13.07.2015 Views

Executive Summary - West Bengal Pollution Control Board

Executive Summary - West Bengal Pollution Control Board

Executive Summary - West Bengal Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Prithvi Ferro Alloys Private LimitedEnvironmental Impact Assessment<strong>Executive</strong> <strong>Summary</strong><strong>Executive</strong> <strong>Summary</strong>Environmental Consulting SpecialistsProposed Ferro Alloys Plant, Iron & Steel & Captive Power Plantat Mouza : Birsinghapur, P. S. : Barjora, Dist. : Bankura, <strong>West</strong> <strong>Bengal</strong>.Page1


Prithvi Ferro Alloys Private LimitedEnvironmental Impact Assessment<strong>Executive</strong> <strong>Summary</strong>Project <strong>Summary</strong>Proposed ProjectProject ProponentProject SiteProductsRaw MaterialsLandPowerWaterProject Cost<strong>Pollution</strong> <strong>Control</strong> CostFerro Alloys Plant, Iron & Steel Plant & Captive Power PlantFerro Alloys PlantInduction FurnaceContinuous Casting MachineAOD ConverterVD / VOD PlantOxygen PlantCaptive Power Plant4 X 9 MVA2 X 12 T1 X 2 Strands1 X 25 T1 X 25 T1 X 600 Nm 3 / hr1 X 60 MWPrithvi Ferro Alloys Private LimitedCF – 366, Sector I, Salt Lake City, Kolkata – 700 064, <strong>West</strong> <strong>Bengal</strong>Mouza: Birsinghapur, P.S.: Barjora, District: Bankura, <strong>West</strong> <strong>Bengal</strong>[ There is no National Park / Wildlife Sanctuary / Reserve Forestwithin 10 km radius of the project site ]Ferro Manganese (Fe Mn)Silico Manganese (Si Mn)Angles, Channels, Beams, TMT Bars, M. S.Billets & Wire Rods, Steel Billets & Blooms73,920 TPA52,800 TPA88,980 TPAPower60 MWQuartz, Coke Breeze, Dolomite &Ferro Alloys PlantManganese Ore.Sponge Iron, Cast Iron / Pig Iron / Scrap,Steel Melting ShopFerro Manganese & Ferro Silicon.Steel Scrap & Sponge Iron, Ferro Alloys &Stainless Steel PlantLimestone and Dolomite.Captive Power Plant Coal & Light Diesel Oil.Total Land Area : 50 acres & Proposed Greenbelt : 15 acres apartfrom the peripheryRequirement : 54 MWSource : <strong>West</strong> <strong>Bengal</strong> State Electricity Distribution CompanyLimited (WBSEDCL) & Captive Power PlantRequirement : 1700 KLD ; Source : Borewell[ Application for obtaining permit has already been submitted & isunder process ]Rs. 410.0 CroresCapital Cost : Rs. 4 Crores ; Recurring Cost : Rs. 60 Lakhs / annumEnvironmental Consulting SpecialistsProposed Ferro Alloys Plant, Iron & Steel & Captive Power Plantat Mouza : Birsinghapur, P. S. : Barjora, Dist. : Bankura, <strong>West</strong> <strong>Bengal</strong>.Page2


Prithvi Ferro Alloys Private LimitedEnvironmental Impact Assessment<strong>Executive</strong> <strong>Summary</strong>Baseline Environmental Study (10 km radius in Winter Season)Air : The ambient air quality at 8 locations has been monitored. The concentration of SPM, RPM,SO 2 , NO 2 ranged between 129-262 µg/m 3 , 47-121 µg/m 3 ,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!