PJ Construction

1.5M ratings
277k ratings

See, that’s what the app is perfect for.

Sounds perfect Wahhhh, I don’t wanna

Pile foundation work

image

Foundations relying on driven piles often have groups of piles connected by a pile cap (a large concrete block into which the heads of the piles are embedded) to distribute loads which are larger than one pile can bear. Pile caps and isolated piles are typically connected with grade beams to tie the foundation elements together; lighter structural elements bear on the grade beams, while heavier…

View On WordPress

Pile foundation work

Foundations relying on driven piles often have groups of piles connected by a pile cap (a large concrete block into which the heads of the piles are embedded) to distribute loads which are larger than one pile can bear. Pile caps and isolated piles are typically connected with grade beams to tie the foundation elements together; lighter structural elements bear on the grade beams, while heavier…

View On WordPress

Dewatering work

image

Dewatering system by driving bore pipes of suitable dia to required depth at suitable intervals all over / around the entire site , interconnecting all the bore pipes with bigger dia pvc pipes at top and connecting to the motor pump(2.0 Hp) of required numbers to discharge the water away from site including shifting when required with all men material, mobilization and demobilization etc complete…

View On WordPress