Jump to content

Blyth Harbour Wind Farm

Coordinates: 55°07′20″N 1°29′25″W / 55.1222°N 1.49027°W / 55.1222; -1.49027
From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Blyth Harbour Wind Farm
Map
CountryEngland, United Kingdom
LocationEast Bedlington at the Port of Blyth, Northumberland
Coordinates55°07′20″N 1°29′25″W / 55.1222°N 1.49027°W / 55.1222; -1.49027
StatusOperational
Commission dateJanuary 1993
OwnerHainsford Developments (Blyth Harbour) Limited
Site elevation5 ft
Power generation
Units operational9 × 0.3 MW
Make and modelWindMaster
Nameplate capacity2.7 MW
External links
CommonsRelated media on Commons

Blyth Harbour Wind Farm is a coastal wind farm located in East Bedlington along the East Pier of the Port of Blyth. Commissioned in January 1993 it consists of nine 0.3 MW WindMaster turbines giving a total capacity of 2.7 MW. It was developed by AMEC Wind and is owned by Hainsford Developments (Blyth Harbour) Limited.[1]

Repowering

In January 2008 consent was granted to replace the existing nine turbines with seven new ones. Six of these would generate 2.5 MW each, and a seventh larger one would produce 7.58 MW (if it is an Enercon E-126)and be the largest land-based turbine in Europe at 163 m (535 ft) tall.[2]

As of September 2012, the first new turbine became operational, producing up to 3.4 MW of power (more than the original nine turbines combined). The turbine is a REpower 3.4M104, with a 76 m hub height.

References

  1. ^ "RenewableUK - UKWED Operational wind farms". Archived from the original on 2 November 2012. Retrieved 11 December 2015.
  2. ^ "JournalLive - News - Today's News - Giant wind turbine is set for go-ahead". Archived from the original on 7 March 2012. Retrieved 5 November 2009.