Job description: Document Controller-Technical/ Design Department MANAGEMENT SYSTEM RESPONSIBILITIES Raise suggestion as to improve the system of working. Follow the relevant procedure of the ISO or company’s QHSE procedure or the department’s Standard Operating Procedure (SOP) HANDLING OF CONTRACTS Receive all the
Read More
The purpose of Survey work will include, but not be limited, to the following; Initial Surveys to confirm the site boundaries (plot boundaries); establish permanent marks and record site levels and details. Set out for control of formwork and all other structures.
Read More
Below method statement covers the method and procedures for installation of fire fighting sprinkler pipe works inside the building. The method of statement is applicable to all internal fire fighting pipes, riser works and sprinklers. Reference Documents: Approved Drawings. Project Specification. NFPA
Read More
This document describes the methods proposed to be used for the erection operations related to the air cooled condenser for any kind of plant project. Method statement identifies the general steps, arrangements and precautions for the assembly and erection works of ACC.
Read More
This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Rock Blasting activity, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work. Location
Read More
Below is a precise RCC work building construction method statement that covers Casting of Foundation, Neck column, Tie beam, Grade Slab, Columns, Core & shear walls, Beams & Suspended Slab according to specified drawings and quality standards. The contractor’s approved shop drawing
Read More
Lead the department activities related to projects and corporate office / head office. Raise suggestions to improve the system of working within the project and the company. Follow the relevant procedures of the quality management system. Raise NCR to the non-conforming procedures
Read More
Below is a detailed chilled water pipe flushing procedure that covers cleaning, flushing and chemical treatment requirements for an existing or new project. Flushing of chilled water system shall be done as per the guidelines and requirements mentioned in the project specifications