Aufseßplatz station: Difference between revisions
Appearance
Content deleted Content added
No edit summary |
|||
Line 8: | Line 8: | ||
| country = |
| country = |
||
| coordinates = {{Coord|49.4404234|N|11.0809894|E|display=inline,title}} |
| coordinates = {{Coord|49.4404234|N|11.0809894|E|display=inline,title}} |
||
| line = [[File:Nürnberg U1.svg|x15px|link=U1 (Nuremberg U-Bahn)]] |
| line = [[File:Nürnberg U1.svg|x15px|link=U1 (Nuremberg U-Bahn)]] |
||
| structure = underground |
| structure = underground |
||
| platform = |
| platform = |
||
Line 44: | Line 44: | ||
[[File:Aerial Nuremberg Aufsessplatz.jpg|thumb|Aerial of Aufseßplatz]] |
[[File:Aerial Nuremberg Aufsessplatz.jpg|thumb|Aerial of Aufseßplatz]] |
||
'''Aufseßplatz''' is a [[Nuremberg U-Bahn]] [[List of Nuremberg U-Bahn stations|station]], located on the [[Nuremberg U-Bahn|U1]] |
'''Aufseßplatz''' is a [[Nuremberg U-Bahn]] [[List of Nuremberg U-Bahn stations|station]], located on the [[Nuremberg U-Bahn|U1]] line. |
||
An unused [[tunnel]] stub for a connection curve exists south of the station on the side of the north-bound track. This curve was meant as connection to another [[subway (rail)|subway]] line from Plärrer to Dutzendteich, which never got beyond an early planning stage. |
An unused [[tunnel]] stub for a connection curve exists south of the station on the side of the north-bound track. This curve was meant as connection to another [[subway (rail)|subway]] line from Plärrer to Dutzendteich, which never got beyond an early planning stage. Like [[Plärrer (Nuremberg U-Bahn)|Plärrer]], [[Hauptbahnhof (Nuremberg U-Bahn)|Hauptbahnhof]] and the much later [[Friedrich Ebert Platz (Nuremberg U-Bahn)|Friedrich Ebert Platz]] orange tiles were used to indicate a possible interchange station. However, as of 2020 only ''Plärrer'' and ''Hauptbahnhof'' actually are interchange stations between different subway mainlines. |
||
==References== |
==References== |
Revision as of 10:47, 23 October 2020
Nuremberg U-Bahn station | ||||||||||||||||
General information | ||||||||||||||||
Location | Wölckernstraße 90459 Nürnberg, Germany | |||||||||||||||
Coordinates | 49°26′26″N 11°04′52″E / 49.4404234°N 11.0809894°E | |||||||||||||||
Operated by | Verkehrs-Aktiengesellschaft Nürnberg | |||||||||||||||
Line(s) | ||||||||||||||||
Connections | ||||||||||||||||
Construction | ||||||||||||||||
Structure type | underground | |||||||||||||||
Other information | ||||||||||||||||
Fare zone | VGN: 100[1] | |||||||||||||||
History | ||||||||||||||||
Opened | 23 September 1975 | |||||||||||||||
Services | ||||||||||||||||
|
Aufseßplatz is a Nuremberg U-Bahn station, located on the U1 line.
An unused tunnel stub for a connection curve exists south of the station on the side of the north-bound track. This curve was meant as connection to another subway line from Plärrer to Dutzendteich, which never got beyond an early planning stage. Like Plärrer, Hauptbahnhof and the much later Friedrich Ebert Platz orange tiles were used to indicate a possible interchange station. However, as of 2020 only Plärrer and Hauptbahnhof actually are interchange stations between different subway mainlines.
References
- ^ "Tarifzonenplan: Nürnberg, Fürth" (PDF). Verkehrsverbund Großraum Nürnberg. 1 January 2019. Retrieved 20 October 2019.