Projects:
A244 Walton Bridge/Walton on Thames, Surrey
The new bridge was created to replace two existing temporary bridges, across the River Thames. This was the first bridge to be built over the River Thames for 20 years
EMJ designed and manufactured various length Type 11 & 12 Panels ranging from 2615mm to 3474mm in length also at various widths to suit the design requirements of the bridge.
EMJ designed, detailed, manufactured and delivered all the GRP Permadec panels to site in 6 weeks.
Key facts:
- EMJ Permadec panels are used as a safe working platform
- Deck area was 1757m2
- Variations in panel lengths and widths were produced to accommodate the designs
- There was minimized site cutting
Project: New Road Bridge built across the River Thames, between Walton-On-Thames and Shepperton
Employer: Surrey County Council
Consultant: Atkins
Contractor: Costain
Stage: Completed
Standard
Haunched
Cantilever
Complete Solution
Get in touch
For more information please contact one of our sales advisors on 01723 512224, email at [email protected] or fill our this form.