Phoenix–Mesa Gateway Airport: Difference between revisions

Content deleted Content added
History: Fixed grammar
Tags: Mobile edit Mobile app edit Android app edit
Future plans: Added links
Tags: Mobile edit Mobile app edit Android app edit
Line 241:
===Private Development===
{{Unreferenced section|date=April 2023}}
On November 9, 2021, [[Gulfstream Aerospace Corporation]] announced that the airport would be the site for the West Coast Service Center Maintenance, Repair and Overhaul (MRO) facility. The construction cost would be more than $100 million and include a {{convert|225,000-square-foot|sqft|m2|sing=on}} facility in Phase One.
 
On July 14, 2022, [[Virgin Galactic Holdings, Inc.]] announced it had signed a long-term lease for a new final assembly manufacturing facility for its next-generation Delta class spaceships. The facility will be capable of producing up to six spaceships per year and will bring hundreds of highly skilled aerospace engineering and manufacturing jobs to the area.
 
== Ground transportation ==