Effects of Large-Diameter Rebar Replacement on Seismic Behavior of Precast Concrete Columns with Grouted Sleeve Connections
Abstract
:1. Introduction
2. General Behavior
2.1. Tested Specimens and Material Properties
2.2. Loading Scheme
2.3. Measurement Types and Arrangement
3. Experimental Observations and Failure Modes
3.1. Cast-in-Place Columns
3.2. Prefabricated Concrete Columns
4. Experimental Result Analysis
4.1. Load-Displacement Hysteretic Loops and Skeleton Curve
4.1.1. Influence of Column Fabrication Method
4.1.2. Influence of the Diameter of Longitudinal Rebar
4.1.3. Effects of the Axial Compressive Ratio
4.2. Stiffness Degeneration
4.2.1. Influence of Column Fabrication Method
4.2.2. Influences of Large-Diameter Rebar Replacement and Axial Compressive Ratio
4.3. Displacement Ductility
4.4. Energy-Dissipation Capacity
4.5. Hysteretic Loops of Reinforcement Strain
4.5.1. Longitudinal Rebar
4.5.2. Transverse Reinforcements
5. Conclusions and Suggestions
- (1)
- Under low-cycle reverse loading, increasing the diameter of longitudinal rebar, the bonding stress required between the rebars and concrete increased, which resulted in the crack pattern changing from diagonal cracks just beyond the grouted sleeve region to bond failure around the longitudinal rebar bars. Furthermore, the bond-slip of the rebars became evident, especially in the PC columns with a longitudinal rebar diameter of 32 mm under an axial compressive ratio of 0.3. It made the energy-dissipation capacity and ductility of PC columns decrease with the increase in the diameter of longitudinal rebar.
- (2)
- The longitudinal bar diameter had little effect on the cracking load, and the cracking load of the specimens with an axial compressive ratio of 0.6 was greater than that of the specimens with an axial compressive ratio of 0.3. The cracking load of PC columns was greater than that of CIP columns. When the diameter of the longitudinal rebar increased from 18 mm to 22 mm, the yield load and ultimate load of PC columns increased. Conversely, when the diameter of the longitudinal rebar increased from 22 mm to 32 mm, the yield load and ultimate load of PC columns decreased. Thus, it is necessary to conduct more tests to deeply understand the effects of diameter of longitudinal rebar in the future.
- (3)
- For PC columns, a local rigid zone formed in the grouted sleeve region; thus, the effective length decreased under the horizontal load, the shear span ratio increased, and the overall lateral stiffness was enhanced compared to those of the CIP columns. Moreover, the load resistance was always greater, but ductility was poorer than those of the CIP columns.
- (4)
- PC columns reinforced with 32 mm diameter rebar had poorer seismic performance than the columns reinforced with 22 mm or 18 mm diameter rebar but with 100% and 200% increased assembly efficiency, respectively. When a precast column with 32 mm longitudinal reinforcement is used, to further eliminate the negative effects of large rebar replacement, it is recommended to design a much higher transverse reinforcement ratio at the grouted sleeve region. If possible, the strengthening region with closer transverse reinforcement spacing due to potential plastic hinge development should be extended to two times the depth of the column due to the fact that the position of the plastic hinge may be shifted upward beyond the grouted sleeve region.
- (5)
- In general, the reduction in seismic performance of precast columns caused by the replacement of large-diameter rebar is limited. In addition, it still has a large space for lifting. Compared with the potential improvement of assembly efficiency and construction quality, a precast column with large-diameter rebar is worthy of promotion.
Author Contributions
Funding
Data Availability Statement
Conflicts of Interest
References
- ACI 550.1R-09; Guide to Emulating Cast-in-Place Detailing Seismic Design of Precast Concrete Structures. American Concrete Institute: Detroit, MI, USA, 2009.
- ACI T1.2-03; Special Hybrid Moment Frames Composed of Discretely Jointed Precast and Post-Tensioned Concrete Members. American Concrete Institute: Detroit, MI, USA, 2003.
- PCI (Precast/Prestressed Concrete Institute). PCI Design Handbook: Precast and Prestressed Concrete, 7th ed.; Precast/Prestressed Concrete Institute: Chicago, IL, USA, 2010. [Google Scholar]
- FIB (The International Federation for Structural Concrete). Fib Model Code for Concrete Structures 2010; The International Federation for Structural Concrete: Lausanne, CH, USA, 2012. [Google Scholar]
- Kato, H.; Ichizawa, Y.; Takamatsu, K. Earthquake response of an eleven-story precast prestressed concrete building by substructure pseudo dynamic test. In Proceedings of the 12th World Conference on Earthquake Engineering, Auckland, New Zealand, 30 January–4 February 2000. [Google Scholar]
- JGJ 1-2014; Technical Specification for Precast Concrete Structures. China Architecture & Building Press: Beijing, China, 2014.
- JGJ 224-2010; Technical Specification for Framed Structures Comprised of Precast Prestressed Concrete Components. China Architecture & Building Press: Beijing, China, 2010.
- Park, R. A perspective on the seismic design of precast concrete structures in New Zealand. PCI. J. 1995, 40, 40–60. [Google Scholar] [CrossRef]
- Rave-Arango, J.F.; Blandón, C.A.; Restrepo, J.I.; Carmona, F. Seismic performance of precast concrete column-to-column lap-splice connections. Eng. Struct. 2018, 172, 687–699. [Google Scholar] [CrossRef]
- Yamashita, R.; Sanders, D.H. Seismic performance of precast unbonded prestressed concrete columns. ACI. Struct. J. 2009, 106, 821–830. [Google Scholar] [CrossRef]
- Kim, C.S.; Lim, W.Y.; Park, H.G.; Oh, J.K. Cyclic loading test for cast-in-place concrete-filled hollow precast concrete columns. ACI. Struct. J. 2016, 113, 205–215. [Google Scholar] [CrossRef]
- Bull, D.K. Guidelines for the Use of Structural Precast Concrete in Buildings. Centre for Advanced Engineering, University of Canterbury: Chirstchurch, New Zealand, 2000. [Google Scholar]
- Ong, H.Y. Experimental Study of Grout Filled Splice Sleeve Integrated with Shear Key for Precast Concrete Connection; Technological University of Malaysia: Johor, Malaysia, 2010. [Google Scholar]
- Ameli, M.J.; Parks, J.E.; Brown, D.N.; Pantelides, C.P. Seismic evaluation of grouted splice sleeve connections for reinforced precast concrete column-to-cap beam joints in accelerated bridge construction. PCI. J. 2015, 60, 80–103. [Google Scholar] [CrossRef]
- Ogura, K. Testing Program for the NMB Splice Sleeve; Splice Sleeve North America Inc.: Livonia, MI, USA, 2005. [Google Scholar]
- Tazarv, M. Saiidi MS. Seismic design of bridge columns incorporating mechanical bar splices in plastic hinge regions. Eng. Struct. 2016, 124, 507–520. [Google Scholar] [CrossRef]
- Ou, Y.C.; Alrasyid, H.; Haber, Z.B.; Lee, H.J. Cyclic behavior of precast high-strength reinforced concrete columns. ACI. Struct. J. 2015, 112, 839–850. [Google Scholar] [CrossRef]
- Kim, Y.M. A Study of Pipe Splice Sleeves for Use in Precast Beam-Column Connections; University of Texas at Austin: Austin, TX, USA, 2000. [Google Scholar]
- Riva, P. Seismic behaviour of precast column-to-foundation grouted sleeve connections. In Advances in Engineering Structures, Mechanics & Construction; Springer: Dordrecht, The Netherlands, 2006; pp. 121–128. [Google Scholar] [CrossRef]
- Zhao, Y.; Li, R.; Wang, X.F.; Han, C. Experimental research on seismic behaviors of precast concrete columns with large-diameter and high-yield strength reinforcements splicing by grout-filled coupling sleeves. China Civil. Eng. J. 2017, 50, 31–39+75. (In Chinese) [Google Scholar] [CrossRef]
- Kuttab, A.; Dougill, J.W. Grouted and dowelled jointed precast concrete columns: Behaviour in combined bending and compression. Mag. Concr. Res. 1988, 40, 131–142. [Google Scholar] [CrossRef]
- GB 50011-2010; Code for Seismic Design of Buildings. China Architecture & Building Press: Beijing, China, 2010.
- Tullini, N.; Minghini, F. Grouted sleeve connections used in precast reinforced concrete construction-experimental investigation of a column-to-column joint. Eng. Struct. 2016, 127, 784–803. [Google Scholar] [CrossRef]
- Tullini, N.; Minghini, F. Cyclic test on a precast reinforced concrete column-to-foundation grouted duct connection. Bull. Earthq. Eng. 2020, 18, 1657–1691. [Google Scholar] [CrossRef]
- Ameli, M.J.; Brown, D.N.; Parks, J.E.; Pantelides, C.P. Seismic column-to-footing connections using grouted splice sleeves. ACI. Struct. J. 2016, 113, 1021–1030. [Google Scholar] [CrossRef]
- Al-Jelawy, H.M.; Mackie, K.R.; Haber, Z.B. Shifted plastic hinging for grouted sleeve column connections. ACI. Struct. J. 2018, 115, 1101–1114. [Google Scholar] [CrossRef]
- Liu, H.; Wang, Z.; Xu, C.; Du, X. Influence of axial compressive ratio on the seismic performance of precast columns with grouted sleeve connections. J. Struct. Eng. 2021, 147, 04021194. [Google Scholar] [CrossRef]
- Guan, D.; Xu, R.; Yang, S.; Chen, Z.; Guo, Z. Development and seismic behavior of a novel UHPC-shell strengthened prefabricated concrete column. J. Build. Eng. 2022, 46, 103672. [Google Scholar] [CrossRef]
- Cao, X.Y.; Shen, D.; Feng, D.C.; Wang, C.L.; Qu, Z.; Wu, G. Seismic retrofitting of existing frame buildings through externally attached sub-structures: State of the art review and future perspectives. J. Build Eng. 2022, 57, 104904. [Google Scholar] [CrossRef]
- Cao, X.Y.; Feng, D.C.; Wang, Z.; Wu, G. Parametric investigation of the assembled bolt-connected buckling-restrained brace and performance evaluation of its application into structural retrofit. J. Build Eng. 2022, 48, 103988. [Google Scholar] [CrossRef]
- Cao, X.Y.; Feng, D.C.; Wu, G.; Wang, Z. Experimental and theoretical investigations of the existing reinforced concrete frames retrofitted with the novel external SC-PBSPC BRBF sub-structures. Eng. Struct. 2022, 256, 113982. [Google Scholar] [CrossRef]
- Alavi-Dehkordi, S.; Mostofinejad, D.; Alaee, P. Effects of high-strength reinforcing bars and concrete on seismic behavior of RC Beam-column joints. Eng. Struct. 2019, 183, 702–719. [Google Scholar] [CrossRef]
- Sun, Z.; Feng, D.C.; Sun, Y.; Yuan, J. Bond-slip behavior of bundled steel/FRP bars and its implementation in high-fidelity FE modeling of reinforced concrete beams. Constr. Build. Mater. 2021, 286, 122887. [Google Scholar] [CrossRef]
- Sun, Z.; Fu, L.; Feng, D.C. Experimental study on the flexural behavior of concrete beams reinforced with bundled hybrid steel/FRP bars. Eng. Struct. 2019, 197, 109443. [Google Scholar] [CrossRef]
- Pang, J.B.; Eberhard, M.O.; Stanton, J.F. Large-bar connection for precast bridge bents in seismic regions. J. Bridge. Eng. 2010, 15, 231–239. [Google Scholar] [CrossRef]
- GB/T 51231-2016; Technical Standard for Assembled Buildings with Concrete Structure. China Architecture & Building Press: Beijing, China, 2016.
- JG/T 408-2013; Cementitious Grout for Coupler of Rebar Splicing. China Standards Press: Beijing, China, 2013.
- JGJ 355-2015; Technical Specification for Grout Sleeve Splicing of Rebars. China Architecture & Building Press: Beijing, China, 2015.
- JGJ/T 101-2015; Specification for Seismic Test of Buildings. China Construction Industry Press: Beijing, China, 2015.
- Park, R. Evaluation of ductility of structures and structural assemblages from laboratory testing. Bull. N. Z. Soc. Earthq. 1989, 22, 155–166. [Google Scholar] [CrossRef]
Specimen ID | Axial Compressive Ratio n | Reinforcement | Reinforcement Ratio ρ (%) | Transverse Rebar | Transverse Rebar Ratio ρv (%) | Production Method |
---|---|---|---|---|---|---|
RC-22-3 | 0.3 | 8D22 | 2 | D10@100/200 | 0.98/0.49 | Cast-in-place |
RC-22-6 | 0.6 | 8D22 | 2 | D10@100/200 | 0.98/0.49 | Cast-in-place |
PC-18-3 | 0.3 | 12D18 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
PC-22-3 | 0.3 | 8D22 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
PC-32-3 | 0.3 | 4D32 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
PC-18-6 | 0.6 | 12D18 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
PC-22-6 | 0.6 | 8D22 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
PC-32-6 | 0.6 | 4D32 | 2 | D10@100/200 | 0.98/0.49 | Prefabricated |
Diameter of Reinforcement | Yield Strength fy (MPa) | Ultimate Strength fst (MPa) | Young’s Modulus Es (GPa) | Elongation δ (%) |
---|---|---|---|---|
D10 | 401.3 | 600.8 | 200 | 23 |
D18 | 404.5 (417) | 605.5 (609) | 200 | 22 |
D22 | 411.3 (429) | 600.3 (602) | 200 | 22 |
D32 | 400.7 (423) | 603.9 (601) | 200 | 20 |
Sleeve Model | Applicable Reinforcement Diameter (mm) | Outer Diameter (mm) | Internal Diameter (mm) | Length (mm) |
---|---|---|---|---|
GTB4-18-A | 18 | 42 | 34 | 160 |
GTB4-22-A | 22 | 48 | 38 | 195 |
GTB4-32-A | 32 | 60 | 48 | 360 |
Specimen Number | Crack Point | Yield Point | Peak Point | Ultimate Point | µΔ | θm | E (kN·m) | ||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pcr (kN) | Δcr (mm) | Py (kN) | Δy (mm) | Pp (kN) | Δp (mm) | Pu (kN) | Δu (mm) | ||||
RC-22-3 | 116 | 3 | 207 | 13 | 244 | 26 | 208 | 32 | 2.5 | 1/47 | 10.6 |
RC-22-6 | 130 | 3 | 226 | 11 | 264 | 18 | 220 | 25 | 2.3 | 1/60 | 9.4 |
PC-18-3 | 120 | 3 | 200 | 16 | 232 | 34 | 196 | 40 | 2.5 | 1/37 | 11.2 |
PC-22-3 | 122 | 3 | 220 | 15 | 282 | 25 | 245 | 32 | 2.3 | 1/47 | 8.3 |
PC-32-3 | 125 | 3 | 218 | 15 | 244 | 24 | 211 | 30 | 1.9 | 1/50 | 8.0 |
PC-18-6 | 145 | 3 | 215 | 11 | 254 | 19 | 214 | 24 | 2.2 | 1/63 | 8.3 |
PC-22-6 | 155 | 3 | 265 | 11 | 319 | 17 | 267 | 21 | 1.9 | 1/71 | 8.0 |
PC-32-6 | 157 | 3 | 234 | 11 | 273 | 18 | 230 | 20 | 1.8 | 1/75 | 7.5 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Wang, Q.; Qin, W.; Lu, C. Effects of Large-Diameter Rebar Replacement on Seismic Behavior of Precast Concrete Columns with Grouted Sleeve Connections. Buildings 2023, 13, 706. https://doi.org/10.3390/buildings13030706
Wang Q, Qin W, Lu C. Effects of Large-Diameter Rebar Replacement on Seismic Behavior of Precast Concrete Columns with Grouted Sleeve Connections. Buildings. 2023; 13(3):706. https://doi.org/10.3390/buildings13030706
Chicago/Turabian StyleWang, Qiang, Weiyang Qin, and Chunling Lu. 2023. "Effects of Large-Diameter Rebar Replacement on Seismic Behavior of Precast Concrete Columns with Grouted Sleeve Connections" Buildings 13, no. 3: 706. https://doi.org/10.3390/buildings13030706
APA StyleWang, Q., Qin, W., & Lu, C. (2023). Effects of Large-Diameter Rebar Replacement on Seismic Behavior of Precast Concrete Columns with Grouted Sleeve Connections. Buildings, 13(3), 706. https://doi.org/10.3390/buildings13030706