Nanyang Crescent MRT station
JW4
Nanyang Crescent 南洋弯 நன்யாங் க்ரெஸ்ஸன் | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||
General information | ||||||||||||||||
Coordinates | 1°20′54″N 103°40′51″E / 1.34836°N 103.68085°E | |||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | Side | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 1 | |||||||||||||||
Parking | Yes | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opening | 2029 | |||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).
History
On 9 May 2018, the Land Transport Authority (LTA) announced that Jurong Pier station would be part of the proposed JRL.[1][2] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to this station from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028.[3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.[4]
The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 miles) of associated viaducts – Contract J113[5] – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.[6]
Location
The station will serve the JRL and will be located between the Nanyang Gateway and Peng Kang Hill stations. The official station code will be JW4.[7] The station complex will be located with the Nanyang Technological University (NTU), along Nanyang Drive near the junction with Nanyang Walk.[8]
References
- ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". CNA. 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ Lim, Adrian (9 May 2018). "New Jurong Region Line to boost access for NTU students". The Straits Times. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "News Room - News Releases - Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West". Land Transport Authority. 9 April 2021. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 9 April 2021. Retrieved 24 March 2021.
- ^ "Contract J113" (PDF). Land Transport Authority. Archived (PDF) from the original on 9 April 2021. Retrieved 9 April 2021.
- ^ "Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded". Land Transport Authority. 6 April 2021. Archived from the original on 6 April 2021. Retrieved 8 April 2021.
- ^ "Future system map" (PDF). Land Transport Authority. Archived (PDF) from the original on 5 April 2021. Retrieved 9 April 2021.
- ^ "JW4 Nanyang Crescent MRT station". Land Transport Authority. Archived from the original on 20 April 2021. Retrieved 20 April 2021.