Milan Metro

This is an old revision of this page, as edited by 2a02:b027:14:f112:5adb:84e8:717d:a78d (talk) at 16:14, 29 February 2024. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Milan Metro (Template:Lang-it) is the rapid transit system serving Milan, Italy, operated by Azienda Trasporti Milanesi. The network consists of 5 lines with a total network length of 104.1 kilometres (64.7 mi), and a total of 121 stations, mostly underground.[3] It has a daily ridership of about 1.4 million on weekdays.[1] The Milan Metro is the largest system in Italy for length, number of stations and ridership; and the seventh longest in the European Union.

Milan Metro
Line M3 at Lodi TIBB
Line M3 at Lodi TIBB
Overview
Native nameMetropolitana di Milano
LocaleMilan, Lombardy, Italy
Transit typeRapid transit
Number of lines5
Number of stations113
Daily ridership1.39 million (2018 average weekday)[1]
1.57 million (2018 peak)[1]
Annual ridership369 million (2018)[2]
Websitewww.atm.it/en/
Operation
Began operation1 November 1964
Operator(s)Azienda Trasporti Milanesi
Number of vehicles1,029 (2018)[2]
Technical
System length104 km (65 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC fourth rail (line 1)
1,500 V DC overhead catenary (lines 2 & 3)
750 V DC third rail (lines 4 & 5)
System map

The first line, Line 1, opened in 1964;[4][5] Line 2 opened 5 years later in 1969,[5] Line 3 in 1990,[5] Line 5 in 2013,[6] and Line 4 in 2022. There are also several extensions planned and under construction. The architectural project of the Milan Metro, created by Franco Albini and Franca Helg, and the signs, designed by Bob Noorda, received the Compasso d'Oro award in 1964.[7]

History

 
The first project for the network in 1952.

The first projects for a subway line in Milan were drawn up in 1914 and 1925, following the examples of underground transport networks in other European cities such as London and Paris. Planning proceeded in 1938 for the construction of a system of 7 lines, but this too halted after the start of World War II and due to lack of funds.[8]

On 3 July 1952, the city administration voted for a project of a metro system[9] and on 6 October 1955, a new company, Metropolitana Milanese, was created to manage the construction of the new infrastructure.[8] The project was funded with 500 million from the municipality and the rest from a loan. The construction site of the first line was opened in viale Monte Rosa on 4 May 1957.[8] Stations on the new line were designed by Franco Albini and Franca Helg architecture studio, while Bob Noorda designed the signage.[8] For this project both Albini-Helg and Noorda won the Compasso D'Oro prize.

The first section from Lotto to Sesto Marelli (21 stations) was opened on 1 November 1964 after 7 years of construction works. Two trains adorned with Italian flags left at 10.41 a.m. and arrived at the Sesto Marelli terminus at 11.15 a.m., greeted by the notes of the national anthem and the triumphal march of Giuseppe Verdi's opera "Aida". The track was 12.5 km (7.8 mi) long, and the mean distance between the stations was 590 m (1,940 ft).[10] In the same year, in April, works on the second line started. Passengers on the network grew constantly through the first years of service, passing from 37,092,315 in 1965 to 61,937,192 in 1969.[10]

The green line from Caiazzo to Cascina Gobba (7 stations) opened five years later. During the 1960s and 1970s the network of 2 lines was completed, and both lines had 2 different spurs. In 1978, the lines were already 17.6 km (10.9 mi) and 23 km (14 mi) long respectively, with 28 and 22 stations.[10]

The first section of the third line (yellow), with 5 stations, was opened on 3 May 1990 after almost 9 years of construction works. The line opened just before the World Cup. The other 9 stations on Line 3 opened to the southeast in 1991, and northwest to Maciachini Station in 2004.

In March 2005, the Line 2 Abbiategrasso station (south branch from Famagosta) and the Line 1 Rho Fiera station opened. The intermediate station of Pero opened in December 2005. A north extension of Line 3 to Comasina (4 stations) and a new south branch on the Line 2 to Assago (2 stations) opened in early 2011.

 
Network evolution

The first stage of the Line 5, covering the 4.1 kilometres (2.5 mi) from Bignami to Zara opened on 10 February 2013.[11] The 1.9-kilometre (1.2 mi) second stage, from Zara to Garibaldi FS, opened on 1 March 2014.[12] The 7-kilometre (4.3 mi) third stage, from Garibaldi FS to San Siro Stadio opened on 29 April 2015, with some intermediate stations not in service at that time;[13][14] as of November 2015, all the stations have been opened.

The metro replaced several interurban tramroutes of the original Società Trazione Elettrica Lombarda (STEL) tramlines, in particular the Line 2 to Gessate.

Timeline

Infrastructure

Lines

The system comprises 5 lines. All the lines run underground except for the northern part of Line 2 and the Line 2 Assago branch.

There are 8 interchange stations, each with 2 lines: Loreto (Lines 1 and 2); Cadorna (Lines 1 and 2), Centrale (Lines 2 and 3), also Milan's main train station; Duomo (Lines 1 and 3), considered the center of the city; Zara (Lines 3 and 5); Garibaldi (Lines 2 and 5), also a major railway station; Lotto (Lines 1 and 5) and San Babila (Lines 1 and 4).

Lines run in the Milan municipality for 80% of the total length (92 stations).[15] Beside Milan, 13 other neighbouring municipalities are served: Assago, Bussero, Cassina de' Pecchi, Cernusco sul Naviglio, Cologno Monzese, Gessate, Gorgonzola, Pero, Rho, San Donato Milanese, Segrate, Sesto San Giovanni, Vimodrone. The network covers about 20% of Milan's total area.[15]

The metro network is also linked with the suburban rail service, with 14 interchange stations: Affori FN, Cadorna FN, Domodossola, Garibaldi FS, Lambrate FS, Lodi T.I.B.B. (with the nearby Porta Romana station), Porta Venezia, Repubblica, Rho Fiera, Rogoredo FS, Romolo, Sesto 1º Maggio, Dateo and Forlanini[16]

The track gauge for all lines is the 1,435 mm (4 ft 8+12 in) standard gauge. Platform screen doors are present in all stations on Line 4 and Line 5 and on some stations on Line 1.

Line Terminals Opened[5][6] Latest
extension
Length (km)
[citation needed]
Stations Avg. station
distance (km)
  Rho Fiera / Bisceglie Sesto 1º Maggio 1964 2005 26.9 38 0.727
  Assago Milanofiori Forum / Abbiategrasso Cologno Nord / Gessate 1969 2011 39.4 35 1.159
  Comasina San Donato 1990 2011 16.7 21 0.835
  Linate Aeroporto San Babila 2022 2023 7.3 8 0.723
  San Siro Stadio Bignami 2013 2015 12.9 19 0.763

Network Map

 


Power supply

 
An M1 train with one of the fourth-rail contact shoes

Lines 2 and 3 use overhead lines to supply the electric current to the train and are electrified at 1500 V DC. Line 1, electrified at 750 V DC, uses a fourth rail system, although the same line also supports overhead lines in some stretches and depots; this allows Line 2 and 3 trains to use Line 1 tracks to reach a depot placed on the line. Line 4 and Line 5 trains are supplied by a third rail system at 750 V DC.

Signalling

Passenger information

 
An M3 LED screen announcing the waiting time
 
Cascina Burrona stop on the M2 Gessate branch, an example of a surface suburban stop

All the stations are provided with LED screens showing the destination and waiting time of coming trains. In every station, a recorded voice announces the direction of every approaching train and, at the platform, the name of the station. While older trains have no on-train information, the new Meneghino and Leonardo trains and the driverless trains on Line 5 are equipped with displays and recorded announcements in Italian and in English.

Mobile phone coverage

Since December 2009 all stations and trains of the Milan metro have full UMTS and HSDPA connectivity.[17] Mobile operators TIM and Vodafone also provide LTE connectivity in all lines.

Rolling stock

A Meneghino train on M2
Inside a Meneghino train on M3
A Leonardo train at Cimiano Station
Interior of a Leonardo on M1
 
M3 rolling stock at the Rogoredo depot

The first 3 lines are heavy rapid-transit lines, with 6-cars trains, about 105 m in length. Line 4 and Line 5 are light metro lines, with 4-cars trains, about 50 m long.[18][19] Line 4 and Line 5 are equipped with driverless trains.

Service

 
M3 train interior

Tickets

 
Former Milan urban tickets from Trenord (top left) and ATM (bottom left). An Itinero smart card, with name, photo and card number covered (right).

A standard ticket costs €2.20 and is valid for 90 minutes since its validation on metro, tram, bus, trolleybus and suburban lines within Milan and 21 bordering municipalities.[20] Other tickets are available as well, such as daily, weekly, monthly, annual, student and senior passes. Additional fares are required to travel outside Milan and the 21 bordering municipalities.[21]

Paper tickets can be substituted by contactless bank cards payments, provided the trip starts in the metro, by tapping in the orange gates installed in every metro station.[22] This payment method is not available on suburban lines; it was expected to be implemented on trams and buses starting by the end of 2019;[23] it was eventually introduced in December 2020 on three urban bus lines, with plans for coverage on all the network by 2023.[24]

Between 2004 and 2007 ATM introduced Itinero smartcard, a proximity card which can be charged with season tickets, replacing paper for this type of tickets. At the beginning of 2010, a new smartcard, RicaricaMi, was introduced. The new card can be charged up with credit and can be used for travel[25] in place of magnetic paper tickets, on the model of London's Oyster card.[26]

Milan metro lines can be accessed also with the regional integrated ticket "Io viaggio ovunque in Lombardia", as 1 to 7 days tickets or longer subscriptions using the smartcard "Io Viaggio".

Opening hours

The service starts at about 5:40 am and ends at about 0:30. During Sundays and holidays service usually starts later and ends later, depending on the occasion.[27]

Headways at peak hours vary from 2 minutes on the Line 1 (central part) to 3 minutes on Line 3. On branch lines (of lines 1 and 2) the headway is usually double.[27]

Night service

A night service has operated since 2015 with buses. The bus service follows the same route and stops at the same stations of the metro. The entire lines 1 and 3 and the urban section of line 2 (Abbiategrasso-Cascina Gobba) are covered by the service.

The future network

The metro system is currently expanding. An extension of Line 1 from Sesto 1º Maggio to Cinisello/Monza, towards the city of Cinisello Balsamo, is currently under construction. The track will be 2 kilometres (1.2 mi) long with an intermediate station at Sesto Restellone. The completion has been delayed several times, and is now scheduled for 2027.[28] There is a project for a further 3 km extension of Line 1 to the west into Baggio, a neighbourhood on the eastern border of the municipality.

An extension of Line 2 from Cologno Nord to Vimercate is planned. The section will be 10.8 kilometres (6.7 mi) long with 6 stations (Brugherio, Carugate, Agrate Colleoni, Concorezzo, Vimercate Torri Bianche, Vimercate). The track will be mostly underground (83%).[29]

Line 3 is planned to be extended in some form (by metro or some less expensive means) to the south-east from San Donato to Paullo: 14.8 kilometres (9.2 mi) with intermediate stations in the city of San Donato, Peschiera Borromeo, Mediglia, Caleppio Cerca, Paullo and Paullo East, the first 3 being underground and the other on the surface.[29] The project is currently on hold.

 
Geographic map of the current network and the lines under construction
 
Forlanini FS station on Line 4 under construction in 2016

The last phase of line 4, from the city centre in San Babila to San Cristoforo railway station in the south-west, near the municipal border with Buccinasco and Corsico, is scheduled to open in 2024. Further extensions to Segrate train station in the east and to Buccinasco are also planned, though not yet in construction.[citation needed]

Line 5 is planned to be extended to Cinisello/Monza.[30] where it will intersect with line 1 a second time at Monza Bettola [it].

Milan Metro extensions under construction or planned
Line Route or station[31] Phase[31] Scheduled opening Length New stations
  Sesto 1° Maggio – Cinisello/Monza Under construction 2027[28] 1.9 km 2
Bisceglie – Baggio Approved (expected start of works: 2024)[32] 3 km 3
  Cologno Nord - Vimercate Design 9.7 km 5
Gessate - Trezzo sull'Adda Design 8 km 4
  San Donato – Paullo Est Design 14.8 km 6
  San Babila - San Cristoforo FS Under construction October 2024 7.7 km 13
  Bignami - Cinisello/Monza Approved (expected start of works: 2023) 2031 13.2 km 12
San Siro Stadio - Settimo Milanese Design 4.5 km 4

See also

References

  1. ^ a b c ""Atm, record di passeggeri e centomila multe in più"". 7 January 2019.
  2. ^ a b "Bilancio Consolidato del Gruppo ATM e Bilancio di Esercizio di ATM S.p.A. 2018" (PDF) (in Italian). Azienda Trasporti Milanesi (ATM) SpA. April 2019. p. III. Retrieved 24 August 2019.
  3. ^ "L'opera che ha fatto di Milano una grande metropoli" [The work that has made a great metropolis of Milan] (in Italian). Metropolitane Milanesi SpA. Retrieved 20 June 2015.
  4. ^ Milan Opens Its First Metro International Railway Journal February 1965 page 22
  5. ^ a b c d "ATM's History". ATM. Retrieved 9 November 2013.
  6. ^ a b "La storia" [The history] (in Italian). ATM. Retrieved 9 November 2013.
  7. ^ "Compasso d'oro 1964 alla Metropolitana di Milano - Motivazione e foto storiche della premiazione" (in Italian). Archived from the original on 10 January 2015. Retrieved 14 February 2024.
  8. ^ a b c d "La storia della linea 1". Metropolitana Milanese Spa. Retrieved 31 October 2011.
  9. ^ Ogliari, Francesco (2006). Milano in tram : storia del trasporto pubblico milanese. Milano: Ulrico Hoepli. ISBN 978-88-203-3719-3.
  10. ^ a b c "La cronistoria della metropolitana di Milano". Cityrailways. Archived from the original on 20 March 2012. Retrieved 8 November 2011.
  11. ^ "Milano Metro's first driverless line inaugurated". Railway Gazette International. 6 February 2013. Retrieved 6 June 2015.
  12. ^ "Milano extends driverless Line M5". Railway Gazette International. 7 March 2014. Retrieved 6 June 2015.
  13. ^ Sadler, Katie (1 May 2015). "Milan Metro Line 5 extension begins driverless operation". Eurotransport. Retrieved 6 June 2015.
  14. ^ Chiandoni, Marco (1 May 2015). "Milan Line 5 extension opens". International Railway Journal. Retrieved 6 June 2015.
  15. ^ a b "Metropolitane a Milano - L'opera che ha fatto di Milano una grande metropoli". Metropolitana Milanese. Retrieved 10 February 2012.
  16. ^ see List of Milan Metro stations.
  17. ^ "Telefonini in metrò: copertura al 100%". Azienda Trasporti Milanesi. Retrieved 26 February 2012.
  18. ^ "Milan Line 5 The purple line connecting Garibaldi and Monza". Metropolitana Milanese S.p.A. Retrieved 7 August 2015.
  19. ^ "Milan's fifth metro line: the M4!". Urban Transport Magazine. 26 November 2022.
  20. ^ "Biglietto Atm a 2 euro: cosa cambia? Nuove tariffe, sconti, abbonamenti e zone di Milano". MilanoToday (in Italian). Retrieved 19 January 2020.
  21. ^ "Biglietto Atm: nuovi prezzi, sconti, zone, tariffe e abbonamenti per la metro. Guida completa". MilanoToday (in Italian). Retrieved 2 August 2019.
  22. ^ "Viaggia con la carta bancaria contactless ATM, Azienda Trasporti Milanesi". www.atm.it. Retrieved 2 August 2019.
  23. ^ ""Addio" ai biglietti Atm: anche su bus e tram si paga con la carta, ecco come funziona. Video". MilanoToday (in Italian). Retrieved 7 November 2019.
  24. ^ Anastasio, Giambattista (7 December 2020). "Il biglietto si fa direttamente sull'autobus: basta avvicinare la carta alle obliteratrici". Il Giorno (in Italian). Retrieved 15 December 2020.
  25. ^ "Where to Stay in Milan". Archived from the original on 2 April 2015. Retrieved 17 February 2015.
  26. ^ "ANCHE MILANO HA LA SUA OYSTER CARD: ITINERO RICARICAMI". Partodamilano. Archived from the original on 25 April 2012. Retrieved 2 October 2011.
  27. ^ a b "Orari e calendario ATM". Azienda Trasporti Milanesi. Retrieved 2 November 2011.
  28. ^ a b Lana, Laura (8 November 2023). "Metropolitana M1 a Sesto San Giovanni, ripartono i lavori (ma mancano 30 milioni di euro)". Il Giorno. Retrieved 15 February 2024.
  29. ^ a b "Prolungamento linee Metropolitane e Nodo Interscambio Fiera". Comune di Milano. Retrieved 2 October 2011.
  30. ^ "Prolungamento linea metropolitana M5: recepito il progetto di cantierizzazione". Comunie di CiniselloBalsamo.
  31. ^ a b "Metropolitana Milanese". Metropolitana Milanese. Archived from the original on 26 October 2011. Retrieved 11 October 2018.
  32. ^ Talotta, Luca (25 April 2023). "Metropolitana rossa di Milano: che fine ha fatto il prolungamento da Bisceglie a Baggio? | Clicca qui". Mitomorrow (in Italian). Retrieved 15 February 2024.