Skip to content
Search for easy dinners, fashion, etc.
When autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
Pin on Urban planning Градостроительство Проекты
Explore
a drawing shows the location of different lines
1
ecode360.com

Foundation Plan

Lot line: the boundary line of a lot. Setback: the minimum distance from the property line into which a structure may not extend. Buildable area: the net ground area of a lot which can be covered by a building after required setbacks and other zoning limitations have been accounted for. Lot: the smallest identifiable parcel of land in a city.
painter777
painter777

Comments