Piping & Plant
Engineering and construction companies build models as best practice during the preliminary design stage to achieve optimal design. Engineers are able to make alterations to their design to eliminate costly errors during the use of orthographics.
Unnecessary structure or piping interference during the actual construction can be avoided and will help to save both time and money.