m Poorly worded although the captain should now be correct as a new bridge has been built at Sandbach [2013?]. Unsure on date, left out for now. |
||
Line 6: | Line 6: | ||
|code = SDB |
|code = SDB |
||
|image_name = Sandbach Rail Station.JPG |
|image_name = Sandbach Rail Station.JPG |
||
|caption = View of |
|caption = View of Platforms 2 and 3 from the old bridge. A newly built bridge between platforms 1 and 2/3 has been built and the old bridge removed. |
||
|manager = [[Northern Rail]] |
|manager = [[Northern Rail]] |
||
|locale = [[Sandbach]] |
|locale = [[Sandbach]] |
Revision as of 19:27, 27 November 2014
Sandbach | |
---|---|
General information | |
Location | Cheshire East |
Managed by | Northern Rail |
Platforms | 3 |
Other information | |
Station code | SDB |
Sandbach railway station serves the town of Sandbach in Cheshire, England. The station is 4¾ miles (8 km) north east of Crewe on the Crewe to Manchester Line.
Although the station is called "Sandbach railway station", the actual location of the station is on the A533 road from Sandbach to Middlewich and Northwich in the local residential suburb of Elworth.
Sandbach was a double junction on the LNWR and later London Midland and Scottish Railway line from Crewe to Manchester. For many years, Sandbach was a junction for the single line branch to Middlewich and Northwich railway station, which carried a heavy freight traffic but which closed for passenger service in January 1960 (this remains open for freight, but only sees occasional use). Even earlier, the North Staffordshire Railway branch from Kidsgrove to Sandbach ceased passenger service in the 1930s and closed for freight traffic in the 1960s.
Services
On Monday to Saturday during the daytime there are two trains per hour to Crewe southbound and two per hour to Manchester Piccadilly northbound. One journey goes via Stockport and the other via Manchester Airport. There is an hourly service during the evening in each direction via Stockport.
On Sundays there is a two-hourly service in each direction.
Sandbach has three platforms :-
Platform 1 is the Main Platform for trains to Crewe
Platform 2 is the Main Platform for services to Manchester Piccadilly.
Platform 3 is a Bidirection Platform, which is sometimes used to terminate late running services from Manchester Piccadilly or to allow stopping services to be looped, so that faster services can overtake. The 0735 to Manchester Oxford Road is scheduled to use this platform.
The station does not have a waiting room, toilets or ATM facilities. [1]
References
- ^ "Sandbach (SDB)". Retrieved 2013-08-04.
External links
- Train times and station information for Sandbach railway station from National Rail
- Crewe-Manchester Community Rail Partnership
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Northern Rail |
53°09′00″N 2°23′38″W / 53.150°N 2.394°W