When autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
Lot line: the boundary line of a lot. Setback: the minimum distance from the property line into which a structure may not extend. Buildable area: the net ground area of a lot which can be covered by a building after required setbacks and other zoning limitations have been accounted for. Lot: the smallest identifiable parcel of land in a city.