What is a Hybrid Work Model?
Hybrid means a thing made by a combination of two different elements and the resulting hybrid element acquires characteristics of both underline elements. The following topics of the hybrid model will be discussed here:
- What is the Hybrid Model?
- Why the Hybrid Model?
- When To Use a Hybrid Model
- Process of Hybrid Model
- Spiral And Prototype Model
- V&V and Prototype Model
- Advantages of Hybrid Model
- Disadvantages of the Hybrid Model
Let’s start discussing each of these topics in detail.
What is the Hybrid Model?
A hybrid Model is a model which is developed by combining two traditional models of SDLC. The base models can be anyone like a spiral model, V&V model, prototype model, etc. and the selection of models is as per requirements. By collaborating two base models the resulting hybrid Model acquires its properties, process, and benefits which results in building a more powerful, flexible, and effective Model. The combination of traditional models can be like:
- Spiral and Prototype Model
- V&V and Prototype Model
Why the Hybrid Model?
With the increasing use of agility in software development, the traditional model cannot be sustained as it does not help in fast delivery, achieve a high success rate, and cannot deal with changing customer requirements, this is all due to their lengthy process and standards. So, we need a hybrid Model as it:
- Has the benefits of two individual models.
- Resolve the dependency of models.
- Is suitable for both small and medium-sized systems.
- Involves customers at all phases of development.
- Helps in early delivery.
When To Use of a Hybrid Model?
A hybrid Model is developed when we combine two models and this development is useful when:
- The customer is not fixed on its system requirements.
- The requirements of the system cannot be met by using a single SDLC model.
- The organization wants to use agility but complexity is a barrier.
- A fully planned approach to the budget is needed.
- Teams of the organization want collaboration.
It is up to the organization to choose the best possible combination of base models to make a Hybrid Model that can fulfill both business and customer requirements.
Process of Hybrid Model
The hybrid model follows all phases of SDLC along with flexibility in using the required models:
- Planning: The first step to executing any successful work is correct planning and hence the first phase of the Hybrid Model is planning. Planning gives direction and a correct approach to how to do and manage things easily and correctly. In this phase of planning all senior members of an organization like the Product Manager, Delivery Manager, Sales manager, etc. involved and create a plan and explain it to other working members. Planning includes requirement ideas and inputs that help in getting the project execution approach and choosing the correct base models. This phase involves risk analysis, resource planning, and project planning.
- Requirements: In this phase, all requirements needed to develop the system are collected from the client which includes all functional and non-functional requirements of the system. Here, many requirement documents are developed as per the needs of the model. After collecting all requirements the Business Analyst analyzes them and with the help of other senior team members converts them into technical requirements called SRS (System Requirement Specification) which is helpful for the development team.
- Design: In the design phase, the architecture of the system is designed by the team members, they design a working model that specifies how the system will look, how control flows from screen to screen, and shows the functionality of different modules.
- Development: System building starts in this phase by developing the system code. Developers with their team members code the system using any programming language as specified by the organization by maintaining the coding standards. Developers code the system in module form and after coding the module, they compile it and verify it’s working as per requirements.
- Integration: In the integration phase, all tested and verified modules are united to make the complete system as the system is developed by breaking into modules, at a time single module goes through all phases of processing. The integrated product is used as input for testing.
- Testing: Testing means identifying bugs and informing the concerned developer about fixing them. The Testing phase runs parallel to the whole process of the Hybrid model from the start of the Planning phase and ends in the Integration phase. The testing team tests the processing of the system in the form of modules to validate that everything is working as per customer requirements. Testers write test cases and test plans to perform testing.
- Deployment: This is the final stage to hand over the system to the customer. In this phase, the tested developed system is deployed to the customer’s deployable environment for its use and experience.
- Maintenance: Taking care of the working system after delivery is called Maintenance. In this phase, after deployment, the customer uses the system and may face real-time issues that the organization needs to fix, and if issues are serious then the system needs to be rolled back to resolve the issue. This phase is also important as it maintains the image of the organization.
- Risk Analysis: This phase defines the risk involved in various phases of the Hybrid Model and it runs parallel to all phases of the Hybrid Model. It identifies the risk areas in different phases and points out them.
Spiral and Prototype Model
This Hybrid Model is a combination of the Spiral Model and Prototype Model.
- The Spiral Model is an iterative model combining the features of a linear sequential model in a controlled manner.
- A prototype Model is a model in which a brief and simple overview of the system is prepared, tested, reworked, and sent for customer review and verification.
This Hybrid model is used when:
- There is a dependency.
- The customer requirements change rapidly with the stages of processing.
- There is a risk involved in system functioning.
- Both developers and customers are new to the industry and cannot decide among the available models.
Let’s understand the processing of this Hybrid Model with its various stages:
1. Collection of Requirements: Working on software starts with the collection of requirements from the client. All functional and non-functional requirements are gathered from the customer and these requirements are the needs of application development. All senior members of the company are involved in collecting requirements and organizing them in a structured form by documentation which can be BRS and CRS documents. Here in the Hybrid Model, the system is broken down into small modules and developed in modules, not the whole system at a time. The Requirement stage includes further stages like:
- Prototype Design: After creating a BRS document from the requirements, a prototype is designed for a particular module which gives a brief overview of the module.
- Prototype Testing: After creating the prototype it is sent for testing where the testing team tests it to identify bugs and if the bug is found it is sent for fixing to the respective developer. The tester writes test cases, plans, and test scenarios.
- Prototype Review: The tested prototype is forwarded for customer review, where the customer reviews it and gives his opinion on rebuilding and retesting or the prototype is perfect. The above process of prototype goes on until the developing team gets a stable prototype.
2. Design: After getting a stable prototype it is sent for architectural design of the module. The design phase includes the architectural design of the module, workflow, and dependencies among modules.
3. Coding: In the coding phase, the module is coded by developers using their coding language and gives an executable form. The coded module is compiled by developers to confirm its working and dependency with other modules. There is a team of developers working on different modules of the system.
4. Testing: The coded module is finally sent for testing. The testing team tests the module to identify loopholes and if they are successful in catching them then, the module is re-sent to the concerned developer for its fixing, else module is transferred to the next stage of processing.
After testing, if everything is working as per direction then all modules are developed in the same manner and travel through all the above phases, at last, all modules are united to get a complete compiled system that is deployed to the customer environment for its use.
V&V And Prototype Model
This Hybrid Model is a combination of the V&V Model and Prototype Model.
- V&V Model: In this model, V&V stands for Verification and validation, and in this model, both validation and verification of the system go side by side.
- Prototype Model: A beautiful model where a prototype is built before developing the actual design of the system. The designed prototype is sent for testing, design, and customer review.
This Hybrid model is used when:
- The user wants parallel working of the verification and validation process.
- Good documentation is needed.
- The customer expects high-quality products with lots of testing.
- There is no issue of finance and the only requirement is a successful product.
The processing of this Hybrid Model includes the following stages:
1. Requirement Collection: Requirements are the basic needs for the development of software and by only requirement, we can plan its working, decide the processing needs, coding language, team members, number of days to deliver, and much more. The requirements of the system are collected from customers which go for documentation and testing. The requirements collected from the customer are further converted into a CRS document that contains simple, non-technical requirements and is sent to the tester where:
- Tester reviewed the CRS document.
- Write Acceptance Testing by preparing test cases and test plans.
2. BRS and Prototype Design: The CRS document developed in the previous stage is used to build a BRS document by Business Analyst which contains technical information for its understanding at the business level. BRS contains bar graphs, data flow diagrams, ER diagrams, etc. From the BRS web developers design and develop a prototype which is reviewed and sent for testing. in testing testers:
- Review the document.
- Carry out System testing.
After that, testers test the prototype if some bug is found it is sent for fixing to the design team. The tested prototype is sent for customer review and verification. In case the customer is not satisfied with the designed prototype it is sent for rebuilding it is forwarded to the next processing stage.
3. HLD (High-Level design): After getting customer customer-approved prototype it is sent to HLD, where its architecture is designed and understood by developers. Different technical approaches are involved to design the best feasible architecture which includes workflow, dependencies, functionalities of modules, database design, tables, and interface relationships. The designed HLD is passed to the next stage of testing, where testers:
- Review the HLD.
- Write Integration Testing documents and write test cases and test plans to execute the testing process.
4. LLD (Low-Level Design): This phase is for designing the LLD document of the prototype. In this phase, the LLD document is prepared which contains detailed information about the working prototype like the type of programming language, compatibility of all modules, and functioning of modules. After designing the LLD it is sent for testing, where the tester:
- Review the LLD.
- Write functional Testing, test cases, and test plans to carry out the testing process.
5. Coding: This phase includes coding of the particular prototypes by the developers using their coding language as directed by their team leaders, the coding must follow all coding standards and guidelines. The coded prototype goes for testing, where testers perform Unit Box testing to find bugs and check extreme conditions of the module.
This process is going on until we get stable prototypes and all modules. And at last, it is delivered to the customer.
What are some variations of the hybrid working model?
- Flexible Hybrid Model: The working days in the office and remote are self-selected by workers.
- Fixed Hybrid Model: Some workdays are done at home while others are done in office.
- Office-First Hybrid Model: Initially, it is upon employees to decide whether they want to work from their homes or offices on any given day.
- Remote-First Hybrid Model: Remote work is the default; office used occasionally.
- Role-Based Hybrid Model: Hybrid structure varies by job role.
- Team-Based Hybrid Model: Different teams have different hybrid arrangements.
- Split-Week Hybrid Model: Part of the week in-office, part remote.
- Hybrid Model with Core Hours: This approach combines flexibility with core hours that must be worked together by the whole team regardless of location.
- Project-Based Hybrid Model: In-office during critical project phases, remote otherwise.
- Hybrid Model with Hot Desking: Employees book desks rather than having assigned ones.
Why HR Leaders Should Care About the Hybrid Work Model
- Employee Satisfaction: Boosts employee morale through increased flexibility.
- Talent Attraction and Retention: Attracts top talent who value work-life balance.
- Cost Efficiency: It reduces physical space related costs associated with overhead expenses.
Advantages vs. Disadvantages of the Hybrid Work Model
Advantages | Disadvantages |
---|---|
Increased flexibility | Potential for communication issues |
Improved work-life balance | Security and data privacy concerns |
Cost savings | Challenges in team cohesion |
Access to a broader talent pool | Difficulty in managing hybrid teams |
Implementing a Successful Hybrid Work Model
- Clear Policies: Set standards for remote and office work.
- Technology Support: It equips remote employees with must have gadgets.
- Employee Training: Train managers and employees on hybrid work best practices.
Tips for Creating a Hybrid Work Model That Works for Everyone
- Solicit Employee Feedback: Find out about their preferences and concerns.
- Set Clear Goals: It define productivity metrics and goals.
- Encourage Collaboration: Utilize technology for teamwork development.
- Prioritize Well-being: It ensure availability of mental health support services to staff members.
Real-World Examples of Hybrid Work Models
- Tech Companies: For many tech firms like Google and Microsoft have adopted hybrid models, offering flexibility in work locations.
- Consulting Firms: For companies like Deloitte and PwC use hybrid models to balance client needs with employee flexibility.
How the Hybrid Work Model Improves Company Culture
- Inclusive Environment: Flexibility can be offered here by addressing diverse employee needs.
- Increased Autonomy: It makes workers manage their own time.
- Enhanced Collaboration: Advices on the utilization of digital tools which help to enhance communication
How HR Tech Helps with Hybrid Work Challenges
- HR Software: Streamlines HR processes, including payroll, benefits and employee management.
- Communication Tools: Such as Slack and Teams enables communication in real-time.
- Performance Management: Tools for tracking employee performance and feedback.
Conclusion
The hybrid model in both software development and workplace structure is a balanced approach leveraging the best in multiple methodologies or working styles, it brings about flexibility, efficiency as well as better satisfaction for developers or employees, though it has its own set of challenges, with careful planning, clear communication and right tools hybrid models can be highly effective.
FAQs
How can an organization decide which hybrid model to use?
Project magnitude, intricacy, client specifications and team collaboration needs are among other things that determine it.
What are the usual challenges of executing a hybrid work design?
There are issues such as cross-cultural communication, information security and group dynamics associated with this system for varied workplaces.
Can a hybrid work design be used across all types of organizations?
Although modifiable for many firms and it is only effective when aligned with organizational workflow and provision for remote working.