default search action
Computers & Operations Research, Volume 25
Volume 25, Number 1, January 1998
- Bert De Reyck, Willy Herroelen:
An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. 1-17 - James R. Soltys, James P. Ignizio:
Boundary search procedure for the design and training of an ontogenic neural network classifier. 19-29 - Alexander Tuzikov, Mikhail Makhaniok, Reinhard Männer:
Bicriterion scheduling of identical processing time jobs by uniform processors. 31-35 - Víctor Parada, Mauricio Sepúlveda, Mauricio Solar, Arlindo Gómes:
Solution for the constrained guillotine cutting problem by simulated annealing. 37-47 - Kun-Jen Chung:
A theorem on the determination of economic order quantity under conditions of permissible delay in payments. 49-52 - Konstantin Kogan, Eugene Levner:
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots. 53-62 - Lakdere Benkherouf:
Note on a deterministic lot-size inventory model for deteriorating items with shortages and a declining market. 63-65 - Frederico R. B. Cruz, James MacGregor Smith, Geraldo Robson Mateus:
Solving to optimality the uncapacitated fixed-charge network flow problem. 67-81
Volume 25, Number 2, February 1998
- Christos Koulamas:
A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem. 83-89 - Shigeru Tsubakitani, James R. Evans:
Optimizing tabu list size for the traveling salesman problem. 91-97 - Yong Ju Kim, Yeo Keun Kim, Yongkyun Cho:
A heuristic-based genetic algorithm for workload smoothing in assembly lines. 99-111 - Ho Woo Lee, Boo Yong Ahn:
A queueing model for optimal control of partial buffer sharing in ATM. 113-126 - David Wright:
Analysis of the market for access to broadband telecommunications in the year 2000. 127-138 - Adli Mustafa, Mark Goh:
Finding integer efficient solutions for bicriteria and tricriteria network flow problems using DINAS. 139-157 - Qidong Cao, Mark A. McKnew:
Partial termination rule of Lagrangian relaxation for manufacturing cell formation problems. 159-168
Volume 25, Number 3, March 1998
- James A. Chisman:
Using discrete simulation modeling to study large-scale system reliability/availability. 169-174 - Hoon-Shik Woo, Dong-Soon Yim:
A heuristic algorithm for mean flowtime objective in flowshop scheduling. 175-182 - Tayfur Alfok, C. Vu Duy, Melike Baykal-Gursoy:
Two load sharing processors with failures. 183-189 - Ho Woo Lee, J. G. Park, B. K. Kim, Seung Hyun Yoon, Boo Yong Ahn, No Ik Park:
Queue length and waiting time analysis of a batch arrival queue with bilevel control. 191-205 - Moon-Won Park, Yeong-Dae Kim:
A systematic procedure for setting parameters in simulated annealing algorithms. 207-217 - Sehun Kim, Jaehyun Yeo:
Optimal scheduling in cdma packet radio networks. 219-228 - Gengui Zhou, Mitsuo Gen:
An effective genetic algorithm approach to the quadratic minimum spanning tree problem. 229-237 - Alex J. Orman, Arjan K. Shahani, A. R. Moore:
Modelling for the control of a complex radar system. 239-249
Volume 25, Number 4, April 1998
- Ina S. Markham, Terry R. Rakes:
The effect of sample size and variability of data on the comparative performance of artificial neural networks and regression. 251-263 - M. Selim Akturk, Mehmet Bayram Yildirim:
A new lower bounding scheme for the total weighted tardiness problem. 265-278 - Willy Herroelen, Bert De Reyck, Erik Demeulemeester:
Resource-constrained project scheduling: A survey of recent developments. 279-302 - Masood A. Badri, Donald L. Davis, Donna F. Davis, John Hollingsworth:
A multi-objective course scheduling model: Combining faculty preferences for courses and times. 303-316 - Kemal Altinkemer, Indranil Bose, Raktim Pal:
Average waiting time of customers in an M/D/k queue with nonpreemptive priorities. 317-328 - Lawrence M. Seiford, Joe Zhu:
An acceptance system decision rule with data envelopment analysis. 329-332 - Chih-Hang Wu, José A. Ventura, Sharon Browning:
Computational comparisons of dual conjugate gradient algorithms for strictly convex networks. 333-349
Volume 25, Number 5, May 1998
- Roger Z. Ríos-Mercado, Jonathan F. Bard:
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. 351-366 - Wai-Ki Ching:
An inventory model for manufacturing systems with delivery time guarantees. 367-377 - Lioubov Dombrovskaia, Patricio Rodríguez, Miguel Nussbaum:
Knowledge-based language for modeling linear programming problems. 379-388 - Lawrence M. Seiford, Joe Zhu:
On piecewise loglinear frontiers and log efficiency measures. 389-395 - Eleni Pratsini:
Learning complementarity and setup time reduction. 397-405 - Patricio Rodríguez, Miguel Nussbaum, Rodrigo Baeza, Gerardo León, Marcos Sepúlveda, Agustín Cobián:
Using global search heuristics for the capacity vehicle routing problem. 407-417
Volume 25, Number 6, June 1998
- Guisseppi A. Forgionne:
Delivering complex decision rules to top level managers through decision support systems: a case study in army housing management. 419-429 - Mak A. Kaboudan:
A dynamic-server queuing simulation. 431-439 - Angelo Monfroglio:
Hybrid heuristic algorithms for set covering. 441-455 - Yu Gang, Yang Jian:
On the robust shortest path problem. 457-468 - Reinaldo Morabito, Valdir Garcia:
The cutting stock problem in a hardboard industry: a case study. 469-485 - Hor Chan Gin, Ung Choo Eng:
Extensions of simple eyeballing dynamic lot sizing heuristics. 487-497 - Martine Labbé, Gilbert Laporte, Patrick Soriano:
Covering a graph with cycles. 499-504 - Hsiao-Fan Wang, Yi-Chun Liao:
A hybrid approach to resolving a differentiable integer program. 505-517
Volume 25, Numbers 7-8, July 1998
- Chih-Chien Tu, Hsuanjen Cheng:
Spectral methods for graph bisection problems. 519-530 - Shirish S. Joshi, Hanif D. Sherali, Jeffrey D. Tew:
An enhanced response surface methodology (RSM) algorithm using gradient deflection and second-order search strategies. 531-541 - C. J. Willits, Dennis C. Dietz:
Rapid, efficient analysis of the lambda(n)/Ck/r/N queue, with application to decomposition of closed queuing networks. 543-556 - Vaidyanathan Jayaraman, Rajesh Srivastava, W. C. Benton:
A joint optimization of product variety and ordering approach. 557-566 - John E. Beasley, B. Cao:
A dynamic programming based algorithm for the crew scheduling problem. 567-582 - Jasmit Singh Kochhar, Bryce T. Foster, Sunderesh S. Heragu:
Hope: A genetic algorithm for the unequal area facility layout problem. 583-594 - Chae Y. Lee, Seok Joo Koh:
A design of self-healing ATM networks based on backup virtual paths. 595-609 - Natalie C. Simpson, S. Selçuk Erengüç:
Improved heuristic methods for multiple stage production planning. 611-623 - Maria Teresa Almeida, Mário Centeno:
A composite heuristic for the single machine early/tardy job scheduling problem. 625-635 - Jonathan M. Thompson, Kathryn A. Dowsland:
A robust simulated annealing based examination timetabling system. 637-648 - T. Chakrabarty, Bibhas Chandra Giri, K. S. Chaudhuri:
An EOQ model for items with weibull distribution deterioration, shortages and trended demand: an extension of philip's model. 649-657 - Renata Mansini, Maria Grazia Speranza:
A linear programming model for the separate refuse collection service. 659-673 - Ju Hyun Chul, Kim Yeongho, Keun Kim Yeo:
A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. 675-690
Volume 25, Number 9, September 1998
- Amit Monga, J. Zuo Ming:
Optimal system design considering maintenance and warranty. 691-705 - Martin J. Fischer, Carl M. Harris:
Approximating by enhanced interpolation in queueing analyses. 707-717 - K. Cheng Hsing, Marshall L. Freimer, William B. Richmond, Ushio Sumita:
Optimal repair of degrading computers under asymmetric information and incentive incompatibility. 719-728 - Mauro Dell'Amico, Francesco Maffioli, Marco Trubian:
New bounds for optimum traffic assignment in satellite communication. 729-743 - Susanne Mathies, Peter Mevert:
A hybrid algorithm for solving network flow problems with side constraints. 745-756 - Tariq A. Aldowaisan, Ali Allahverdi:
Total flowtime in no-wait flowshops with separated setup times. 757-765 - Jiye Han, Jianjun Wen, Guochuan Zhang:
A new approximation algorithm for UET-Scheduling with chain-type precedence constraints. 767-771 - Ho-Won Jung:
A computing power allocation model in distributed database systems. 773-780 - Lea Friedman, Zilla Sinuany-Stern:
Combining ranking scales and selecting variables in the DEA context: the case of industrial branches. 781-791
Volume 25, Number 10, October 1998
- Yen-Liang Chen, Kwei Tang:
Minimum time paths in a network with mixed time constraints. 793-805 - Kao Chiang:
Performance of several nonlinear programming software packages on microcomputers. 807-816 - Peter Chu, Kun-Jen Chung, Shaw-Ping Lan:
Economic order quantity of deteriorating items under permissible delay in payments. 817-824 - Harvey H. Millar:
The impact of rolling horizon planning on the cost of industrial fishing activity. 825-837 - L. Anand, Debasish Ghose, V. Mani:
Probabilistic load scheduling with priorities in distributed computing systems. 839-856 - Oded Berman, Michal Cutler:
Optimal software implementation considering reliability and cost. 857-868 - Hasan Pirkul, Vaidyanathan Jayaraman:
A multi-commodity, multi-plant, capacitated facility location problem: formulation and efficient heuristic solution. 869-878
Volume 25, Number 11, 1 November 1998
- Wen Lea Pearn, R. C. Chien:
Improved solutions for the traveling purchaser problem. 879-885 - Sydney C. K. Chu, Edmond C. H. Chan:
Crew scheduling of light rail transit in Hong Kong: from modeling to implementation. 887-894 - Sonja Novkovic, Davor Sverko:
The minimal deceptive problem revisited: The role of "genetic waste". 895-911 - Hesham K. Alfares:
An efficient two-phase algorithm for cyclic days-off scheduling. 913-923 - Mhand Hifi:
Exact algorithms for the guillotine strip cutting/packing problem. 925-940 - Aliakbar Montazer-Haghighi:
An analysis of the number of tasks in a parallel multi-processor system with task-splitting and feedback. 941-956 - G. V. Krishna Reddy, R. Nadarajan, R. Arumuganathan:
Analysis of a bulk queue with N-policy multiple vacations and setup times. 957-967 - Rob J. M. Vaessens, Emile H. L. Aarts, Jan Karel Lenstra:
A local search template. 969-979 - William G. Bistline Sr., Snehamay Banerjee, Avijit Banerjee:
RTSS: An interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions. 981-995 - Asoke Kumar Bhunia, Manoranjan Maiti:
Deterministic inventory model for deteriorating items with finite rate of replenishment dependent on inventory level. 997-1006 - Ilkyeong Moon, Sangjin Choi:
A note on lead time and distributional assumptions in continuous review inventory models. 1007-1012
Volume 25, Number 12, December 1998
- Gautam Choudhury:
On a batch arrival poisson queue with a random setup time and vacation period. 1013-1026 - Yi-Feng Hung, Yi-Cheng Hu:
Solving mixed integer programming production planning problems with setups by shadow price information. 1027-1042 - Blas Pelegrín, Pascual Fernández:
On the sum-max bicriterion path problem. 1043-1054 - George A. Vouros, Chrissoleon T. Papadopoulos:
Buffer allocation in unreliable production lines using a knowledge based system. 1055-1067 - Deborah Koucky Radasch, N. K. Kwak:
An integrated mathematical programming model for offset planning. 1069-1083 - Tapan Kumar Roy, Manoranjan Maiti:
Multi-objective inventory models of deteriorating items with some constraints in a fuzzy environment. 1085-1095 - Pedro Fernández de Córdoba, Lluís Miquel Garcia-Raffi, José M. Sanchis:
A heuristic algorithm based on Monte Carlo methods for the rural postman problem. 1097-1106 - Elise Miller-Hooks, Hani S. Mahmassani:
Least possible time paths in stochastic, time-varying networks. 1107-1125 - Xiong Chen, Weishui Wan, Xinhe Xu:
Modeling rolling batch planning as vehicle routing problem with time windows. 1127-1136 - Han-Lin Li:
Solve least absolute value regression problems using modified goal programming techniques. 1137-1143 - John G. Klincewicz, Hanan Luss, Dicky C. K. Yan:
Designing tributary networks with multiple ring families. 1145-1157 - G. V. Krishna Reddy, R. Anitha:
Markovian bulk service queue with delayed vacations. 1159-1166
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.