Loading AI tools
American semiconductor manufacturer From Wikipedia, the free encyclopedia
Wolfspeed, Inc. is an American developer and manufacturer of wide-bandgap semiconductors, focused on silicon carbide and gallium nitride materials and devices for power and radio frequency applications such as transportation, power supplies, power inverters, and wireless systems. The company was formerly named Cree, Inc.[1]
Formerly | Cree, Inc. (1999–2021) |
---|---|
Company type | Public |
Industry | Electronics |
Founded | 1987 |
Headquarters | Research Triangle Park, North Carolina, U.S. |
Products | Wide-bandgap semiconductors |
Revenue | US$807 million (2024) |
US$–445 million (2024) | |
US$–864 million (2024) | |
Total assets | US$7.98 billion (2024) |
Total equity | US$882 million (2024) |
Number of employees | 5,013 (2024) |
Website | wolfspeed |
Footnotes / references [1] |
Cree Research was founded in July 1987 in Durham, North Carolina. Five of the six founders – Neal Hunter, Thomas Coleman, John Edmond, Eric Hunter, John Palmour, and Calvin Carter – are graduates of North Carolina State University.[2]
In 1983, the founders – one a research assistant professor and the others student researchers – were seeking ways to leverage the properties of silicon carbide to enable semiconductors to operate at higher operating temperatures and power levels. They also knew silicon carbide could serve as the diode in light-emitting diode (LED) lighting, a light source first demonstrated in 1907 with an electrically charged diode of silicon carbide. The research team devised a way to grow silicon crystals in the laboratory, and in 1987 founded the company to produce SiC[clarification needed] to be used commercially in both semiconductors and lighting.[3]
In 1989, the company introduced the first blue LED, enabling the development of large, full-color video screens and billboards.[4]
In 1991, the company released the first commercial silicon carbide wafer.[5]
In 1993, the company became a public company via an initial public offering.[6]
In 1999, the company name was changed from Cree Research to Cree, Inc.[7]
In 2011, the company acquired Ruud Lighting for $525 million.[8]
In August 2011, the company announced the XLamp XT-E Royal Blue LED for use in remote phosphor lighting.[9]
In 2013, the company's first consumer products, two household LED bulbs, qualified for Energy Star rating by the United States Environmental Protection Agency.[10]
In July 2016, Infineon Technologies agreed to acquire the company's Wolfspeed RF and power electronics devices unit for $850 million. However, the deal was terminated in February 2017 due to regulators’ national security concerns.[11]
In March 2018, the company acquired the RF Power Business Infineon Technologies AG's for €345 million.[12]
In May 2019, the company sold its Lighting Products division (now branded as Cree Lighting) to Ideal Industries.[13]
In September 2019, the company announced a $1 billion investment in a semiconductor manufacturing plant in Marcy, New York to build the world’s largest silicon carbide fabrication facility with a $500 million grant from New York State.[14][15][16]
In March 2021, the company sold its LED Business to SMART Global Holdings for up to $300 million.[17]
In October 2021, the company changed its name to Wolfspeed.[18]
In April 2022, the Marcy, New York, facility opened.[19] New York Governor Kathy Hochul[20] and US Senator Chuck Schumer[19] spoke at the event.
In November 2022, the company announced that co-founder and Chief Technology Officer John Palmour had died.[21]
In February 2023 it announced it would build its first European factory in Germany.[22] It is supposed to be on the site of a former coal plant in Ensdorf, Saarland with ZF Friedrichshafen as a coinvestor and susidized by the EU as an important project of common European interest (IPCEI) for Microelectronics and Communication Technologies.[23]
In August 2023, it was announced the Lowell-headquartered semiconductor company, MACOM had entered into a definitive agreement to acquire Wolfspeed's RF business.[24]
In June 2024, Wolfspeed has delayed its $3 billion semiconductor plant in Germany to mid-2025, reflecting the EU's challenges in boosting local chip production. The delay underscores issues with the EU Chips Act, as few projects have progressed, jeopardizing the goal of achieving 20% global market share by 2030.[25] Wolfspeed announced the project's indefinite hold in October 2024, citing low demand.[26] As a result, ZF ceased to take part in the project.
In October 2024, the Biden Administration announced that it would provide Wolfspeed with up to $750 million in direct funding to support the company's new silicon carbide factory in North Carolina that makes the wafers used in advanced computer chips and its factory in Marcy, New York. [27]
On October 13, 2022, a facilities electrician was electrocuted at the Wolfspeed Research Triangle Park in Durham, North Carolina. The incident sparked a state investigation into his death as well as public concern for the company's poor work safety record.[28] State Department of Labor investigations into the company have uncovered 17 workplace safety violations between 2012 and 2023, including six serious violations.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.