile Fabric Inspection. Real Time Imaging 7(6): 507-518 (2001) - [c4]Christos Koulamas, A. Lekkas, George D. Papadopoulos, Grigorios Kalivas, Stavros A. Koubias:
Delay performance of radio physical layer technologies as candidates for wireless extensions to industrial networks. ETFA (1) 2001: 133-142 - [c3]Kleanthis Thramboulidis, Christos Tranoris, Chris Koulamas:
An Object-Oriented Framework for the Development of Distributed Industrial Process Measurement and Control Systems. ICEIS (2) 2001: 583-589 - 2000
- [j14]George J. Kyparisis, Christos Koulamas:
Open shop scheduling with makespan and total completion time criteria. Comput. Oper. Res. 27(1): 15-27 (2000) - [j13]George J. Kyparisis, Christos Koulamas:
Flow shop and open shop scheduling with a critical machine and two operations per job. Eur. J. Oper. Res. 127(1): 120-125 (2000) - [j12]Christos Koulamas, George J. Kyparisis:
Scheduling on uniform parallel machines to minimize maximum lateness. Oper. Res. Lett. 26(4): 175-179 (2000) - [c2]Sébastien Gérard, Nikos S. Voros, Chris Koulamas, François Terrier:
Efficient System Modeling for Complex Real-Time Industrial Networks using the ACCORD/UML Methodology. DIPES 2000: 11-22
1990 – 1999
- 1999
- [j11]Eleftherios Iakovou, Chi-Ming Ip, Christos Koulamas:
Throughput‐dependent periodic maintenance policiesfor general production units. Ann. Oper. Res. 91: 41-47 (1999) - [c1]Yorgos A. Karayiannis, Radovan Stojanovic, Panagiotis Mitropoulos, Christos Koulamas, Thanos Stouraitis, Stavros A. Koubias, George D. Papadopoulos:
Defect detection and classification on web textile fabric using multiresolution decomposition and neural networks. ICECS 1999: 765-768 - 1998
- [j10]Eleftherios Iakovou, Christos Koulamas, Kavindra Malik:
Part selection and tool allocation in discrete parts manufacturing. Ann. Oper. Res. 76: 187-200 (1998) - [j9]Christos Koulamas:
A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem. Comput. Oper. Res. 25(2): 83-89 (1998) - [j8]Christos Koulamas:
A new constructive heuristic for the flowshop scheduling problem. Eur. J. Oper. Res. 105(1): 66-71 (1998) - [j7]Christos Koulamas:
On the complexity of two-machine flowshop problems with due date related objectives. Eur. J. Oper. Res. 106(1): 95-100 (1998) - 1997
- [j6]George J. Kyparisis, Christos Koulamas:
Open Shop Scheduling with Maximal Machines. Discret. Appl. Math. 78(1-3): 175-187 (1997) - 1996
- [j5]Eleftherios Iakovou, Chi-Ming Ip, Christos Koulamas:
Machining economics with phase-type distributed tool lives and periodic maintenance control. Comput. Oper. Res. 23(1): 53-62 (1996) - [j4]Christos Koulamas:
Scheduling two parallel semiautomatic machines to minimize machine interference. Comput. Oper. Res. 23(10): 945-956 (1996) - [j3]Christos Koulamas:
A note on finite replenishment inventory systems with continuous deterministic demand. Int. J. Syst. Sci. 27(3): 329-332 (1996) - 1994
- [j2]Christos Koulamas:
The Total Tardiness Problem: Review and Extensions. Oper. Res. 42(6): 1025-1041 (1994) - 1992
- [j1]Christos Koulamas:
A stochastic model for a machining cell with tool failure and tool replacement considerations. Comput. Oper. Res. 19(8): 717-729 (1992)
Coauthor Index
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-11-13 23:45 CET by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint