Abstract
Production systems are composed of increasingly complex components with unique specifications. Therefore, since holding safety stocks of each component would be prohibitive, maintenance activities rely on the proper delivery of spare parts, making it available at the right time and place. Equipments monitored by sensors as well as the transmission of sensors data to the spare part supply chain represent an interesting venue for dealing with this contemporaneous industrial challenge. In this direction, this paper applies a simulation model derived from a real world scenario to analyze the performance of the collaboration between condition-based maintenance – also known as intelligent maintenance systems – and spare parts supply chains, in comparison with existing maintenance approaches. Obtained results substantiate the potential of monitoring, treating and transmitting equipment condition data to ensure cost-effective maintenance and production systems availability.
Funding: Coordenação de Aperfeiçoamento de Pessoal de Nível Superior, (Grant/Award Number: “BRAGECRIM Project I2MS2C”)
Bibliography
[1] A. Alrabghi and A. Tiwari, A novel approach for modelling complex maintenance systems using discrete event simulation, Reliab. Eng. Syst. Safe. 154 (2016), 160–170.10.1016/j.ress.2016.06.003Search in Google Scholar
[2] C. M. Banks. What is Modeling and Simulation. Principles of Modeling and Simulation. Wiley, 2009.10.1002/9780470403563Search in Google Scholar
[3] J. Banks, J. S. Carson and B. L. Nelson, Discrete-Event system simulation, Prentice Hall, New Jersey, 1996.Search in Google Scholar
[4] J. Banks, J. S. Carson and B. L. Nelson, Discrete-Event system simulation, Prentice Hall, Englewood Cliffs, NJ, USA, 2000.Search in Google Scholar
[5] S. Botelho, N. Duarte, B. Hellingrath, M. A. A. Bichet, D. B. Espindola, C. E. Pereira, A. Cordes, R. Henriques, E.M. Frazzon and A. Rettberg, Towards intelligent maintenance systems: rescuing human operator and context factors, in: Proceedings of the 19th IFAC World Congress, pp. 7110–7115, 2014.10.3182/20140824-6-ZA-1003.02367Search in Google Scholar
[6] J. E. Boylan and A. A. Syntetos, Spare parts management: a review of forecasting research and extensions, IMA J. Manage. Math. 21 (2010), 227–237.10.1093/imaman/dpp016Search in Google Scholar
[7] A. Dolgui and M. Pashkevich, Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance, Int. J. Prod. Econ. 112 (2008), 885–894.10.1016/j.ijpe.2007.07.008Search in Google Scholar
[8] D. Espindola, E. M. Frazzon, B. Hellingrath and C. E. Pereira, Integrating intelligent maintenance systems and spare parts supply chain, Inf. Control Prob. Manuf. 14 (2012), 1017–1022.10.3182/20120523-3-RO-2023.00384Search in Google Scholar
[9] E. M. Frazzon, E. Israel, A. Albrecht, C. E., Pereira and B. Hellingrath, Spare parts supply chains’ operational planning using technical condition information from intelligent maintenance systems, Annu. Rev. Contr. 38 (2014), 147–154.10.1016/j.arcontrol.2014.03.014Search in Google Scholar
[10] I. Heckmann, Simulation for supply chain analysis, in: Towards Supply Chain Risk Analytics, Springer Fachmedien, Wiesbaden, pp. 165–179, 2016.10.1007/978-3-658-14870-6_6Search in Google Scholar
[11] B. Hellingrath and A. Cordes, Conceptual approach for integrating condition monitoring information and spare parts forecasting methods, Prod. Manuf. Res.Open Access J. 2 (2014), 725–737.10.1080/21693277.2014.943431Search in Google Scholar
[12] B. Hellingrath and A. Cordes, Conceptual approach for integrating tactical spare parts inventory management and transport planning, Industrial Informatics (INDIN), 2014 12th IEEE International Conference on, pp. 548–553, 2014.Search in Google Scholar
[13] B. Hellingrath and P. Kuppers, Multi-Agent Based Evaluation of Collaborative Planning Concepts in Heterarchical Supply Chains, Logistikmanagement: Herausforderungen, Chancen; Lösungen, Band III, 1–22, 2011.10.1007/978-3-642-23181-0_15Search in Google Scholar
[14] B. Hellingrath, C. E. Pereira, D. Espindola, E. M. Frazzon, A. Cordes, P. Saalmann and M. Zuccolotto, On the integration of intelligent maintenance and spare parts supply chain management, IFAC-PapersOnLine, 48 (2015), 983–988.10.1016/j.ifacol.2015.06.211Search in Google Scholar
[15] J. Huiskonen, Maintenance spare parts logistics: Special characteristics and strategic choices, Int. J. Prod. Econ. 71 (2001), 125–133.10.1016/S0925-5273(00)00112-2Search in Google Scholar
[16] E. F. Israel, Planejamento Operacional de Cadeias de Suprimentos de Pecas de Reposicao Integrado com Sistemas Inteligentes de Manutenção, Federal University of Santa Catarina, Florianopolis, Brazil, 2014.Search in Google Scholar
[17] J. Lee, J. Ni, D. Djurdjanovic, H. Qiu and H. Liao, Intelligent prognostics tools and e-maintenance, Comp. Ind. 57 (2006), 476–489.10.1016/j.compind.2006.02.014Search in Google Scholar
[18] J. F. O’Kane, J. R. Spenceley and R. Taylor, Simulation as an essential tool for advanced manufacturing technology problems, J. Mater. Process. Tech. 107 (2000), 412–424.10.1016/S0924-0136(00)00689-0Search in Google Scholar
[19] F. Persson and J. Olhage, Performance simulation of supply chain designs, Int. J. Prod. Econ. 77 (2002), 231–245.10.1016/S0925-5273(00)00088-8Search in Google Scholar
[20] F. Pirard, S. Iassinovski and F. Riane, A simulation based approach for supply network control, Int. J. Prod. Res. 49 (2011), 7205–7226.10.1080/00207543.2010.518726Search in Google Scholar
[21] T. Regal, P. Saalmann, A. Cordes, A. Giacomolli, C. E. Pereira and B. Hellingrath, Integration architecture of intelligent maintenance systems and spare parts supply chain planning, Procedia CIRP, 25 (2014), 192–198.10.1016/j.procir.2014.10.029Search in Google Scholar
[22] P. Saalmann, M. Zuccolotto, T. Regal, C. Wagner, A. Giacomolli, B. Hellingrath and C. E. Pereira, Application potentials for an ontology-based integration of intelligent maintenance systems and spare parts supply chain planning, in: 48th CIRP Conference on Manufacturing Systems, CIRP, vol. 41, pp. 270–275, 2016.10.1016/j.procir.2015.12.135Search in Google Scholar
[23] N. Sakurada and D. I. Miyake, Aplicacao de simuladores de eventos discretos no processo de modelagem de sistemas de operacoes de servicos, Gestao e Producao, 16 (2009), 25–43.10.1590/S0104-530X2009000100004Search in Google Scholar
[24] E. Zeeb, G. Moritz, D. Timmermann and F. Golatowski, WS4D: Toolkits for networked embedded systems based on the devices profile for web services, in: Parallel Processing Workshops (ICPPW) 39th International Conference, vol. 39, pp. 1–8, 2010.10.1109/ICPPW.2010.11Search in Google Scholar
©2019 Walter de Gruyter GmbH, Berlin/Boston