Sidaoqiao station: Difference between revisions
Appearance
Content deleted Content added
m Eti15TrSf moved page Sidaoqiao station to Sidao Qiao station: per https://www.bjsubway.com/jpg.html |
No edit summary |
||
Line 1: | Line 1: | ||
{{short description|Beijing Subway station}} |
{{short description|Beijing Subway station}} |
||
{{Infobox station |
{{Infobox station |
||
| name = |
| name = Sidao Qiao |
||
| native_name = 四道桥 |
| native_name = 四道桥 |
||
| native_name_lang = zh-Hans |
| native_name_lang = zh-Hans |
||
Line 41: | Line 41: | ||
}} |
}} |
||
''' |
'''Sidao Qiao station'''<ref>https://www.bjsubway.com/jpg.html</ref> ({{zh|s=四道桥站 |t=四道橋站 |p=Sìdàoqiáo Zhàn}}) is a station on [[Line S1, Beijing Subway|Line S1]] of the [[Beijing Subway]], it was opened on 30 December 2017.<ref>{{cite web|url=http://beijing.qianlong.com/2017/1228/2285132.shtml|script-title=zh:三条地铁新线12月30日开通 公交优化调整接驳新地铁|accessdate=2017-12-29}}</ref> |
||
== Station Layout == |
== Station Layout == |
||
The station has 2 elevated [[side platforms]]. |
The station has 2 elevated [[side platforms]]. |
Revision as of 20:56, 7 January 2021
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | East Shilong Road (石龙东路) Sidaoqiao, Yongding, Mentougou District, Beijing China | ||||||||||
Coordinates | 39°54′58″N 116°08′02″E / 39.91603°N 116.13401°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line S1 | ||||||||||
Platforms | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2017 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Sidao Qiao station[1] (simplified Chinese: 四道桥站; traditional Chinese: 四道橋站; pinyin: Sìdàoqiáo Zhàn) is a station on Line S1 of the Beijing Subway, it was opened on 30 December 2017.[2]
Station Layout
The station has 2 elevated side platforms.
Exits
There are 2 exits, lettered A and B. Exit B is accessible.
References
- ^ https://www.bjsubway.com/jpg.html
- ^ 三条地铁新线12月30日开通 公交优化调整接驳新地铁. Retrieved 2017-12-29.