Blatchford Gate station: Difference between revisions
Appearance
Content deleted Content added
removed Category:Edmonton Light Rail Transit stations using HotCat |
|||
Line 23: | Line 23: | ||
[[Category:Edmonton Light Rail Transit stations]] |
|||
[[Category:Future Edmonton Light Rail Transit stations]] |
[[Category:Future Edmonton Light Rail Transit stations]] |
Revision as of 18:47, 11 May 2023
This article needs additional citations for verification. (May 2023) |
Blatchford Gate | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Edmonton LRT station | |||||||||||
General information | |||||||||||
Owned by | City of Edmonton | ||||||||||
Platforms | Side-loading platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Accessible | Yes | ||||||||||
Future Services | |||||||||||
|
Blatchford Gate station is an under construction Edmonton Light Rail Transit station in Edmonton, Alberta. It will be a surface level station and will feature a transit mall. It will serve the Metro Line and will be the northern terminus station until the line is further extended. It will be located in the Blatchford Community. The station is planned to open in 2024[1]
References
- ^ "Metro Line - Northwest Extension | City of Edmonton". www.edmonton.ca. Retrieved 2023-05-11.