Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Issue title: Special Section: Advances in intelligent computing for diagnostics, prognostics, and system health management
Guest editors: Chuan Li and José Valente de Oliveira
Article type: Research Article
Authors: Pei, Hong | Si, Xiaosheng; * | Hu, Changhua; * | Wang, Zhaoqiang | Du, Dangbo | Pang, Zhenan
Affiliations: Department of Automation Engineering, Xi’an Institute of High-Tech, Xi’an, China
Correspondence: [*] Corresponding author. Xiaosheng Si and Changhua Hu, Department of Automation Engineering, Xi’an Institute of High-Tech, Xi’an 710025, P.R. China. Tel.: +86 029 84743949; E-mails: [email protected] (X. Si) and [email protected] (C. Hu).
Abstract: As the essential component of prognostic and health management (PHM), life prediction for equipment plays a more and more significant role in recent years. However, current studies cannot fully consider the influence of imperfect maintenance activities that the equipment may experience on the degradation process and prognostic result. In this paper, we propose a degradation model subjected to the influence of imperfect maintenance for life prediction. Firstly, the multi-stage Wiener process is employed to characterize the influence of imperfect maintenance activities on the degradation level and degradation rate. Then, the theoretical expression of life probability distribution is derived under the concept of first hitting time using the convolution operation, and the approximate expression of life probability distribution is evaluated by the Monte Carlo simulation algorithm. Furthermore, we utilize the maximum likelihood estimation (MLE) to estimate unknown parameters in the concerned model. Finally, a numerical example and a practical case study are provided to substantiate the practicality and effectiveness of the newly proposed life prediction method. The results indicate that the proposed model can guarantee that the relative error (RE) is almost below 5%.
Keywords: Life prediction, imperfect maintenance, multi-stage Wiener process, Monte Carlo, maximum likelihood estimation
DOI: 10.3233/JIFS-169544
Journal: Journal of Intelligent & Fuzzy Systems, vol. 34, no. 6, pp. 3695-3705, 2018
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
[email protected]
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office [email protected]
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
[email protected]
For editorial issues, like the status of your submitted paper or proposals, write to [email protected]
如果您在出版方面需要帮助或有任何建, 件至: [email protected]