×
Apr 24, 2018 · Rescheduling is a necessary procedure for a flexible job shop when newly arrived priority jobs must be inserted into an existing schedule.
This paper deals with bi-objective. FJRPs to minimize: 1) instability and 2) one of the following indices: a) makespan; b) total flow time; c) machine work-.
In the proposed discrete Jaya algorithm (DJaya), one can- didate solution should include both machine assignment and operation sequence for FJRP. A simple ...
Rescheduling is a necessary procedure for a flexible job shop when newly arrived priority jobs must be inserted into an existing schedule.
May 1, 2019 · This paper discretizes a novel and simple metaheuristic, named Jaya, resulting in DJaya, and improves it to solve FJRP for new job insertion ...
Nov 13, 2016 · A discrete Jaya algorithm was developed for dynamic FJSP with new job insertions [20], which was also improved to a two-stage Jaya algorithm for rescheduling ...
A discrete Jaya algorithm was developed for dynamic FJSP with new job insertions [20], which was also improved to a two-stage Jaya algorithm for ...
Gao et al. studied a flexible job shop rescheduling problem for new job insertion and discretized the update mechanism of the Jaya algorithm, and the results ...
Apr 16, 2024 · The flexible job shop scheduling problem (FJSP) is an NP-hard combinatorial optimization problem, which has wide applications in the real world.
An improved Jaya algorithm for solving the flexible job shop scheduling problem with transportation and setup times. https://doi.org/10.1016/j.knosys.