5 Bidders are required to upload the complete bid comprising <strong>of</strong> Part-I:- Unpriced Bid along<br />
with all supporting documents & Part-II:- Priced Bid on the e-tendering website<br />
(www.tenderwizard.com/eil) only.- Refer General Instructions provided in Special<br />
Instructions to Bidders (SIB).<br />
6 Bidder to ensure that they are able to download the bid documents / price schedule on e-<br />
tendering website atleast two days before Bid Due Date (BDD).<br />
7 Technical specification should be strictly as per the Material Requisition attached. It may<br />
be noted that the Bid shall be evaluated as received.<br />
8 Commercial requirements are specified in the General Purchase Conditions, Special<br />
Instructions to Bidders, Agreed Terms and Conditions (ATC) and all other RFQ<br />
documents. The pre-filled Agreed Terms and Conditions Questionnaire should be<br />
returned duly filled in, signed & stamped along with copy <strong>of</strong> your un-priced bid.<br />
9 If not bidding, please inform vide e-mail with attached regret letter within the due date &<br />
time, with reason(s) <strong>of</strong> not participating in the RFQ. In case there is no response,<br />
names <strong>of</strong> such bidder may not be considered for issuance <strong>of</strong> future enquiries.<br />
10 Direct bids only, without the intermediary <strong>of</strong> an Indian Agent will be considered from<br />
Foreign Bidder.<br />
11 Delivery / Completion Period:-<br />
11.1 Within 02 (Two) Weeks from the date <strong>of</strong> issue <strong>of</strong> Fax <strong>of</strong> Acceptance (FOA) on FOT-Site<br />
(BPCL-KR) Basis. The date <strong>of</strong> receipt <strong>of</strong> material at site shall be considered as the date<br />
<strong>of</strong> delivery. Material shall be transported through GATI/XPS Cargo.<br />
12 Payment Terms :-<br />
Payment Terms for Indian suppliers shall be as per Clause No. 1.1 & Clause No.1.7 <strong>of</strong><br />
Special Instructions to Bidders.<br />
13 The <strong>of</strong>fer should be valid for 3 (Three) months from final bid due date.<br />
14 Only e-Bids to be uploaded in <strong>EIL</strong>’s authorized service provider’s <strong>portal</strong><br />
www.tenderwizard.com/eil shall be acceptable. Physical bids and Bids/ Offer through<br />
email or fax/ Telex/Telegraphic or Bids received in open condition or Bids in any other<br />
mode shall not be accepted.<br />
15 The bidder shall bear all costs associated with the preparation and submission <strong>of</strong> its bid,<br />
and the Purchaser/Consultant shall in no case be responsible or liable for these costs<br />
regardless <strong>of</strong> the conduct or outcome <strong>of</strong> the bidding process.<br />
16 Canvassing in any form by the Bidder or by any other agency on their behalf may lead to<br />
disqualification <strong>of</strong> their bid.<br />
17 e-bids received online shall be opened at <strong>EIL</strong> <strong>of</strong>fice on due date & time as specified<br />
above. Bidder can view online the name <strong>of</strong> the other bidders who have submitted their e-<br />
bids after opening is completed by <strong>EIL</strong>.<br />
Page 2 <strong>of</strong> 5<br />
Page 3 <strong>of</strong> 143
27 Bidders are requested to quote as per their capability as registered in <strong>EIL</strong> as on the<br />
date <strong>of</strong> issue <strong>of</strong> RFQ.<br />
28 Special Instructions to Bidders for Category-I MR<br />
i) Bidder to note that no correspondence shall be entered into or entertained after the<br />
bid submission.<br />
ii) Bidder shall furnish quotations only for those items, for which he is approved by <strong>EIL</strong><br />
and which he can supply strictly as per MR specifications.<br />
iii) No technical details <strong>of</strong> any nature shall be included in the <strong>of</strong>fer. If the <strong>of</strong>fer contains<br />
any technical deviations or clarifications or stipulates any technical specifications<br />
(even if in line with the MR requirements), the <strong>of</strong>fer is liable for rejection.<br />
iv) The submission <strong>of</strong> prices by the bidder shall be construed to mean that he has<br />
confirmed compliance with all technical specifications <strong>of</strong> the corresponding item(s).<br />
29 The Net Worth <strong>of</strong> the bidder should be positive as per the immediate preceding year's<br />
audited financial results. However, Central Public Sector Enterprises (CPSEs) are<br />
exempted from this requirement. If the bidder is not meeting the above criteria their bid<br />
shall not be evaluated further. Bidders are therefore requested to furnish the Audited<br />
Financial Statement for the immediate preceding year including Pr<strong>of</strong>it & Loss Account.<br />
30 Owner reserves its right to allow Public Sector Enterprises (Central/State), Micro &<br />
Small Enterprises (MSEs) and MSEs owned by Scheduled Caste (SC)/ Scheduled<br />
Tribe (ST) entrepreneurs, purchase preference as admissible/applicable from time to<br />
time under the existing Govt. policy. Bidder to submit documentary evidence for the<br />
same duly certified by Statutory Auditor <strong>of</strong> the bidder or a practicing Charted Account<br />
(not being an employee or a Director or not having any interest in the Bidder’s company<br />
/ firm) where audited accounts are not mandatory as per law.)<br />
31 Integrity Pact :- Not applicable.<br />
32 RFQ Document Fee/EMD/Bid Security : Not applicable.<br />
33 Contact Persons for this RFQ are:<br />
a) Mr P.Murugesan, Sr. Manager (C&P) Phone No. 0091-44-28576018 & e-mail :<br />
[email protected]<br />
b) Mr S.Padmanathan, Sr. Manager (C&P) Phone No. 0091-44-28576017 & e-mail :<br />
[email protected]<br />
c) Mr A.E.V. Prasad, Dy. Manager (C&P) Phone No. 0091-44-28576015 & e-mail :<br />
[email protected]<br />
* Please specify RFQ Ref. No. in all Correspondence.<br />
THIS IS NOT AN ORDER<br />
Very truly yours<br />
For & on behalf <strong>of</strong> Bharat Petroleum Corporation Limited<br />
Enclosures: As per List Attached.<br />
(P.MURUGESAN)<br />
Senior Manager (Contracts & Purchase)<br />
Engineers India Limited<br />
Page 4 <strong>of</strong> 5<br />
Page 5 <strong>of</strong> 143
DOCUMENT<br />
A) Request For Quotation (RFQ)<br />
LIST OF ENCLOSURES<br />
B) Pr<strong>of</strong>orma <strong>of</strong> Letter <strong>of</strong> Authority for Attending Un-priced / Priced Bid Opening<br />
C) Special Notes<br />
D) Commercial Section:<br />
i) Instructions to Bidders for e-tendering<br />
ii)<br />
iii)<br />
iv)<br />
Browser settings for e-tendering<br />
Vendor Help Manual (e-tendering)<br />
Agreed Terms & Conditions (ATC) (For Indian Bidders)<br />
v) Special Instructions to Bidder (SIB)<br />
vi)<br />
vii)<br />
General Purchase Conditions (Indigenous)<br />
Price Schedule<br />
E) Technical Section:<br />
i) Material Requisition (MR) No.: A166-000-WC-MR-3230 Rev. C along with its<br />
attachments<br />
Page 5 <strong>of</strong> 5<br />
Page 6 <strong>of</strong> 143
Pr<strong>of</strong>orma <strong>of</strong> Letter <strong>of</strong> Authority for Attending Unpriced / Priced Bid Opening<br />
No.<br />
Date:<br />
The Senior Manager (C&P)<br />
Engineers India Ltd.,<br />
5 th Floor, West Wing, CMDA Tower-1<br />
Thalamuthu Natarajan Building<br />
No.1, Gandhi Irwin Road<br />
Egmore, Chennai-600 008<br />
Phone: 044-28576000 / 28576090; Extn: 6018<br />
Attn:<br />
Mr. P. Murugesan, Sr. Manager (C&P)<br />
Dear Sir,<br />
We …………………………………………………… hereby authorise following representative(s)<br />
to attend the Unpriced / Priced Bid Opening against your RFQ<br />
No……………………………………………. for ………………………………………………………………<br />
(Item Name)<br />
1. Name & Designation ……………………………………. Signature<br />
2. Name & Designation ……………………………………. Signature<br />
We confirm that we shall be bound by all and whatsoever our representative(s) shall commit.<br />
Yours Faithfully,<br />
Signature_____________________<br />
Name & Designation____________<br />
For & on behalf <strong>of</strong>______________<br />
Note:<br />
This letter <strong>of</strong> Authority should be on the letterhead <strong>of</strong> the bidder and should be signed by a person<br />
competent and having the Power <strong>of</strong> Attorney to bind the bidder.<br />
Page 7 <strong>of</strong> 143
SPECIAL NOTES<br />
(TO BE FURNISHED DULY SIGNED AND STAMPED ALONGWITH OFFER)<br />
RFQ No. : PM/A166-000-WC-MR-3230/5014<br />
ITEM : FLANGES-CRASH MR<br />
1. Please confirm whether you are a Micro & Small Enterprises<br />
(MSEs) or not.<br />
Yes / No (Please tick<br />
whichever is applicable)<br />
2. The clause no 13 (b) (Part Order) <strong>of</strong> Agreed Terms & Conditions (Indian Bidder) stands<br />
replaced with the following :-<br />
“The quantities against a particular item may be splitted to allow purchase preference to Micro<br />
& Small Enterprises (MSEs) as admissible / applicable from time to time under the existing<br />
Govt policy in India. Any charges quoted extra as lumpsum shall be applicable prorata on value<br />
basis in the event <strong>of</strong> part order / split order.”<br />
(Signature & Stamp <strong>of</strong> Bidder)<br />
Page 8 <strong>of</strong> 143
Annexure - I<br />
INSTRUCTIONS TO BIDDERS FOR E-TENDERING<br />
Bidders who wish to participate for RFQs/ <strong>Tender</strong>s which are uploaded on <strong>EIL</strong>’s<br />
Authorised service provider’s website (i.e. www.tenderwizard.com/eil) should follow<br />
the following instructions which shall permit them to Search, View, Download and<br />
Submit their Electronic Bids online in a secure manner ensuring confidentiality. These<br />
Instructions for E-<strong>Tender</strong>ing shall be read in conjunction with various instructions,<br />
wherever appearing with the RFQ/ Bidding Document. The conditions & instructions<br />
mentioned here in under shall supersede and shall prevail over the conditions &<br />
instructions enumerated elsewhere in the RFQ/ Bidding Document.<br />
1) PARTICIPATION IN E-TENDERING, REQUEST FOR USER ID and<br />
PASSWORD:<br />
To participate in E-<strong>Tender</strong>ing, it is Mandatory on the part <strong>of</strong> Bidders to have user id<br />
and password. Bidders are required to be registered on E-<strong>Tender</strong>ing website to<br />
obtain user id & password (password will be system generated).<br />
User id and password are unique to each bidder and the bidder shall use the same<br />
to view/download/participate in all e-tenders <strong>of</strong> <strong>EIL</strong>. Bidders are required to change<br />
the password during their first login into the system. There will be single user id<br />
permission for each bidder in the system.<br />
Obtaining user id is an on-going process and is not linked to any particular RFQ/<br />
Bidding Document. Any bidder willing to participate in <strong>EIL</strong> E-<strong>Tender</strong>s can obtain<br />
User id & password as described above. Each bidder will get one user id. Bidders<br />
are requested to designate one <strong>of</strong>ficer from their organization who will submit the<br />
bids on line.<br />
Digital Signature will be required from very first stage starting from login into the<br />
system, downloading <strong>of</strong> RFQ/ Bidding Document, Bid submission, Bid opening, etc.<br />
2) VIEW AND DOWNLOAD E-TENDER<br />
Bidders must go to E-<strong>Tender</strong>ing website www.tenderwizard.com/eil and log-in<br />
using their user-id, password and digital signature.<br />
However, the open tenders can be viewed/ downloaded from the link “tender free<br />
view” provided in the website, without being log-in into the system.<br />
3) DIGITAL SIGNATURE<br />
Bidders cannot submit e-bids without having valid Digital Signature. The Digital<br />
Signature shall be issued by C.A. (Certifying Authority) in India, in the name <strong>of</strong> a<br />
person authorized for E- <strong>Tender</strong>ing on behalf <strong>of</strong> his Company.<br />
Page 1 <strong>of</strong> 5<br />
Page 9 <strong>of</strong> 143
Annexure - I<br />
signatures and proper usage <strong>of</strong> the same by responsible persons.<br />
No Late Bids after due date & time shall be permitted in E-<strong>Tender</strong>ing website.<br />
The system time (IST) being displayed on the E-<strong>Tender</strong>ing website shall be final and<br />
binding on bidder and bids have to be submitted by bidders considering this time only<br />
and not the time as per their location / country. Bidder who intends to change the bid<br />
already submitted may change/revise the same on or before the closing date &<br />
time <strong>of</strong> bid submission.<br />
No Manual Bids shall be permitted. The <strong>of</strong>fers submitted through E-tendering<br />
website shall only be considered for evaluation.<br />
Note:<br />
i) Bidders are advised in their own interest to ensure that bids are uploaded in E-<br />
tendering website well before the closing date and time <strong>of</strong> bid submission.<br />
ii) No bid can be modified after the dead line for submission <strong>of</strong> bids.<br />
iii) <strong>EIL</strong> shall not be responsible for any failure on the part <strong>of</strong> the bidder to follow the<br />
instructions.<br />
iv) Inadvertently, if a document is uploaded in E- tendering website by the<br />
bidders, such document can be deleted by the Bidder and a new/modified<br />
document can be uploaded digitally signed within the bid due date & time.<br />
v) Bidders are requested to upload small sized documents preferably (upto 5 MB)<br />
at a time to facilitate easy uploading into E- <strong>Tender</strong>ing website. <strong>EIL</strong> does<br />
not take any responsibility in case <strong>of</strong> failure <strong>of</strong> the bidder to upload the<br />
documents within specified time <strong>of</strong> Bid submission.<br />
vi) Wherever, the bidders are asked to upload the required document in Mandatory<br />
folders, the bidders must upload the required document only in the Mandatory<br />
folders.<br />
6) OPENING OF BIDS:<br />
The unpriced bids shall be opened online, at the specified date and time given in the<br />
RFQ document or extended otherwise. The price bids shall also be opened online<br />
on the date & time which will be informed to all the techno-commercially qualified/<br />
acceptable bidders in advance.<br />
The bidders who have submitted their bid will be able to view online the name &<br />
status <strong>of</strong> all the bidders at their respective windows, after unpriced bid opening by<br />
buyer. Similarly, the techno-commercially acceptable bidders will be able to view<br />
online the price sheets <strong>of</strong> other techno-commercially acceptable bidders at their<br />
respective windows, after priced bid opening by buyer.<br />
Page 3 <strong>of</strong> 5<br />
Page 11 <strong>of</strong> 143
Annexure-II<br />
Contact details <strong>of</strong> Authorized Service Provider (ASP)<br />
ASP Name : M/s Antares Systems Limited, Bangalore<br />
Address<br />
: # 24, 1st Floor, Sudha Complex<br />
Near Havanoor Circle, 3rd Stage<br />
4th Block, Basaveshwara Nagar<br />
Bangalore - 560 079<br />
Ph: 080-40482000<br />
Fax No: +91-80-40482114<br />
C-9, 1st Floor (Back Side)<br />
New Krishna Park, Najafgarh Road, Vikaspuri<br />
Near Janakpuri West Metro Station<br />
New Delhi-110018<br />
Ph No: 011-49424365<br />
Fax No: +91-11-25618721<br />
Website<br />
: www.antaressystems.com , www.tenderwizard.com<br />
Contact Persons at Bangalore <strong>of</strong>fice:<br />
Help Desk No.<br />
1: Mr. Ashish Yadav<br />
Contact no: 08800991865<br />
Email: [email protected]<br />
2: Mr. Sachin<br />
Contact no: 8401982112<br />
Email: [email protected]<br />
1: New Delhi 011-49424365<br />
2: Bangalore 080-40482000<br />
Page 13 <strong>of</strong> 143<br />
Page 5 <strong>of</strong> 5
Browser Settings for accessing<br />
<strong>Tender</strong> Wizard<br />
Page 14 <strong>of</strong> 143
First <strong>of</strong> all you need to open internet explorer<br />
Type the website address http://www.tenderwizard.com/<strong>EIL</strong> in the address bar and click<br />
“Go” to access the Login Screen.<br />
Page 15 <strong>of</strong> 143
Now open IE and go to the tools ->internet options-><br />
Follow as given settings<br />
Page 16 <strong>of</strong> 143
Page 17 <strong>of</strong> 143
Make all settings as per follows<br />
Page 18 <strong>of</strong> 143
Page 19 <strong>of</strong> 143
Page 20 <strong>of</strong> 143
Page 21 <strong>of</strong> 143
Page 22 <strong>of</strong> 143
Page 23 <strong>of</strong> 143
Page 24 <strong>of</strong> 143
Page 25 <strong>of</strong> 143
Page 26 <strong>of</strong> 143
Page 27 <strong>of</strong> 143
Page 28 <strong>of</strong> 143
Page 29 <strong>of</strong> 143
Page 30 <strong>of</strong> 143
Follow same in the next<br />
Page 31 <strong>of</strong> 143
Page 32 <strong>of</strong> 143
Page 33 <strong>of</strong> 143
Page 34 <strong>of</strong> 143
Page 35 <strong>of</strong> 143
Page 36 <strong>of</strong> 143
Page 37 <strong>of</strong> 143
Page 38 <strong>of</strong> 143
After making all setting you need to login and you will get the page as follows<br />
And install java by clicking the link but before uninstalling the older java version.<br />
Page 39 <strong>of</strong> 143
E-<strong>Tender</strong>ing Help Manual<br />
for Bidders<br />
ENGINEERS INDIA LIMITED<br />
Page 40 <strong>of</strong> 143
Overview<br />
<strong>Tender</strong> Wizard is an exclusive, most vibrant end to end solution for buying / selling <strong>of</strong> products and<br />
services through tendering process. It supports A - Z activities <strong>of</strong> tendering based on proactive work<br />
flow concept. Fine details <strong>of</strong> tendering like vendor registration, Bid Document announcement and<br />
corrigendum, Bid Document form processing, opening, negotiation and Bid Document awarding are<br />
supported in a real time interactive environment. <strong>Tender</strong> Wizard creates a true dynamic market place<br />
for both buyers and vendors to interact with each other and transact business.<br />
Purpose<br />
The objective <strong>of</strong> developing the TENDERWIZARD is to automate the departments <strong>of</strong> Governments.<br />
The key objectives <strong>of</strong> this exchange are Reduced Inventory, consistency in costs across all<br />
departments, consistent and sustainable Vendor Development, transactional effectiveness,<br />
procurement lead time reduction, transparency etc.,<br />
Audience<br />
This product is extensively used by the Government <strong>of</strong>ficials and contractors to enhance the<br />
transparency in the day to day tendering activities <strong>of</strong> the Government <strong>of</strong>fices as well as in contractor<br />
community.<br />
Disclaimer<br />
ANTARES assumes no responsibility for any errors that may appear in this document. The<br />
information contained herein is subject to change without notice and should not be construed as a<br />
commitment by Antares. No responsibility is assumed for the reliability <strong>of</strong> s<strong>of</strong>tware or equipment that<br />
is not supplied by Antares.<br />
Copyright<br />
This document is confidential and proprietary information <strong>of</strong> Antares. It should not be disclosed in<br />
whole or in part to any third party except to the document to whom it has been submitted without the<br />
express written authorization <strong>of</strong> Antares and should not be duplicated in whole or part for any other<br />
purpose other than evaluation <strong>of</strong> the Technical capability <strong>of</strong> Antares and shall be returned upon<br />
request.<br />
Any reference used in this response is proprietary and is covered under non-disclosure agreement.<br />
The information should not be divulged to any other party other than for whom it is intended. Clients<br />
and partners may not be contacted about these references or divulge the information contained therein<br />
unless duly authorized by Antares.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 41 <strong>of</strong> 143
Login screen<br />
Type the website address http://www.tenderwizard.com/<strong>EIL</strong> in the address bar and click “Go” to<br />
access the Login Screen.<br />
Login procedure<br />
Enter the given “USER ID” in the box provided. Enter the given “PASSWORD” in the box provided.<br />
Click “ENTER” to login to the tendering website. The screen directs you to the PKI based login screen<br />
(as shown below):<br />
As a Security purpose the system automatically asks the user to change the password as shown in<br />
Figure during the first login. Enter the Old and New Password along wit the Hint Question and Answer<br />
and the click “Submit” to update the new Password. The user needs to login once again with the new<br />
password (note the User Id remains the same) which gives the user the authentication to the change<br />
<strong>of</strong> password.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 42 <strong>of</strong> 143
Modify password: This screen will show only at first time login<br />
Login again with the new modified password:<br />
Once again the system will ask you to enter the password as shown below. Enter your password and<br />
click “Enter” to proceed:<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 43 <strong>of</strong> 143
Request for Bid Document<br />
Once the user logs in to the system, by default “In Progress” screen will be displayed where all the<br />
applied Bid Documents are viewed.<br />
Click “Un Applied” to view the new / unapplied Bid Documents. If the Bid Document is due for<br />
request, then a Blue colour icon will appear on the screen as displayed below:<br />
Once the user requested for the Bid Document, he can access this Bid Document through “In<br />
Progress” section and the status <strong>of</strong> the Bid Document will be displayed as “Received”. The Bid<br />
document has to be paid during submission <strong>of</strong> Bid document.<br />
Uploading <strong>of</strong> supporting documents<br />
Click “Document Library” (highlighted space in the below figure on the left side) to upload all the<br />
necessary supporting documents for the Bid Document. This activity will reduce the user’s work, while<br />
submitting the Bid Document. Click “Upload document” whenever user need to upload the new<br />
attachments. These documents can be attached for any number <strong>of</strong> Bid Documents applied by the user.<br />
Note:<br />
1: Do not upload the SOR or Price Schedule which is in the form <strong>of</strong> the excel sheet in<br />
which you are required to fill the price, this will upload directly from your system.<br />
2: If there is EMD required and it is in the form <strong>of</strong> BG then scan the EMD in the two<br />
ways<br />
a: First page in the JPEG or JPG format, this page is not required to upload in the<br />
document library it will upload directly from your system.<br />
b: Scan all pages in the PDF format, this should be uploaded in the doc library.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 44 <strong>of</strong> 143
The window will be as below figure:<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 45 <strong>of</strong> 143
Browse the file from system, give the attach name & attach description. If you know the file group <strong>of</strong><br />
the file then select the group otherwise select the general document. Now click on the upload.<br />
Note: The file name should not contain any special character and not even but you can give<br />
one space in the attach name and description.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 46 <strong>of</strong> 143
After clicking the update you can check the document by directly clicking on the document library.<br />
Now again come back on in progress and click on the edit attachment level 1<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 47 <strong>of</strong> 143
You will get the page as below<br />
Now you are required to attach the document one by one in the given link as below<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 48 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 49 <strong>of</strong> 143
Now you are about to ready to submit the tender form<br />
But before submission you are required to upload rest <strong>of</strong> other supporting document besides the<br />
document which was showing in the red color otherwise you will get the below message.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 50 <strong>of</strong> 143
Now attach at least one general document as below figure<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 51 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 52 <strong>of</strong> 143
Now you can submit the tender by clicking on the given link.<br />
See the below figure:<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 53 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 54 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 55 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 56 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 57 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 58 <strong>of</strong> 143
Confirmations on Bid Document submission<br />
Once the EMD, Bid document fee, Price Bid, General documents, Mandatory documents etc. are<br />
uploaded, click “Submit the Bid Document form” on the Bid Document screen. The user should<br />
compulsorily attach at least one document from general document section.<br />
Once the user submits the form, the following confirmations shall appear as an authentication to the<br />
submission <strong>of</strong> the Bid Document. Preserve the printout <strong>of</strong> confirmation as shown in Figures.<br />
Note that the status <strong>of</strong> the Bid Document will be changed as “Submitted”, once user click on the final<br />
submission button.<br />
Now click on the green icon <strong>of</strong> the bid:<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 59 <strong>of</strong> 143
Click on the view the acknowledgement copy<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 60 <strong>of</strong> 143
Copyright 2007<br />
Strictly private and confidential<br />
Page 61 <strong>of</strong> 143
Withdrawal <strong>of</strong> Bid Document<br />
In case, the vendor needs to withdraw his submitted bid, then click “Withdrawal” as shown below and<br />
provide reason for withdrawal and proceed. The Bid Document will be moved to Disqualified /<br />
Withdrawal section. Once withdrawn, Bid Documents cannot be taken back.<br />
Opening event<br />
Vendors can view the opening event sitting at their own places using internet connection. The Bid<br />
Document will be moved to Opened / Awarded section once it is opened by the tendering authority<br />
(as shown in figure). If the vendor is not disqualified then the status will be shown as “In the Race” (as<br />
shown in figure).<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 62 <strong>of</strong> 143
Even competitor’s bids sheets can be downloaded from the website as shown in figure.<br />
Copyright 2007<br />
Strictly private and confidential<br />
Page 63 <strong>of</strong> 143
A166_ATC (I) Page 1 <strong>of</strong> 8<br />
BHARAT PETROLEUM CORPORATION LTD<br />
IREP-Kochi Refinery<br />
(Job No. A166)<br />
AGREED TERMS & CONDITIONS (ATC)<br />
(FOR INDIAN BIDDERS)<br />
Supplier Name: M/s ______________________________________________________________<br />
RFQ No.:<br />
__________________________________________________________________<br />
Supplier’s Offer Ref No. & Date: ______________________________________________________<br />
Tel. No. ___________________Mob. No. ______________________ Fax No. ________________<br />
Contact Person: ___________________________ e-mail _________________________________<br />
1. ALL CORRESPONDENCE MUST BE IN ENGLISH LANGUAGE ONLY.<br />
2. DULY SIGNED & STAMPED COPIES OF THIS “QUESTIONNAIRE”, WITH ALL THE CLAUSES<br />
DULY CONFIRMED/ PRECISELY REPLIED TO BY THE SUPPLIER, SHALL BE ENCLOSED.<br />
3. ALL COMMERCIAL TERMS ARE GIVEN/CONFIRMED IN THE QUESTIONNAIRE ITSELF AND<br />
NOT ELSEWHERE IN THE QUOTATION. IN CASE OF CONTRADICTION, THE SAME GIVEN<br />
HEREIN SHALL PREVAIL.<br />
4. FAILURE ON PART OF THE SUPPLIER IN SUBMITTING THIS DULY FILLED-IN<br />
“QUESTIONNAIRE” WITH UN-PRICED BID AND / OR SUBMITTING INCOMPLETE REPLIES<br />
MAY LEAD TO REJECTION OF SUPPLIER’S BID.<br />
5. YOUR OFFER SHALL BE IN TOTAL COMPLIANCE WITH RFQ DOCUMENTS CONTAINING<br />
COMMERCIAL AND TECHNICAL SPECIFICATIONS INCLUDING GENERAL / TECHNICAL<br />
NOTES AND SCOPE OF SUPPLY/SERVICES/SITE WORK, AS APPLICABLE INCLUDING<br />
DOCUMENTATION AS PER MATERIAL REQUISITION (MR) AND SUBSEQUENT<br />
TECHNICAL/COMMERCIAL AMENDMENT AND TECHNICAL/ COMMERCIAL CORRIGENDUM,<br />
IF ANY.<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
SUPPLIER’S CONFIRMATION<br />
1. Price Basis:<br />
i) Quoted supply prices are on FOT - Despatch Point<br />
basis inclusive <strong>of</strong> Packing & Forwarding.<br />
Confirmed<br />
ii)<br />
iii)<br />
iv)<br />
Specify Despatch Point for Supplies<br />
Freight Charges:<br />
a) Confirm firm transportation charges in<br />
percentage (%) <strong>of</strong> quoted prices by GATI/XPS<br />
Cargo inclusive <strong>of</strong> Service Tax and Ed Cess,<br />
upto project site, has been quoted separately<br />
by you in Price Schedule.<br />
b) No Variation on any account (including<br />
Statutory Variation) on Service Tax on<br />
Transportation Charges shall be paid by the<br />
owner. Confirm compliance.<br />
Insurance:<br />
a) For Supply Only<br />
Transit/Marine Insurance <strong>of</strong> Equipment/Item<br />
has been taken care by the Owner & charges<br />
<strong>of</strong> the same have not been included in the<br />
quoted prices.<br />
………………..<br />
Indicated in Price Schedule<br />
Confirmed<br />
Applicable / Not Applicable<br />
Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 64 <strong>of</strong> 143
A166_ATC (I) Page 2 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
SUPPLIER’S CONFIRMATION<br />
b) For Supply + Site Work<br />
Comprehensive Insurance (Transit/Marinecum-storage-cum-erection<br />
till handing over <strong>of</strong><br />
equipment) has been taken care by the Seller<br />
& charges <strong>of</strong> the same have been included in<br />
the quoted prices.<br />
2. Excise Duty applicable extra on Finished Goods:<br />
Applicable / Not Applicable<br />
Confirmed<br />
a) Specify Excise Tariff Sub-Heading No.<br />
b) Present Rate <strong>of</strong> Excise Duty & Edu. Cess payable<br />
extra on finished goods (including Spares)<br />
…………………<br />
………..%<br />
c) Any variations in Excise Duty & Edu. Cess at the<br />
time <strong>of</strong> supplies for any reasons including variation<br />
due to Turnover shall be borne by the Seller. Only<br />
Confirmed<br />
Statutory Variations within the Contractual Delivery /<br />
completion period shall be borne by Purchaser.<br />
d) If Excise Duty & Edu. Cess is Nil or not applicable at<br />
present due to any reason, the same shall be borne<br />
Confirmed<br />
by Seller if it becomes applicable later.<br />
e) Confirm Excise Duty & Edu. Cess will not be<br />
applicable on transportation charges.<br />
Confirmed<br />
f) If Excise Duty & Edu. Cess is Nil or not applicable<br />
on transportation charges presently, and if it<br />
becomes applicable at the time <strong>of</strong> delivery due to<br />
Confirmed<br />
any reasons other than statutory, the same will be<br />
borne by the Supplier. Confirm acceptance.<br />
g) Non Cenvatable Excise Duty, if any is included<br />
in quoted prices & no variation on any account<br />
(including statutory variation) shall be paid by<br />
Confirmed<br />
Owner.<br />
h) Only Statutory Variations, if any, in the present rate<br />
<strong>of</strong> Excise Duty, upto the Contractual Delivery Date /<br />
Completion Period shall be to Owner’s account<br />
Confirmed<br />
subject to documentary evidence to be furnished by<br />
Seller.<br />
3. Sales Tax applicable extra on finished goods:<br />
a) Central Sales Tax against Concessional Form “C”<br />
payable extra on finished goods (including spares)<br />
is applicable & the present rate (in %age) is<br />
indicated<br />
Applicable / Not Applicable<br />
…………%<br />
b) Kerala VAT payable extra on finished goods<br />
(including spares) without concessional form is<br />
applicable & the present rate (in %age) is indicated<br />
Applicable / Not Applicable<br />
………….%<br />
c) If CST / Kerala VAT is Nil or not applicable at<br />
present due to any reason, the same shall be borne<br />
Confirmed<br />
by Supplier if it becomes applicable later.<br />
d) Confirm CST/ Kerala VAT will not be applicable on<br />
transportation charges.<br />
Confirmed<br />
e) If CST / Kerala VAT is Nil or not applicable on<br />
transportation charges presently, and if it becomes<br />
applicable at the time <strong>of</strong> delivery due to any reasons<br />
other than statutory, the same will be borne by the<br />
Confirmed<br />
Supplier. Confirm acceptance.<br />
f) Only Statutory Variations, if any, in the present rate Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 65 <strong>of</strong> 143
A166_ATC (I) Page 3 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
<strong>of</strong> CST / Kerala VAT, upto the Contractual Delivery<br />
Date / Completion Period shall be to Owner’s<br />
account subject to documentary evidence to be<br />
furnished by Seller.<br />
4. Octroi / Entry Tax:<br />
Octroi / Entry Tax, if applicable on finished goods (including<br />
spares) shall be borne and paid directly by Owner. Confirm<br />
that Octroi / Entry Tax has not been included in the quoted<br />
prices.<br />
5. Any new or additional taxes/ duties and any increase in the<br />
existing Cenvatable taxes/duties imposed after contractual<br />
completion period shall be to Supplier’s account whereas<br />
any corresponding decrease in the existing Cenvatable<br />
taxes/ duties shall be passed on to the Owner.<br />
6.<br />
Spares Parts:<br />
a) Confirm item wise unit price (FOT Despatch Point)<br />
<strong>of</strong> following spare parts as required in Material<br />
Requisition (MR) have been quoted/included<br />
indicating itemised quantity.<br />
SUPPLIER’S CONFIRMATION<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
i) Mandatory Spares are quoted as per MR. Confirmed (if Applicable as per MR)<br />
ii)<br />
iii)<br />
Commissioning spares as specified in MR are<br />
included in the quoted Price.<br />
Special Tools & Tackles as specified in the MR<br />
are included in the quoted prices.<br />
iv) Confirm spares wherever required have been<br />
included in the quoted price and list <strong>of</strong> spares<br />
is also furnished.<br />
b) i) Recommended Spares for Two Years<br />
Operation & Maintenance<br />
Recommended Spares for Two Years<br />
Operation & Maintenance, as specified in MR<br />
have been quoted separately with Price<br />
validity <strong>of</strong> One (1) year from Contractual<br />
Delivery Date for Main Items/Equipment & List<br />
<strong>of</strong> such spares has been furnished in the<br />
Unpriced Bid.<br />
ii) Firm Freight charges upto Site for the<br />
Recommended O & M Spares as per Sl. No. (i)<br />
above, is indicated (in %age)<br />
7. Site Work:<br />
For Site Work, if in the scope <strong>of</strong> the Bidder as per MR,<br />
please confirm the following:<br />
a) Confirm that quoted site work prices are exclusive <strong>of</strong><br />
Service Tax & Edu. Cess but inclusive <strong>of</strong> VAT on<br />
Works Contract and all other applicable taxes &<br />
duties.<br />
b) Percentage <strong>of</strong> Service Tax & Edu. Cess as<br />
applicable extra on Site Work.<br />
c) Supplier shall submit the Assessment/ Liability<br />
Certificate from Sales Tax authorities indicating the<br />
VAT on Works Contract payable for enabling Owner<br />
Confirmed (if Applicable as per MR)<br />
Confirmed (if Applicable as per MR)<br />
Confirmed (if Applicable as per MR)<br />
Confirmed (if Applicable as per MR)<br />
Indicated in Price Schedule<br />
Confirmed<br />
Indicated in Price Schedule<br />
Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 66 <strong>of</strong> 143
A166_ATC (I) Page 4 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
to deduct the same from Supplier Invoices & make<br />
payment to the tax authorities. TDS Certificate<br />
towards VAT on Works Contract shall be provided<br />
by Owner. Statutory variation on VAT on Works<br />
Contract shall not be payable by Owner.<br />
d) Statutory Variation on Service Tax & Edu. Cess on<br />
Site work shall be paid by the Owner against<br />
documentary evidence within Contractual<br />
completion period.<br />
e) Confirm that Entry Tax / Octroi applicable on<br />
Construction Machinery/Equipment brought by the<br />
supplier to site to execute / complete the site work<br />
shall be borne by the Supplier and same is included<br />
in the quoted prices. No variation (including<br />
statutory) on such entry tax shall be paid by the<br />
Owner.<br />
8. Supervision / Training Charges:<br />
a) Charges for Supervision / Training, if in the scope <strong>of</strong><br />
the Bidder as per MR have been indicated by bidder<br />
separately in the Price Schedule.<br />
b) Percentage <strong>of</strong> Service Tax & Edu. Cess as<br />
applicable extra on Supervision / Training. Service<br />
Tax on supervision / Training charges quoted shall<br />
be considered for comparison/evaluation as detailed<br />
in Special Instructions to Bidders (SIB)<br />
c) Per-diem rate for supervision has been quoted in<br />
accordance with the Terms & Conditions for<br />
Supervision enclosed with the RFQ Documents.<br />
d) Where erection/ testing/ commissioning supervision,<br />
commissioning assistance is required as per RFQ<br />
Documents / Material requisition, penalty for non<br />
mobilization/delay in mobilization as per order shall<br />
be applicable. The penalty shall generally be 1.5<br />
times the per diem rate for each day <strong>of</strong> delay <strong>of</strong><br />
reporting to site and shall be in addition to price<br />
reduction for delayed delivery.<br />
e) Bidders shall also provide additional BG <strong>of</strong> an<br />
amount equal to the per diem charges for the<br />
number <strong>of</strong> days considered for evaluation, over and<br />
above 10% PBG to cover compensation for delay in<br />
mobilizing the erection/ commissioning personnel.<br />
This BG will be released to the bidder upon the<br />
erection/ commissioning personnel reporting at site.<br />
This BG shall be furnished along with last 10%<br />
supply payment and shall be initially valid up to six<br />
months which shall be extended based on the<br />
request by Owner.<br />
9. Confirm documentation charges as per MR are included in<br />
quoted prices.<br />
10. Price Reduction for delay in completion / delivery:<br />
a) Clause No.9 <strong>of</strong> General Purchase Conditions (GPC)<br />
(Indigenous) shall stand modified to the following<br />
extent:-<br />
Contractual Delivery date for despatches<br />
F.O.R. Destination / F.O.R. Site the date <strong>of</strong><br />
delivery shall be the date on which the goods /<br />
SUPPLIER’S CONFIRMATION<br />
Confirmed<br />
Confirmed<br />
Confirmed, Quoted in Price Schedule<br />
Quoted in Price Schedule<br />
Confirmed<br />
Noted & Confirmed<br />
Noted & Confirmed<br />
Confirmed<br />
Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 67 <strong>of</strong> 143
A166_ATC (I) Page 5 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
materials are delivered to nearest Destination<br />
rail head or owner’s warehouse at Site. The<br />
time and date <strong>of</strong> delivery <strong>of</strong> stores / materials /<br />
equipment as stipulated in the order shall be<br />
deemed to be the essence <strong>of</strong> the contract. In<br />
case <strong>of</strong> delay in execution <strong>of</strong> the order beyond<br />
the date <strong>of</strong> delivery as stipulated in the order or<br />
any extensions sanctioned, owner may at his<br />
option.<br />
(i) Accept delayed delivery at prices<br />
reduced by a sum equivalent to one half<br />
<strong>of</strong> one percent (1/2%) <strong>of</strong> the value <strong>of</strong><br />
any goods not delivered for per day<br />
<strong>of</strong> delay, limited to a maximum <strong>of</strong> 5% <strong>of</strong><br />
the total order value.<br />
(ii) Cancel the order in part or full and<br />
purchase such cancelled quantities<br />
from elsewhere on account and at the<br />
risk <strong>of</strong> the vendor, without prejudice to<br />
its right under (i) above in respect <strong>of</strong><br />
goods delivered.<br />
Liquidated damages or penalty are not acceptable.<br />
b) In case <strong>of</strong> delay, vendor will reduce the invoice<br />
amount by applicable reduction.<br />
SUPPLIER’S CONFIRMATION<br />
Confirmed<br />
11. Delivery / Completion Period:<br />
Please confirm delivery / completion period as specified in<br />
the RFQ Covering Letter<br />
Confirmed<br />
12. Payment Terms:<br />
Confirm acceptance <strong>of</strong> “Terms and Mode <strong>of</strong> Payment” as<br />
per respective clause(s) given in SIB and RFQ covering<br />
letter.<br />
12.1 In case, quantity tolerance is specified in the Material<br />
Requisition(MR) then, payment shall be released for<br />
the actual quantity supplied and accepted as per MR<br />
specifications. Confirm compliance.<br />
13. Part Order:<br />
a) Confirm acceptance <strong>of</strong> Part Order clause as per<br />
GPC (Indigenous).<br />
b) The quantities against a particular item will not be<br />
split. Any charges quoted extra as lumpsum shall be<br />
applicable prorata on value basis in the event <strong>of</strong> part<br />
order.<br />
14. Repeat Order:<br />
Confirm Acceptance <strong>of</strong> Repeat Order clause as per RFQ<br />
Covering Letter / SIB / GPC.<br />
15. Performance Bank Guarantee:<br />
a) In the event <strong>of</strong> award <strong>of</strong> order, submission <strong>of</strong><br />
Performance Bank Guarantee for 10% <strong>of</strong> total order<br />
value valid till full guarantee period plus 3 (Three)<br />
Confirmed<br />
Confirmed<br />
Confirmed.<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 68 <strong>of</strong> 143
A166_ATC (I) Page 6 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
months.<br />
DESCRIPTION<br />
SUPPLIER’S CONFIRMATION<br />
b) The Performance Bank Guarantee shall be strictly<br />
as per enclosed pr<strong>of</strong>orma and shall be from any<br />
Indian Scheduled Bank or branch <strong>of</strong> an International<br />
Bank situated in India and registered with Reserve<br />
Bank <strong>of</strong> India as scheduled foreign Bank.<br />
16. Guarantee / Warranty:<br />
Confirm acceptance to Guarantee / Warranty clause as<br />
mentioned in the GPC/SIB.<br />
17. Firmness <strong>of</strong> prices:<br />
Confirm quoted prices shall remain firm and fixed till<br />
complete execution <strong>of</strong> order. Price Variation shall not be<br />
considered on any account.<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
18. Testing and Inspection charges:<br />
a) Goods supplied are subject to stage wise and final<br />
inspection as specified in MR by <strong>EIL</strong> and no extra<br />
charges shall be payable by Owner towards the<br />
same. Travel, Living and Personnel expenses <strong>of</strong><br />
<strong>EIL</strong>’s Representative shall be borne by Owner.<br />
Confirmed<br />
b) Quoted prices are:<br />
i) Inclusive <strong>of</strong> all testing and inspection charges<br />
(if applicable) as per MR.<br />
Confirmed<br />
ii)<br />
iii)<br />
Inclusive <strong>of</strong> all IBR/IGC/NACE charges (if<br />
applicable) as required in the Material<br />
Requisition.<br />
Inclusive <strong>of</strong> all statutory certification charges<br />
PESO/CCOE, etc. (if applicable) as required<br />
in the Material Requisition<br />
Confirmed<br />
Confirmed<br />
c) Is your shop approved by IBR/CCE authority, if yes,<br />
indicate validity.<br />
i) IBR Validity Upto :__________________<br />
ii) CCE Validity Upto: __________________<br />
iii)<br />
19. Import Content:<br />
It is the responsibility <strong>of</strong> supplier to get the<br />
entire imported materials and the built in<br />
imported contents inspected by TPIA (i.e.<br />
M/s.Certification Engineers International Ltd.<br />
(C<strong>EIL</strong>)/M/s.Lloyds Register <strong>of</strong> Industrial<br />
Services (LRIS)/ M/s.Det Norske<br />
Veritas(DNV)/ M/s.Bureau Veritas (BV) /<br />
M/s.TUV) in the country <strong>of</strong> origin and the<br />
quoted prices are inclusive <strong>of</strong> charges<br />
towards the same.<br />
If your <strong>of</strong>fer is based on certain imported raw materials<br />
required for equipments/ materials <strong>of</strong>fered, please specify<br />
the following :<br />
Confirmed<br />
(Applicable / Not Applicable)<br />
(Please tick whichever is applicable)<br />
a) Confirm that quoted prices are based on Merit rate<br />
<strong>of</strong> Customs duty, CVD, Educational Cess and SAD<br />
as applicable.<br />
Confirmed<br />
b) Indicate rate <strong>of</strong> Import Duties considered and Refer Annexure to Price Schedule<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 69 <strong>of</strong> 143
A166_ATC (I) Page 7 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
included in the quoted prices.<br />
SUPPLIER’S CONFIRMATION<br />
c) Indicate brief description / specification with<br />
itemised CIF value and country <strong>of</strong> origin <strong>of</strong> imported<br />
material.<br />
d) Indicate classification with tariff no. under which<br />
Vendor intends to import.<br />
e) Confirm prices shall be firm on account <strong>of</strong> variation<br />
in foreign exchange rate.<br />
Refer Annexure to Price Schedule<br />
Refer Annexure to Price Schedule<br />
Confirmed<br />
f) Owner shall not provide any import licence. Noted<br />
g) Quoted prices are after considering the benefit <strong>of</strong><br />
CENVAT on CVD including Edu. Cess. In case<br />
material is shipped directly to Port/Project Site,<br />
quoted prices are excluding CENVAT benefit.<br />
h) In case material is directly dispatched from port,<br />
CVD amount shall be reimbursed subject to<br />
submission <strong>of</strong> bill <strong>of</strong> entry documents along with<br />
CVD invoice.<br />
i) Any upward variation due to change in Customs<br />
Duty classifications shall be absorbed by the<br />
vendor. However, any reduction in customs duty<br />
due to change in classification shall be passed on to<br />
Owner.<br />
j) Statutory variations, if any, in the rate <strong>of</strong> Import<br />
Duties upto 2/3 rd contractual delivery period shall be<br />
to Owner’s account.<br />
k) Any increase in price due to increase in the rate <strong>of</strong><br />
Import Duties, due to any reasons, whatsoever,<br />
beyond the 2/3 rd contractual delivery period, shall<br />
be to vendor's account. However, any decrease in<br />
Import Duties rate at the time <strong>of</strong> actual clearance <strong>of</strong><br />
imported materials shall be passed on to Owner.<br />
l) The CIF Value(s) indicated by the vendor shall be<br />
deemed to be the maximum value(s) for the<br />
purpose <strong>of</strong> payment <strong>of</strong> variation in custom duty<br />
and/or other statutory variations, if any, thereon.<br />
m) Variation in price due to Customs duty rate will be<br />
dealt separately after receipt <strong>of</strong> material at site,<br />
against documentary evidence.<br />
20. Validity <strong>of</strong> Bid:<br />
Confirm Bid validity as stipulated in RFQ covering letter<br />
from the final due date <strong>of</strong> bid submission.<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
21. Compliance to RFQ documents:<br />
a) Confirm your <strong>of</strong>fer is in total compliance with RFQ<br />
Document containing technical specifications<br />
including General / Technical notes, scope <strong>of</strong><br />
supply/services/site work (as applicable) including<br />
Confirmed<br />
documentation as per Material Requisition (MR) and<br />
subsequent amendment and corrigendum, if any.<br />
b) Confirm your <strong>of</strong>fer is in total compliance with RFQ<br />
documentation containing commercial terms and<br />
conditions as per the following documents, without<br />
Confirmed<br />
any deviation:<br />
i) Request for Quotation (RFQ) Confirmed<br />
ii) Special Instructions to Bidders (SIB) Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 70 <strong>of</strong> 143
A166_ATC (I) Page 8 <strong>of</strong> 8<br />
SL.<br />
NO.<br />
DESCRIPTION<br />
SUPPLIER’S CONFIRMATION<br />
iii) General Purchase Conditions (GPC) Confirmed<br />
iv) Terms & Conditions <strong>of</strong> Site work / GCC / HSE Confirmed(if applicable)<br />
v) Integrity Pact Confirmed<br />
vi) Terms & Conditions for Supervision services Confirmed<br />
vii) Commercial / Technical Amendments, if any Confirmed<br />
22. Whether any <strong>of</strong> the Directors <strong>of</strong> Bidder is a relative <strong>of</strong> any<br />
Director <strong>of</strong> Owner/<strong>EIL</strong> or the Bidder is a firm in which any<br />
Director <strong>of</strong> Owner/<strong>EIL</strong> or his relative is a Partner or the<br />
Bidder is a private company in which any director <strong>of</strong><br />
Owner/<strong>EIL</strong> is a member or Director.<br />
23. Please confirm you have not been banned or delisted by<br />
any Government or Quasi Government agencies or PSUs.<br />
If you have been banned, then this fact must be clearly<br />
stated. This does not necessarily mean cause for<br />
disqualification. However if this declaration is not furnished<br />
the bid shall be rejected as non-responsive.<br />
24. Please confirm your <strong>of</strong>fer contains the following:<br />
24.1 UNPRICED OFFER- without any Deviations<br />
24.2 PRICED OFFER<br />
Duly filled Price Schedule with relevant annexures<br />
25. Please confirm that you have quoted strictly for items<br />
based on your registration/approval with <strong>EIL</strong> as on date <strong>of</strong><br />
issue <strong>of</strong> RFQ.<br />
26. Any claim arising out <strong>of</strong> order shall be sent to Owner in<br />
writing with a copy to <strong>EIL</strong> within 3 months from the date <strong>of</strong><br />
last despatch. In case the claim is received after 3 months,<br />
the same shall not be entertained by Consultant/ Owner.<br />
27. Printed terms and conditions, if any, appearing in quotation,<br />
shall not be applicable in the event <strong>of</strong> order. In case <strong>of</strong><br />
contradiction between the confirmations given above and<br />
terms & conditions mentioned elsewhere in the <strong>of</strong>fer, the<br />
confirmation given/confirmed herein above shall prevail.<br />
28. Confirm that Net worth <strong>of</strong> the Bidder’s company is<br />
positive as per the immediate preceding year’s<br />
audited financial results & Immediate preceding year’s<br />
audited annual financial results has been submitted along<br />
with unpriced bid.<br />
29. Confirm acceptance to Technical<br />
Specifications/Notes, etc., as per Material Requisition<br />
(MR) without any deviation, failing which <strong>of</strong>fer shall be<br />
liable for rejection as the Material Requisition being a<br />
category-I.<br />
Confirmed No relation<br />
Not Banned<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed<br />
Confirmed & Submitted<br />
Confirmed<br />
SUPPLIER’S SIGNATURE WITH STAMP/SEAL<br />
Page 71 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
INTEGRATED REFINERY EXPANSION PROJECT<br />
OF<br />
M/s BHARAT PETROLEUM CORPORATION LTD,<br />
KOCHI REFINERY, KOCHI, KERALA<br />
SPECIAL INSTRUCTION TO BIDDER<br />
(SIB)<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 1 <strong>of</strong> 22<br />
Page 72 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
SECTION – A (TERMS OF PAYMENT)<br />
1.0 Payment Terms For Indian Bidders<br />
2.0 Payment Terms For Foreign Bidders<br />
3.0 Ocean Freight<br />
INDEX<br />
SECTION – B: EVALUATION CRITERIA FOR COMPARISION OF BIDS<br />
4.0 Where only Indian Bids are under comparison<br />
5.0 Where only Foreign Bids are under comparison<br />
6.0 Where Indian as well as Foreign Bids are under comparison<br />
7.0 General Notes<br />
8.0 Special Notes on Taxes/Duties and CENVAT benefits<br />
9.0 Price Reduction Schedule Towards Delay In Delivery<br />
10.0 Guarantee / Warranty Period<br />
SECTION-C: (COMMERCIAL LOADING OF OFFERS IN CASE OF DEVIATIONS)<br />
11.0 Basis <strong>of</strong> Loading<br />
12.0 Payment Terms<br />
13.0 Performance Bank Guarantee (PBG)<br />
14.0 Delayed Deliveries<br />
15.0 Price Variation<br />
16.0 Freight charges<br />
17.0 Indian taxes/ duties<br />
18.0 Utilities<br />
19.0 Delivery/Completion Period<br />
20.0 Foreign Exchange Rate Variation/Custom Duty Variation For Indian Bidders (On<br />
Built-In Import Content)<br />
21.0 VAT on Works Contracts/ Service Tax/ Splitting Of Orders<br />
22.0 Entry Tax<br />
23.0 Rejection Criteria<br />
24.0 Suo-Moto Changes In Prices<br />
25.0 Price Implication Not Permitted<br />
26.0 Integrity Pact<br />
SECTION-D: SPECIAL CONDITIONS.<br />
27.0 Delivery Schedule/ Completion Period<br />
28.0 Despatch Instructions for Indigenous Supplies<br />
29.0 Additional Taxes & Duties (Applicable For Indian Bidder)<br />
30.0 Recovery Of Custom Duty, Excise Duty And Sales Tax<br />
31.0 Governing Law<br />
32.0 Purchaser’s Rights And Remedies<br />
33.0 Deduction At Source<br />
34.0 Statutory Approval<br />
35.0 Lien<br />
36.0 Limitation Of Liability<br />
SECTION-E: GENERAL INSTRUCTIONS<br />
37.0 General<br />
38.0 Fraudulent Practices<br />
39.0 One Bid Per Bidder<br />
40.0 Language Of Bid<br />
41.0 Earnest Money Deposit:<br />
42.0 Modification And Withdrawal Of Bids<br />
43.0 Examination Of Bids And Determination Of Responsiveness<br />
44.0 Owner’s Right To Accept Any Bid And To Reject Any Bid<br />
45.0 Notification Of Award<br />
46.0 Waiver Or Transfer Of The Agreement<br />
47.0 T&C For Foreign Suppliers (To Whom RFQ Issued) Operated Through Their Indian<br />
Office / Subsidiaries<br />
48.0 Tax Residency Certificate (TRC) Format For Foreign Bidder<br />
49.0 Requirement <strong>of</strong> Employment Visa For Foreign Nationals<br />
SECTION-F: ADDITIONAL CLAUSES TO GPC<br />
50.0 Settlement <strong>of</strong> dispute between CPSEs or CPSEs & Government Departments<br />
Annexure-A ( Terms & Conditions For Indian Sourced Components / Services By<br />
Foreign Bidder)<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 2 <strong>of</strong> 22<br />
Page 73 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
SPECIAL INSTRUCTIONS TO BIDDERS<br />
BHARAT PETROLEUM CORPORATION LIMITED, KOCHI REFINERY<br />
INTEGRATED REFINERY EXPANSION PROJECT<br />
SECTION-A: TERMS OF PAYMENT<br />
In partial modification <strong>of</strong> the Payment Terms as mentioned in the General Purchase Conditions, the following<br />
payment terms shall be applicable.<br />
1.0 PAYMENT TERMS FOR INDIAN BIDDERS:<br />
1.1 Where the Material Requisition is only for supply <strong>of</strong> materials and there is no Supplier Data<br />
Requirement specified in MR e.g. Bulk Piping Items, etc.<br />
1.1.1 100% Payment within 30 days after receipt and acceptance <strong>of</strong> materials at site and on submission <strong>of</strong><br />
Performance Bank Guarantee for 10% <strong>of</strong> Total Order Value, valid till the full guarantee period plus<br />
Three months claim period.<br />
1.2 Where the Material Requisition calls for Supplier Drawings/Technical Documentation.<br />
1.2.1 90% Payment within 30 days <strong>of</strong> receipt and acceptance <strong>of</strong> materials at Site and on submission <strong>of</strong><br />
dispatch documents.<br />
1.2.2 10% Payment after receipt <strong>of</strong> final technical documentation as per PR against <strong>EIL</strong>’s certification and<br />
on submission <strong>of</strong> Performance Bank Guarantee for 10% <strong>of</strong> Total Order Value, valid till full guarantee<br />
period plus Three months claim period.<br />
1.3 Where Supply <strong>of</strong> materials and Erection or Site Work are in the scope <strong>of</strong> Supplier and<br />
Package Items.<br />
1.3.1 Supply<br />
1.3.1.1 5% Payment on approval <strong>of</strong> all drawings atleast in CODE-2 by <strong>EIL</strong> against submission <strong>of</strong> Bank<br />
Guarantee <strong>of</strong> equivalent amount valid till complete execution <strong>of</strong> Order plus Three months claim<br />
period.<br />
1.3.1.2 15% Payment after receipt <strong>of</strong> identified raw materials at Supplier’s Works and against certification by<br />
<strong>EIL</strong> and submission <strong>of</strong> Bank Guarantee <strong>of</strong> equivalent amount valid till complete execution <strong>of</strong> Order<br />
plus Three months claim period.<br />
1.3.1.3 60% Payment after receipt <strong>of</strong> equipment/materials at BPCL’s Site. Billing Schedule to be furnished<br />
by the Supplier in case pro-rata payments are required.<br />
1.3.1.4 10% payment after completion <strong>of</strong> Site Work and submission <strong>of</strong> final Technical documents as<br />
specified in the Purchase Requisition against <strong>EIL</strong>’s Certification and submission <strong>of</strong> Performance<br />
Bank Guarantee for 10% <strong>of</strong> Total Order Value (Supply plus Site Work), valid till full guarantee period<br />
plus three months claim period.<br />
In case <strong>of</strong> delay in start <strong>of</strong> the site work beyond 6 months, the above 10% Payment shall be released<br />
against submission <strong>of</strong> Bank Guarantee <strong>of</strong> equivalent amount valid initially for 1 year and subject to<br />
extension upto completion <strong>of</strong> the site work. However, in the event <strong>of</strong> delay in the site work, the<br />
Supplier is not relieved <strong>of</strong> his responsibility to carry out the same.<br />
1.3.1.5 10% payment within 30 days <strong>of</strong> handing over the successfully commissioned equipment. Wherever<br />
commissioning is not in the Supplier’s scope, the payment will be released after completion <strong>of</strong> Site<br />
Work as per PR and handing over <strong>of</strong> equipment.<br />
1.3.2 Erection/ Site work<br />
1.3.2.1 90% Payment against monthly running bills (based on agreed Billing Schedule), duly certified by<br />
<strong>EIL</strong>.<br />
1.3.2.2 10% Payment within 30 days after final handing over <strong>of</strong> equipment package to BPCL at site.<br />
1.4 Fabricated Items (Vessels, Columns, Heat Exchangers, etc.)<br />
1.4.1 5% Payment on approval <strong>of</strong> all drawings atleast in CODE-2 by <strong>EIL</strong> against submission <strong>of</strong> Bank<br />
Guarantee <strong>of</strong> equivalent amount valid till complete execution <strong>of</strong> Order plus Three months claim<br />
period.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 3 <strong>of</strong> 22<br />
Page 74 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
1.4.2 15% after receipt <strong>of</strong> identified raw materials at Supplier’s Works and against certification by <strong>EIL</strong> and<br />
submission <strong>of</strong> Bank Guarantee <strong>of</strong> equivalent amount valid till complete execution <strong>of</strong> Order plus<br />
Three months claim period.<br />
1.4.3 60% Payment through NEFT against receipt <strong>of</strong> materials at BPCL’s Site. Billing Schedule to be<br />
furnished by the Supplier in case pro-rata payments are required.<br />
1.4.4 10% Payment after receipt <strong>of</strong> final documents as required in Purchase Requisition against <strong>EIL</strong>’s<br />
certification and on submission <strong>of</strong> Performance Bank Guarantee for 10% <strong>of</strong> Total Order Value, valid<br />
till full guarantee period plus Three months claim period.<br />
1.4.5 Balance 10% Payment within 30 days <strong>of</strong> receipt <strong>of</strong> equipment at Site.<br />
1.5 Other Items (Pumps, Compressors, Switchgears, etc.)<br />
1.5.1 5% Payment on approval <strong>of</strong> all drawings atleast in CODE-2 by <strong>EIL</strong> against submission <strong>of</strong> Bank<br />
Guarantee <strong>of</strong> equivalent amount valid till complete execution <strong>of</strong> Order plus Three months claim<br />
period.<br />
1.5.2 75% Payment against receipt <strong>of</strong> materials at BPCL’s Site. Billing Schedule to be furnished by the<br />
Supplier in case pro-rata payments are required.<br />
1.5.3 10% Payment after receipt <strong>of</strong> final documents as required in Purchase Requisition against <strong>EIL</strong>’s<br />
certification and on submission <strong>of</strong> Performance Bank Guarantee for 10% <strong>of</strong> Total Order Value, valid<br />
till full guarantee period plus three months claim period<br />
1.5.4 Balance 10% Payment against Commissioning/Demonstration <strong>of</strong> Performance Guarantee (if<br />
applicable) or 6 months from receipt <strong>of</strong> material at Site (against Bank Guarantee <strong>of</strong> equivalent<br />
amount valid for 1 year), whichever is earlier. However, in the event <strong>of</strong> delay in conducting the<br />
Performance Guarantee Run, the Supplier is not relieved <strong>of</strong> his responsibility to carry out the same.<br />
No additional payment shall be made for visit <strong>of</strong> Supplier to Site for demonstrating the performance,<br />
if the same is included in the scope <strong>of</strong> Supplier.<br />
For items where supervision during erection, testing and commissioning is not required, the last 10%<br />
Payment shall be released within 30 days <strong>of</strong> receipt <strong>of</strong> material at Site.<br />
1.6 Payment for PGTR / Per Diem Charges for Supervision <strong>of</strong> Erection, Testing &<br />
Commissioning<br />
1.6.1 100% Payment <strong>of</strong> Invoice Amount shall be paid on completion <strong>of</strong> supervision services / PGTR<br />
against submission <strong>of</strong> Invoice along with Time Sheet duly certified by <strong>EIL</strong>/BPCL Site-In-Charge.<br />
Payment shall be made after deducting Income Tax at applicable rate. Service Tax, if any, shall be<br />
paid on submission <strong>of</strong> Service Tax Invoice.<br />
1.6.2 Where erection/commissioning supervision, commissioning assistance is required from the vendor,<br />
penalty for non mobilization/delay in mobilization as per order shall also be specified in the<br />
specifications. The penalty shall generally be 1.5 times the per diem rate for each day <strong>of</strong> delay <strong>of</strong><br />
reporting to site and shall be in addition to price reduction for delayed delivery.<br />
1.6.3 Wherever supervision is in the scope <strong>of</strong> MR, bidders shall provide additional BG <strong>of</strong> an amount equal<br />
to the per diem charges for the number <strong>of</strong> days considered for evaluation over and above 10%<br />
PBG to cover compensation for delay in mobilising the erection/ commissioning personnel. This BG<br />
will be released to the bidder upon the erection/ commissioning personnel reporting at site. This BG<br />
shall be furnished along with payment milestone for submission <strong>of</strong> final documentation as per PR<br />
and shall be valid up to six months which shall be extended based on the request by BPCL. (In case<br />
where commissioning, Performance Guarantee Test, etc. are required and the 10% is under hold,<br />
this condition shall not be applicable).<br />
1.7 Transportation charges<br />
1.7.1 100% Payment within 4 weeks after receipt <strong>of</strong> materials at site.<br />
1.8 General<br />
1.8.1 Excise Duty, Service Tax & VAT on Supplies shall be released only on receipt <strong>of</strong> Cenvatable/<br />
Vatable copy <strong>of</strong> corresponding Invoice enabling availing <strong>of</strong> Input Credit by BPCL.<br />
1.8.2 No initial advance payment along with Order shall be made by the Owner against Supplies as well<br />
as Services (i.e. Transportation, Erection, Site Work, etc.). If a Supplier insists on the same, their<br />
Offer shall be rejected.<br />
1.8.3 Bank Guarantee(s) shall be issued through Scheduled Commercial Bank in India/ Indian Branch <strong>of</strong><br />
Foreign Bank, directly to BPCL as per the Pro-forma enclosed with RFQ documents and Supplier<br />
shall also enclose copy <strong>of</strong> the same along with Invoice.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 4 <strong>of</strong> 22<br />
Page 75 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
1.8.4 All payments shall be released either through Electronic Clearing System (ECS) / Electronic Fund<br />
Transfer (EFT)/ Real Time Gross Settlement (RTGS) or through internet, within 30 days <strong>of</strong> receipt <strong>of</strong><br />
Invoice and all requisite documents, complete in all respects.<br />
1.8.5 Billing schedule shall be submitted to <strong>EIL</strong> & BPCL by the Supplier for approval within 30 days from<br />
the date <strong>of</strong> Purchase Order wherever specified therein. No payment against pro-rata dispatch shall<br />
be made without approval <strong>of</strong> Billing Schedule.<br />
1.8.6 Major Raw Material: Shall be as specified below:<br />
i. Columns and Vessels: Plates and Forgings<br />
ii.<br />
iii.<br />
iv.<br />
Heat Exchangers: Plates, Forgings and Tubes<br />
Pumps/Compressors: Castings and Drivers<br />
Any other item(s) as may be defined in MR/PR.<br />
2.0 PAYMENT TERMS FOR FOREIGN BIDDERS:<br />
2.1 Where the Material Requisition is only for Supply <strong>of</strong> materials<br />
2.1.1 100% <strong>of</strong> FOB Order Value shall be paid through an Irrevocable Letter <strong>of</strong> Credit against submission<br />
<strong>of</strong> Shipping Documents. The Letter <strong>of</strong> Credit shall be established only on receipt <strong>of</strong> acceptance <strong>of</strong><br />
Fax <strong>of</strong> Acceptance/Purchase Order along with submission <strong>of</strong> Bank Guarantee <strong>of</strong> 15% <strong>of</strong> Order Value<br />
(10% towards Performance Bank Guarantee & separate 5% Bank Guarantee towards Price<br />
Reduction Schedule due to delay in delivery), valid till full Guarantee period plus Three months claim<br />
period.<br />
For PGTR cases only<br />
In case <strong>of</strong> PGTR 90% supply amount shall be released through Letter <strong>of</strong> Credit and last 10% supply<br />
amount shall be released against successful demonstration <strong>of</strong> Performance Guarantee Test Run &<br />
submission <strong>of</strong> Invoices duly certified by Site-In-charge or 6 months from receipt <strong>of</strong> material at site<br />
(against BG <strong>of</strong> equivalent amount valid for 1 year), whichever is earlier. However in the event <strong>of</strong><br />
delay in conducting the PGTR, the bidder is not relieved <strong>of</strong> his responsibility to carry out the same.<br />
No additional payment shall be made for visit <strong>of</strong> supplier to site for demonstrating the PGTR, if the<br />
same is included in the scope <strong>of</strong> supplier.<br />
2.2 Where the Material Requisition calls for Supply <strong>of</strong> material and Erection or Site Work in the<br />
scope <strong>of</strong> Supplier and Package Items<br />
For Supply Portion<br />
2.2.1 90% Payment <strong>of</strong> FOB Supply value through an Irrevocable Letter <strong>of</strong> Credit against submission <strong>of</strong><br />
Shipping Documents. The Letter <strong>of</strong> Credit shall be established only on receipt <strong>of</strong> acceptance <strong>of</strong> Fax<br />
<strong>of</strong> Acceptance/Purchase Order along with submission <strong>of</strong> Bank Guarantee <strong>of</strong> 15% <strong>of</strong> Order Value<br />
(10% towards Performance Bank Guarantee & separate 5% Bank Guarantee towards Price<br />
Reduction Schedule due to delay in delivery), valid till full Guarantee period plus Three months claim<br />
period.<br />
2.2.2 10% Payment <strong>of</strong> FOB Supply value through direct wire transfer through banking channels on<br />
completion <strong>of</strong> Erection or Site Work or Commissioning/Performance Guarantee Test Run (PGTR) at<br />
site, as applicable as per Purchase Order/Purchase Requisition (PR) against submission <strong>of</strong> final<br />
documents or Certificate <strong>of</strong> Completion <strong>of</strong> Work by BPCL Site.<br />
For PGTR cases only<br />
The above amount (10%) shall be released against successful demonstration <strong>of</strong> Performance<br />
Guarantee Test Run & submission <strong>of</strong> Invoices duly certified by Site-In-charge or 6 months from<br />
receipt <strong>of</strong> material at site (against BG <strong>of</strong> equivalent amount valid for 1 year), whichever is earlier.<br />
However in the event <strong>of</strong> delay in conducting the PGTR, the bidder is not relieved <strong>of</strong> his responsibility<br />
to carry out the same. No additional payment shall be made for visit <strong>of</strong> supplier to site for<br />
demonstrating the PGTR, if the same is included in the scope <strong>of</strong> supplier.<br />
For Site Work Portion (Erection/Commissioning/PGTR)<br />
2.2.3 100% Payment <strong>of</strong> Amount for Erection or Site Work or Commissioning/Performance Guarantee Test<br />
Run (PGTR) at site, shall be paid through direct wire transfer through banking channels on<br />
completion <strong>of</strong> Erection or Site Work at site as per Purchase Order against submission <strong>of</strong> Certificate<br />
for Completion <strong>of</strong> Work by <strong>EIL</strong> Site.<br />
The Letter <strong>of</strong> Credit shall be established only on receipt <strong>of</strong> acceptance <strong>of</strong> Fax <strong>of</strong><br />
Acceptance/Purchase Order along with submission <strong>of</strong> Performance Bank Guarantee <strong>of</strong> 15% <strong>of</strong> Total<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 5 <strong>of</strong> 22<br />
Page 76 <strong>of</strong> 143
A307_SIB Rev.4 dtd: 22.02.2012 Page 6 <strong>of</strong> 22<br />
BPCL-KR<br />
Job: A307<br />
Order Value[Supply+Site Work] (10% towards Performance + 5% towards Price Reduction Schedule<br />
due to delay in delivery/completion), valid till full Guarantee period plus Three months claim period.<br />
2.3 For Training<br />
2.3.1 At Site: 100% payment against final bill to be submitted by seller after completion <strong>of</strong> training duly<br />
certified by site-in-charge.<br />
2.3.2 At Supplier’s Works: 100% payment against final bill to be submitted by seller after completion <strong>of</strong><br />
training.<br />
2.4 Annual Maintenance Contract<br />
100% payment shall be paid at the end <strong>of</strong> each quarter <strong>of</strong> the contractual year against quarterly<br />
progressive bills to be submitted by Seller duly certified by Site-in-Charge.<br />
2.5 Payment for PGTR / Per Diem Charges for Supervision <strong>of</strong> Erection, Testing &<br />
Commissioning<br />
2.5.1 100% Payment <strong>of</strong> Invoice amount through direct wire transfer as per normal banking channels on<br />
completion <strong>of</strong> supervision activity / PGTR upon submission <strong>of</strong> Invoice, Time Sheet duly certified by<br />
Site In-Charge at BPCL Site, legible copy <strong>of</strong> visa (showing date <strong>of</strong> entry and date <strong>of</strong> exit from India)<br />
and passport (showing Name and Nationality <strong>of</strong> the personnel). Payment shall be made after<br />
deducting Income Tax at applicable rate.<br />
2.5.2 Where erection/commissioning supervision, commissioning assistance is required from the vendor,<br />
penalty for non mobilization/delay in mobilization as per order shall also be specified in the<br />
specifications. The penalty shall generally be 1.5 times the per diem rate for each day <strong>of</strong> delay <strong>of</strong><br />
reporting to site and shall be in addition to price reduction for delayed delivery.<br />
2.5.3 Wherever supervision is in the scope <strong>of</strong> MR, bidders shall provide additional BG <strong>of</strong> an amount equal<br />
to the per diem charges for the number <strong>of</strong> days considered for evaluation over and above 10%<br />
PBG to cover compensation for delay in mobilising the erection/ commissioning personnel. This BG<br />
will be released to the bidder upon the erection/ commissioning personnel reporting at site. This BG<br />
shall be furnish along with dispatch documents which shall be initially valid up to six months whixh<br />
shall be extended based on the request by BPCL.<br />
2.6 General<br />
2.6.1 No initial advance payment along with Order shall be made by the Owner against Supplies as well<br />
as Services (i.e. Transportation, Erection, Site Work, etc.). If a Supplier insists on the same, their<br />
Offer shall be rejected.<br />
2.6.2 All Bank Guarantee(s) shall be issued through Scheduled Commercial Bank in India or Indian<br />
Branch <strong>of</strong> Foreign Bank as per Pro-forma provided in RFQ documents. All Bank Guarantees will be<br />
directly to BPCL by the Bank.<br />
2.6.3 All bank charges and stamp duties payable outside India in connection with payments shall be borne<br />
by the Supplier. All bank charges and stamp duties payable in India shall be borne by BPCL except<br />
L/C Amendment charges for delays in delivery. Confirmation charges for Confirmed L/C shall be<br />
borne by Supplier.<br />
2.6.4 Billing schedule shall be submitted to <strong>EIL</strong> & BPCL by the Supplier for approval within 30 days from<br />
the date <strong>of</strong> Purchase Order wherever specified therein. No part shipment shall be made without<br />
approval <strong>of</strong> billing schedule.<br />
2.6.5 Subject to Technical Acceptability, For supplies sourced within India (if any) by Foreign<br />
Bidder & directly dispatched to Site shall have following provisions: (Refer Annexure-A)<br />
3.0 OCEAN FREIGHT:<br />
3.1 Ocean freight from FOB Port <strong>of</strong> Exit to designated Indian Port shall be arranged by BPCL through<br />
their nominated Freight Forwarder. Supplier shall arrange handing over the material to BPCL Freight<br />
Forwarder at the designated Port <strong>of</strong> Exit.<br />
3.2 In cases where the RFQ requires the Supplier to quote Ocean Freight, BPCL reserves the right to<br />
ask the Supplier to arrange shipment through their own Freight Forwarder at the quoted freight<br />
rates.<br />
3.3 Owner/<strong>EIL</strong> reserves the right to place the order for foreign bidder either on FOB basis or CFR basis.<br />
In case <strong>of</strong> award, initially the order shall be placed on FOB basis and Owner reserves the right to<br />
convert the same to CFR basis within 4 months, from placement <strong>of</strong> order. Therefore, the Ocean<br />
Freight Charges/ CFR prices should be valid for additional 4 months from the date <strong>of</strong> Order. The<br />
Page 77 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
bidder is required to furnish the shipping details within 45 days from the date <strong>of</strong> order. In case the<br />
bidder is not able to prove the shipping details within 45 days then 4 months shall be considered<br />
from the date <strong>of</strong> receipt <strong>of</strong> shipping details <strong>of</strong> consignment for converting FOB to CFR.<br />
3.4 Above clause no. 3.1 to 3.3 is not applicable for Turn-Key jobs where ocean freight along with<br />
Marine cum transit cum erection insurance in bidders scope.<br />
SECTION – B: EVALUATION CRITERIA FOR COMPARISION OF BIDS<br />
4.0 WHERE ONLY INDIAN BIDS ARE UNDER COMPARISON:<br />
<br />
<br />
<br />
<br />
Bids shall be evaluated on the basis <strong>of</strong> Net Effective Price i.e. landed cost at Site including<br />
Third Party Inspection charges (if applicable) by Third Party Inspection Agency as nominated by<br />
BPCL minus CENVAT/ Set Off benefit available to BPCL.<br />
Commercial loading shall be done on FOT Dispatch Point price.<br />
If a Bidder does not quote freight charges, his <strong>of</strong>fer shall be loaded with maximum freight<br />
charges as quoted by the other bidders.<br />
Taxes/Duties:<br />
Taxes and Duties will be loaded as applicable. However, if a Bidder states that the Sales<br />
Tax/ Excise Duty is not applicable at present or quotes lesser percentage stating the same will be<br />
charged as applicable at the time <strong>of</strong> delivery, then such Bidder’s price will be loaded by the highest<br />
rate as indicated by the remaining bidders.<br />
5.0 WHERE ONLY FOREIGN BIDS ARE UNDER COMPARISON:<br />
<br />
Bids shall be evaluated on the CIF basis including Custom Clearance (as mentioned below),<br />
considering firm ocean freight up to Port <strong>of</strong> Entry (Kochi, India) as quoted by bidders.<br />
Sl. No. Head Basis<br />
1 F.O.B. Price As quoted by the Bidder (including stowage charges in case <strong>of</strong><br />
pipes*) and Third Party Inspection charges.<br />
* Stowage charges, if not included in the quoted FOB Price, the<br />
same shall be loaded @ 10% <strong>of</strong> freight quoted by the Bidder.<br />
2 Add – Ocean Freight Firm Freight charges as quoted by Bidders or provision mentioned<br />
in the bid documents<br />
3 Add – Marine Insurance @ 1% <strong>of</strong> FOB Price<br />
4 Add – Customs Duty Prevailing Rate on (CIF value plus Landing Charges @ 1% <strong>of</strong> CIF<br />
Value)<br />
5 Commercial Loading, if any On FOB Value<br />
6 Less – Cenvatable Duties<br />
7 FOT SITE PRICE Sum Total (Sl. Nos. 1 ~ 5) – (Sl. No. 6)<br />
<br />
<br />
<br />
If a Bidder does not quote Ocean freight charges, his <strong>of</strong>fer shall be loaded with maximum freight<br />
charges as quoted by the other bidders.<br />
Comparison shall be done on equivalent Indian Rupees considering RBI Reference rate <strong>of</strong> Foreign<br />
Exchange published on the day <strong>of</strong> Opening <strong>of</strong> Priced Bids.<br />
Normally, deviations in Payment terms, Firm prices & Performance Bank Guarantee are not<br />
acceptable. However, wherever Bidder insists, the loading shall be done as applicable to Indigenous<br />
cases on FOB price.<br />
6.0 WHERE INDIAN AS WELL AS FOREIGN BIDS ARE UNDER COMPARISON:<br />
<br />
<br />
Domestic Bidders:<br />
Bids shall be evaluated on the basis <strong>of</strong> Landed Cost at Site (considering <strong>EIL</strong> Inspection<br />
charges @ 1.25% <strong>of</strong> FOT Dispatch Point price) including all duties, taxes and transportation charges<br />
less Cenvatable Excise Duty, Cenvatable Service Tax, VAT on Supplies, VAT on Works Contract,<br />
whichever is applicable.<br />
Commercial loading shall be done on FOT Dispatch Point price.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 7 <strong>of</strong> 22<br />
Page 78 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
<br />
Foreign Bidders:<br />
Bids shall be evaluated on the basis <strong>of</strong> landed cost at Site including the charges <strong>of</strong> inspection by<br />
Third Party Inspection Agency, all duties, taxes and ocean freight charges as under less Cenvatable<br />
CVD/SAD, Cenvatable Service Tax, VAT on Supplies, VAT on Works Contract, whichever is<br />
applicable.<br />
Sl. No. Head Basis<br />
1 F.O.B. Price As quoted by the Bidder (including stowage charges in case <strong>of</strong><br />
pipes*) and Third Party Inspection charges.<br />
* Stowage charges, if not included in the quoted FOB Price, the<br />
same shall be loaded @ 10% <strong>of</strong> freight quoted by the Bidder.<br />
2 Add – Ocean Freight Firm Freight charges as quoted by Bidders<br />
3 Add – Marine Insurance @ 1% <strong>of</strong> FOB Price<br />
4 Add – Customs Duty Prevailing Rate on (CIF value plus Landing Charges @ 1% <strong>of</strong> CIF<br />
Value)<br />
5 Add – Port Handling Charges @ 2% <strong>of</strong> CIF Value<br />
Sl. No. Head Basis<br />
6 Add – Inland Freight Charges<br />
from Port <strong>of</strong> Entry in India to<br />
Project Site<br />
1% <strong>of</strong> Landed Cost i.e. Sl. Nos. 1 to 5<br />
7 Add – L/C charges @ 1% <strong>of</strong> FOB Price<br />
8 Commercial Loading, if any On FOB Value<br />
9 Less – Cenvatable Duties<br />
10 FOT SITE PRICE Sum Total (Sl. Nos. 1 ~ 8) – (Sl. No. 9)<br />
7.0 GENERAL NOTES:<br />
i. Cost <strong>of</strong> Mandatory (Insurance) Spares, if identified in the Material Requisition, Commissioning<br />
spares and Special Tools & Tackles will be included for price evaluation <strong>of</strong> bids, but costs <strong>of</strong> Spares<br />
for Two Years Normal Operation & Maintenance shall be excluded.<br />
ii. Cost <strong>of</strong> loading towards Technical Parameters (Utilities, etc.) wherever applicable shall be carried<br />
out.<br />
iii. BPCL shall claim CENVAT benefits on Excise Duty, CVD/SAD, Service Tax as well as the Cess<br />
applicable and accordingly Excise Duty/ CVD/ SAD/ Cess/ Service Tax shall be considered and<br />
necessary credit shall be given for evaluation and comparison <strong>of</strong> bids.<br />
Wherever Site Work, AMC, Training, Supervision, etc. are required as per MR/RFQ, the same shall<br />
be considered for evaluation.<br />
iv.<br />
Bidders shall indicate the Customs Duty at Merit Rate in their Offer.<br />
v. The Bidder must ascertain and confirm along with supporting documents in the bid, if any Custom<br />
duty exemption / waiver is applicable to the products being supplied by bidder under any multi-lateral<br />
/ bi-lateral trade agreement between India and Bidder’s country.<br />
The bidder shall liable to provide all documentation to ensure availment <strong>of</strong> the exemption / waiver. In<br />
case the bidder defaults on this due to any reason whatsoever, they shall be liable to bear the<br />
incremental Custom Duty applicable, if any.<br />
Any Custom Duty applicability on account <strong>of</strong> any change in the bi-lateral / multi-lateral agreement<br />
shall be in bidder’s account.<br />
Documentation to be furnished for availing any exemption / waiver <strong>of</strong> Custom Duty shall be<br />
specifically listed in Letter <strong>of</strong> Credit also as the pre-requisite for release <strong>of</strong> payment against shipping<br />
documents and this documentation shall necessarily from a part <strong>of</strong> shipping documents.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 8 <strong>of</strong> 22<br />
Page 79 <strong>of</strong> 143
vi.<br />
vii.<br />
viii.<br />
ix.<br />
BPCL-KR<br />
Job: A307<br />
BPCL shall issue Concessional Form ‘C’ for Central SalesTax, for all applicable cases.<br />
Comparison shall be done on equivalent Indian Rupees considering RBI Reference Rate <strong>of</strong> Foreign<br />
Exchange published on the day <strong>of</strong> opening <strong>of</strong> the Price Bids.<br />
Foreign Suppliers prices shall separately indicate Third Party Inspection charges..<br />
Excise Duty, Central Sales Tax, VAT on Supplies & Service Tax shall not be included in the quoted<br />
prices and shall be payable extra at actual. BPCL shall claim eligible credit on CENVAT/Service<br />
Tax/VAT quoted by the Bidder and therefore eligible portion <strong>of</strong> CENVAT/Service Tax/VAT shall be<br />
considered for price comparison. Bidder shall be required to furnish proper invoices issued in<br />
accordance with relevant rules for enabling BPCL to avail CENVAT benefits. Further, the amount <strong>of</strong><br />
Excise Duty, Service Tax & VAT shall only be payable against submission <strong>of</strong> CENVATABLE/<br />
VATABLE Invoices, subject to maximum amount quoted in the Offer and in case <strong>of</strong> non-submission,<br />
will not be paid.<br />
x. Bidders quoted transportation charges shall be inclusive <strong>of</strong> service tax plus education cess<br />
thereupon applicable on transportation.<br />
xi.<br />
xii.<br />
xiii.<br />
Transit Insurance/ Marine Insurance shall be excluded from Supplier’s scope for the items where<br />
only supply is involved, and in such cases, the same shall be arranged by the Owner. For purchases<br />
involving Site Work, the Comprehensive Insurance (Transit/Marine cum Storage, Erection, till<br />
handing over <strong>of</strong> equipment) shall be in the scope <strong>of</strong> Supplier.<br />
Owner reserves its right to allow Public Sector Enterprises (Central/State), Micro & Small<br />
Enterprises (MSEs) and MSEs owned by Scheduled Caste (SC)/ Scheduled tribe (ST)<br />
entrepreneurs, purchase preference as admissible/applicable from time to time under the existing<br />
Govt. policy.<br />
If various item rates are present in the RFQ and if there is correction/wrong entry or a difference<br />
between the values entered in figures and in words, the following procedure shall be adopted for<br />
evaluation.<br />
i. When there is a difference between the rate in figures and in words for an item, the rate<br />
which corresponds to the amount worked out by the Bidder for the item based on the<br />
notional quantity specified, shall be taken as correct.<br />
ii.<br />
iii.<br />
iv.<br />
When the rate quoted by the Bidder in figures and words tallies but the amount is incorrect,<br />
the rate quoted by the Bidder shall be taken as correct.<br />
When it is not possible to ascertain the correct rate as detailed above, the rate quoted for<br />
the item in words shall be adopted as the quoted rate.<br />
If the total amount written against an item does not correspond to the rate written in figures<br />
and if the rate in words is missing, then the higher <strong>of</strong> the rates, i.e. higher <strong>of</strong> the rate worked<br />
out by dividing the amount by the notional quantity and the rate quoted shall be considered<br />
for evaluation In the event that such a bid is determined as the lowest bid, the lower <strong>of</strong> the<br />
rates shall be considered for award <strong>of</strong> works.<br />
8.0 SPECIAL NOTES ON TAXES/DUTIES AND CENVAT BENEFITS:<br />
(i) CST/ Kerala VAT (Applicable only on supplies being made from within state <strong>of</strong> Kerala), as<br />
applicable during the contractual delivery period, shall be paid by the supplier and the same<br />
shall be reimbursed on submission <strong>of</strong> the documentary pro<strong>of</strong>. 'C' Form for CST will be<br />
issued for all applicable cases. However no concessional form is applicable for Kerala VAT.<br />
(ii)<br />
(iii)<br />
(iv)<br />
CENVAT BENEFITS: In view <strong>of</strong> CENVAT/ Input credit benefits being available to BPCL on<br />
Excise Duty, no loading on Cenvatable excise duty and/ or interest thereon shall be<br />
considered for comparison <strong>of</strong> bids. In the case <strong>of</strong> Kerala VAT on Supplies, loading will be<br />
done to extent <strong>of</strong> 80% <strong>of</strong> VAT rate (since VAT credit is available for 20% only)<br />
In the case <strong>of</strong> Service Tax, Cenvat credit against Service Tax shall be available to BPCL to<br />
the extent <strong>of</strong> 96% only. Hence loading <strong>of</strong> 4% <strong>of</strong> Service Tax rate shall be considered for<br />
Price evaluation.<br />
BPCL shall claim CENVAT benefits on Excise Duty, Kerala VAT /CVD/SAD/Service Tax as<br />
well as the cess applicable and accordingly Excise Duty /VAT/CVD/SAD/Service Tax, Cess<br />
shall be considered and necessary credit shall be given for evaluation and comparison <strong>of</strong><br />
bids. Credit shall be taken during evaluation for 20% <strong>of</strong> Kerala VAT rate, 96% <strong>of</strong> Service Tax<br />
rate and full amount for other Cenvatable taxes and duties.<br />
Excise Duty, Central Sales Tax, Kerala VAT & Service Tax shall not be included in the<br />
quoted prices and shall be payable extra at actuals. Further, the amount <strong>of</strong> Excise Duty,<br />
Service Tax, Central Sales Tax, KVAT shall only be payable against submission <strong>of</strong><br />
supporting documents/Cenvatable/Vatable invoices subject to maximum amount quoted in<br />
the <strong>of</strong>fer and in case <strong>of</strong> non-submission, will not be paid.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 9 <strong>of</strong> 22<br />
Page 80 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
(v)<br />
(vi)<br />
(vii)<br />
(viii)<br />
Non Cenvatable Excise Duty, if any is to be included in quoted prices & no variation on any<br />
account (including statutory variation) shall be paid by Owner.<br />
Any errors <strong>of</strong> interpretation <strong>of</strong> applicability <strong>of</strong> taxes/duties by bidder shall be to Bidder’s<br />
account.<br />
All New taxes/duties/cess/levies notified after the last date <strong>of</strong> submission <strong>of</strong> bid (final bid due<br />
date) but within contractual delivery/ completion period, shall be to Owner’s account.<br />
The bidder shall be required to furnish details <strong>of</strong> any special dispensation regarding<br />
concessional/ exempted taxes/ duties.<br />
9.0 PRICE REDUCTION SCHEDULE TOWARDS DELAY IN DELIVERY:<br />
i. For Indigenous Vendor:<br />
a) In case item involving supply and site work:-<br />
Price Reduction Schedule towards delay in delivery for domestic bidder shall be applicable as per<br />
clause no. 9.0 <strong>of</strong> GPC Indigenous <strong>of</strong> RFQ subject to following modification:<br />
“Price Reduction schedule for (Supply + Site work) shall be @ 0.5% <strong>of</strong> value <strong>of</strong> total order value<br />
(TOV) <strong>of</strong> per week <strong>of</strong> delay or part there<strong>of</strong> subject to maximum <strong>of</strong> 5% total order value (TOV)”.<br />
b) In case item involving only supply:-<br />
Delayed Delivery shall be as per clause 9 <strong>of</strong> GPC (For Indigenous materials & equipments).<br />
ii. For Foreign Vendor:<br />
a) In case item involving supply and site work:-<br />
Price Reduction Schedule (Supply + Site work) towards delay in delivery for foreign bidder shall be<br />
applicable as per clause no. 17 <strong>of</strong> GPC Import <strong>of</strong> RFQ subject to following modification:<br />
“Imports, for any delay in delivery <strong>of</strong> equipments / materials or part there<strong>of</strong> beyond the delivery<br />
date stipulated, the vendor shall be liable to pay, compensation at 0. 5% <strong>of</strong> the total FOB Value <strong>of</strong><br />
order per week <strong>of</strong> delay or part there<strong>of</strong> subject to maximum <strong>of</strong> 5% <strong>of</strong> the total FOB Value <strong>of</strong><br />
order”.<br />
b) In case item involving only supply:-<br />
Delayed Delivery shall be as per clause 17 <strong>of</strong> GPC (For Foreign materials & equipments).<br />
iii.<br />
Wherever the supply period and site work are indicated as two separate periods and<br />
notice <strong>of</strong> site readiness is required for site work, intervening period, if any shall be<br />
excluded, while calculating the price schedule for delay.”<br />
10.0 Guarantee / Warranty Period :-<br />
i) For Indigenous Vendor:<br />
a) In case item involving supply and site work:-<br />
In partial modification <strong>of</strong> the terms specified in clause 30 <strong>of</strong> GPC –12 months from the date <strong>of</strong><br />
handing over <strong>of</strong> duly completed plant/equipment/system as per the contract at site to the owner.<br />
b) In case item involving only supply:-<br />
Performance Guarantee shall be as per clause 30 <strong>of</strong> GPC (For Indigenous materials &<br />
equipments).<br />
ii) For Foreign Vendor:<br />
a. In case item involving supply and site work:-<br />
In partial modification <strong>of</strong> the terms specified in clause 26 <strong>of</strong> GPC –12 months from the date <strong>of</strong><br />
handing over <strong>of</strong> duly completed plant/equipment/system as per the contract at site to the owner.<br />
b. In case item involving only supply:-<br />
Performance Guarantee shall be as per clause 26 <strong>of</strong> GPC (For Foreign materials & equipments).<br />
SECTION-C: COMMERCIAL LOADING OF OFFERS IN CASE OF DEVIATIONS<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 10 <strong>of</strong> 22<br />
Page 81 <strong>of</strong> 143
11.0 BASIS OF LOADING:<br />
BPCL-KR<br />
Job: A307<br />
The Foreign Bids shall be loaded on FOB Port <strong>of</strong> Exit prices and the Indian Bids shall be loaded on<br />
FOT Despatch Point prices.<br />
12.0 PAYMENT TERMS:<br />
i. Any differential payment terms <strong>of</strong>fered by an Indian supplier as against the terms specified in the<br />
RFQ/ GPC shall be loaded @ 15% (simple interest) per annum for the applicable period as under:<br />
Drawing approval : 80% <strong>of</strong> the delivery period<br />
Sub-ordering <strong>of</strong> raw materials : 75% <strong>of</strong> the delivery period<br />
Receipt <strong>of</strong> raw material at vendor’s works : 50% <strong>of</strong> the delivery period<br />
Final 10% also against dispatch documents : one month<br />
Period <strong>of</strong> any other stage shall be suitably decided at the time <strong>of</strong> evaluation.<br />
ii.<br />
iii.<br />
In cases like turnkey jobs, to derive the delivery period <strong>of</strong> supply items, the total period <strong>of</strong> turnkey<br />
jobs shall be split into delivery period <strong>of</strong> supplies & site work period in the ratio <strong>of</strong> 70:30 for loading <strong>of</strong><br />
differential payment terms for the supply periods as defined above.<br />
Foreign suppliers shall not be permitted to <strong>of</strong>fer differential payment terms as against the terms<br />
specified in the RFQ/ GPC and in case they insist, their <strong>of</strong>fer shall be rejected.<br />
Advance along with FOA/ PO will not be allowed. If a supplier insists for advance payment along<br />
with FOA/PO, his <strong>of</strong>fer shall be rejected.<br />
13.0 PERFORMANCE BANK GUARANTEE (PBG):<br />
i. Performance Bank Guarantee shall be required in all cases <strong>of</strong> supplies <strong>of</strong> all values. In case a<br />
supplier <strong>of</strong>fers to give a PBG for less than 10% <strong>of</strong> order value, or for a lesser period than what is<br />
provided in GPC, loading shall be done for the differential amount and/ or the differential period. For<br />
differential period/ amount, the following example will amplify the methodology <strong>of</strong> loading (if GPC<br />
specifies 10% PBG for 18 months + 3 months claim period = Total 21 months):<br />
ii.<br />
iii.<br />
For differential period:<br />
Period <strong>of</strong>fered by Bidder<br />
Loading<br />
10% for 21 months - No loading<br />
10% for 18 months - 10% x 3/21 = 1.43%<br />
10% for 12 months - 10% x 9/21 = 4.29%<br />
10% for 6 months - 10% x 15/21 = 7.14%<br />
For differential Amount:<br />
Other than 10%: To be loaded by percentage by which PBG is short <strong>of</strong> 10%.<br />
In case, bidder does not agree to submit the PBG, 10% payment shall be deducted and withheld till<br />
the guarantee period.<br />
In case, Bidder does not agree to submit the PBG or agree for deduction as per Cl. 13.(ii) above, the<br />
<strong>of</strong>fer shall be liable for rejection.<br />
14.0 DELAYED DELIVERIES:<br />
i. For Supply Only: [considering 0.5% un-delivered order value (UDOV) ~ 5% total order value<br />
(TOV)]<br />
ii.<br />
In case a Supplier does not accept the delayed delivery clause and/or takes any deviation (indicates<br />
Penalty clause/Liquidated damages in place <strong>of</strong> Price Reduction Clause) or takes exception to the<br />
percentage rate mentioned in GPC, the <strong>of</strong>fer <strong>of</strong> such supplier(s) shall be loaded as under:<br />
0.5% UDOV to 5%TOV : No loading<br />
0.5% UDOV to 5% UDOV : 5%<br />
0.5% UDOV to less than 5% TOV : Differential between the <strong>of</strong>fered %age and 5%<br />
Any other deviation/Liquidated : 5%<br />
Damages/ penalty or non acceptance<br />
<strong>of</strong> price reduction schedule<br />
For Supply + Site Work: [considering 0.5% total order value (TOV) ~ 5% total order value<br />
(TOV)]<br />
0.5% TOV to 5%TOV : No loading<br />
0.5% UDOV to 5%TOV : 5% loading<br />
0.5% TOV to less than 5% TOV : Differential between the Offered % and 5%<br />
Any other deviation/Liquidated : 5%<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 11 <strong>of</strong> 22<br />
Page 82 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
Damages/ penalty or non acceptance<br />
<strong>of</strong> price reduction schedule<br />
15.0 PRICE VARIATION:<br />
Suppliers must quote firm & fixed prices unless price variation is specified in the RFQ. Where price<br />
variation is permitted as per RFQ, the loading thereto shall be as follows:<br />
a) Firm Price No loading<br />
b) In case <strong>of</strong> Price Variation formula with ceiling Loading by ceiling percentage <strong>of</strong>fered.<br />
c) No ceiling on the formula specified (This<br />
loading<br />
shall be done only after putting efforts with<br />
Supplier to indicate ceiling and obtaining<br />
BPCL’s approval)<br />
d) No formula and no ceiling specified by<br />
Supplier<br />
(This shall be resorted to only after putting<br />
efforts with Supplier and obtaining BPCL’s<br />
approval)<br />
1.5 times the maximum ceiling specified by<br />
other Suppliers. In case all other Suppliers<br />
have quoted firm prices then @ 1.25% for<br />
every month <strong>of</strong> quoted delivery period to be<br />
taken as ceiling.<br />
Offer may be rejected.<br />
16.0 FREIGHT CHARGES:<br />
i. Indian Suppliers shall quote firm freight charges up to destination by road transport for all cases until<br />
unless specified otherwise in the RFQ documents.<br />
17.0 INDIAN TAXES/ DUTIES:<br />
In case a supplier states that taxes/duties are not applicable at present and will be charged as<br />
applicable at the time <strong>of</strong> delivery then his bid shall be loaded by the maximum rate <strong>of</strong> taxes/duties<br />
applicable.<br />
18.0 DELIVERY/COMPLETION PERIOD:<br />
The required delivery / completion period will be stipulated in the RFQ and the bids with longer than<br />
required delivery shall be liable for rejection.<br />
19.0 UTILITIES:<br />
Cost loading in respect <strong>of</strong> utilities etc. will be considered as mentioned in RFQ documents.<br />
20.0 FOREIGN EXCHANGE RATE VARIATION/CUSTOM DUTY VARIATION FOR INDIAN BIDDERS<br />
(ON BUILT-IN IMPORT CONTENT) :<br />
i. Prices shall remain firm and fixed without any escalation except for statutory variation in customs<br />
duty rate.<br />
ii.<br />
The prices shall be firm and fixed on account <strong>of</strong> FE variation also.<br />
Indigenous bidders shall be required to quote their prices including customs duty (Merit rate)<br />
towards their built in import content. CIF content in Indian Rupees shall also be furnished by<br />
Bidders along with the merit rate <strong>of</strong> customs duty considered.<br />
iii. The statutory variation in customs duty shall be subject to the following<br />
guidelines and the supplier shall confirm the following in their bid:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
Maximum CIF value <strong>of</strong> import content shall be furnished in the bid.<br />
The material to be imported covering the above CIF value to be indicated in the bid.<br />
Any increase in price due to increase in customs duty rate beyond two-third <strong>of</strong> the quoted<br />
delivery period will be to supplier’s account. However, any decrease in price due to<br />
decrease in customs duty rate at the time <strong>of</strong> actual clearance <strong>of</strong> imported materials shall<br />
be passed on to BPCL.<br />
Variation in price due to customs duty rate will be dealt with separately after receipt <strong>of</strong><br />
materials at site against documentary evidence.<br />
21.0 VAT ON WORKS CONTRACTS/ SERVICE TAX/ SPLITTING OF ORDERS:<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 12 <strong>of</strong> 22<br />
Page 83 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
i. Wherever site work is involved, suppliers shall quote their prices inclusive <strong>of</strong> VAT on Works<br />
Contracts. The Supplier shall submit the assessment/ liability certificate from Sales Tax Authority<br />
stating the tax due on Contract/ Running bill submitted for payment for enabling BPCL to deduct<br />
the VAT on Works Contract as per the certificate, from Suppliers Invoices and remittance to tax<br />
authorities. TDS Certificate towards deduction <strong>of</strong> VAT on Works Contract shall be provided to<br />
supplier by owner. Payment to the Supplier will be released only on receipt <strong>of</strong> the aforesaid<br />
certificate. The Supplier shall submit the total tax liability certificate along with final bill. Under no<br />
circumstance, the Supplier should remit VAT on Works Contract directly to the Department. Any<br />
loss to BPCL, due to direct remittance <strong>of</strong> VAT on Works Contract by Supplier will be recovered from<br />
Supplier. BPCL shall not be responsible for any delay in payment/ non-payment <strong>of</strong> bill due to delay<br />
in submission/ non-submission <strong>of</strong> the aforesaid certificate. Order for Supply and Site Work shall not<br />
be split and only single order covering the entire scope <strong>of</strong> work on each supplier shall be placed.<br />
ii. Wherever, Service Tax is applicable, Suppliers shall quote their prices exclusive <strong>of</strong> Service Tax.<br />
Supplier shall be required to furnish Invoices towards Service Tax in order to enable BPCL to avail<br />
credit <strong>of</strong> the same. Presently BPCL is able to avail credit <strong>of</strong> 96% <strong>of</strong> the Service Tax rate only.<br />
Hence, 4% <strong>of</strong> Service Tax rate shall be loaded for price evaluation. The same is not applicable for<br />
service tax on transportation charges, since CENVAT Benefits not available.<br />
22.0 ENTRY TAX:<br />
Entry Tax is not applicable presently in the State <strong>of</strong> Kerala and Bidder’s should not include the<br />
same in their quoted rates/prices. In case Entry Tax is leviable at a later date, the same shall be<br />
borne by Owner.<br />
23.0 REJECTION CRITERIA:<br />
Bidder shall strictly comply with the technical and commercial requirements. Bid shall be considered<br />
non responsive and rejected, if bidder insists on deviations to the under mentioned provisions <strong>of</strong><br />
RFQ/Bidding document:<br />
i) Bid Security amount, Bid security validity, issuing bank and any major deviation to format <strong>of</strong><br />
Bid security. However this shall not be applicable in case Bid security is not required as per<br />
RFQ/Bidding Document.<br />
ii)<br />
iii)<br />
Advance payment along with FOA/ PO.<br />
Unless specified in the RFQ, Price variation with no formula and no ceiling.<br />
iv) Price change/implication against TQ/CQ when there is no change in scope <strong>of</strong> work,<br />
specification and terms & conditions <strong>of</strong> MR/RFQ.<br />
v) Delivery / completion schedule.<br />
vi)<br />
vii)<br />
viii)<br />
Guarantee/ Defects Liability Period<br />
Inadequate Bid Validity<br />
Performance bank Guarantee or any other bank guarantee mandatorily required against<br />
Milestone or supervision or Price Reduction Schedule (PRS)<br />
24.0 SUO-MOTO CHANGES IN PRICES:<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
Any Suo-moto reduction in price <strong>of</strong>fered by a supplier within the bid validity by way <strong>of</strong> discount or<br />
revised prices subsequent to the bid due date and which is not as a result <strong>of</strong> any change in scope <strong>of</strong><br />
supply or terms and conditions, shall not be taken into account for evaluation. However, such<br />
reduction in price shall be taken into account for ordering if such supplier happens to be the<br />
recommended supplier as per the originally quoted prices.<br />
However, in the event <strong>of</strong> any suo-moto price increase sought by a supplier subsequent to the bid<br />
due date and which is not as a result <strong>of</strong> any change in scope <strong>of</strong> supply or terms and conditions, the<br />
bid <strong>of</strong> such a supplier shall be rejected for the items in which such suo-moto increase is made.<br />
Any wrong interpretation <strong>of</strong> taxes & duties or any taxes & duties not specified in the <strong>of</strong>fer shall be<br />
borne by Bidder.<br />
25.0 PRICE IMPLICATION NOT PERMITTED:<br />
Price implications on account <strong>of</strong> technical clarifications shall not be permitted as long as<br />
BPCL/<strong>EIL</strong> do not change the specifications/ scope spelt out in the RFQ.<br />
26.0 INTEGRITY PACT:<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 13 <strong>of</strong> 22<br />
Page 84 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
For all RFQs/ enquiries <strong>of</strong> value exceeding Rs 1 (One) Crore, the bidder shall comply with the<br />
requirements <strong>of</strong> the Integrity Pact (IP) and Integrity Pact <strong>of</strong> RFQ/Bidding document shall be<br />
accepted and Bidder must submit the same duly signed & stamped along with their bid. Failure to<br />
submit the Integrity Pact shall lead to outright rejection <strong>of</strong> Bid.<br />
Bidding shall be through E-tendering methodology as per Enclosed “INSTRUCTIONS TO<br />
BIDDERS FOR E-TENDERING”.<br />
SECTION-D: SPECIAL CONDITIONS.<br />
27.0 DELIVERY SCHEDULE/ COMPLETION PERIOD:<br />
i. All goods under the scope <strong>of</strong> the Supplier shall be delivered as per delivery schedule/<br />
completion period specified in Request for Quotation (RFQ) and no variation shall be permitted.<br />
ii.<br />
iii.<br />
(iv.)<br />
(V.)<br />
(VI.)<br />
Failing to meet the delivery schedule/ completion period will be subject to price reduction and/or<br />
other remedies available to the purchaser in RFQ documents.<br />
Price Reduction Schedule (PRS) shall be applicable as per Clause 9.0 <strong>of</strong> GPC (Indian) & clause no.<br />
17 <strong>of</strong> GPC (Imported) and mentioned in RFQ Covering letter.<br />
The delivery schedule/ completion period shall be reckoned from the date <strong>of</strong> Fax <strong>of</strong> Acceptance.<br />
For Indian Bidder date <strong>of</strong> LR/GR shall be considered as date <strong>of</strong> delivery or date <strong>of</strong> receipt <strong>of</strong> material<br />
at site shall be the date <strong>of</strong> delivery as specified in RFQ/FOA/PO. For Foreign Bidder date <strong>of</strong> clean<br />
bill <strong>of</strong> Lading shall be considered as date <strong>of</strong> Delivery.<br />
In case <strong>of</strong> foreign bidder quoted FOB Port <strong>of</strong> Exit prices, shall be inclusive <strong>of</strong> all charges inclusive <strong>of</strong><br />
all applicable taxes & duties, applicable upto FOB port <strong>of</strong> exit.<br />
28.0 DESPATCH INSTRUCTIONS FOR INDIGENOUS SUPPLIES:<br />
i. Supplier shall obtain despatch clearance from the purchaser prior to despatch.<br />
ii.<br />
Following despatch documents are required to be submitted by the Indigenous supplier immediately<br />
after shipment is made.<br />
‣ Commercial Invoice<br />
‣ Dispatch instructions/ clearance by Purchaser/Consultant.<br />
‣ Inspection Release Note by Third Party Inspection Agency/ Purchaser/ Consultant.<br />
‣ LR/ GR<br />
‣ Packing List<br />
‣ Test Certificates (NDT reports, MTC, etc. as per MR)<br />
‣ Certificate <strong>of</strong> Measurement and Weight<br />
‣ List <strong>of</strong> documents as specified in Vendor Data Requirement in Material Requisition &<br />
counter signed & stamped by <strong>EIL</strong>.<br />
29.0 NEW / ADDITIONAL TAXES & DUTIES (Applicable for Indian Bidder):<br />
i. Within the contractual delivery period, if any new taxes and/or duties come into force the same will<br />
be reimbursed to bidder against documentary evidence. However any new or additional taxes/<br />
duties imposed after contractual delivery shall be to borne by seller.<br />
ii.<br />
iii.<br />
iv.<br />
All necessary taxes & duties registration, if required for carrying out the site activities shall be done<br />
by the bidder and cost towards the same shall be included in quoted prices.<br />
The statutory variations on Customs duty (rate) considered on above CIF value <strong>of</strong> built – in import<br />
content, within contractual delivery period shall be to Employer’s account against submission <strong>of</strong> the<br />
documentary evidence. However, any increase in the rate <strong>of</strong> Customs duty beyond the contractual<br />
completion period shall be to bidder’s account. In case <strong>of</strong> wrong classification, no variation<br />
including statutory variation <strong>of</strong> Customs Duty will be payable extra. Any decrease in the rate <strong>of</strong><br />
Customs duty shall be passed on to the Employer.<br />
The statutory variations on Excise rate and amount <strong>of</strong> Excise Duty, CST with concessional form &<br />
VAT without concessional form, which will be payable on the finished goods and Cenvatable<br />
Service Tax, as applicable, within the contractual delivery period shall be to Employer’s account<br />
against submission <strong>of</strong> the documentary evidence. Any increase in the rate <strong>of</strong> these taxes and<br />
duties beyond the contractual completion period shall be to bidder’s account. However, any<br />
decrease in the rate <strong>of</strong> taxes & duties shall be passed on to the Employer.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 14 <strong>of</strong> 22<br />
Page 85 <strong>of</strong> 143
A307_SIB Rev.4 dtd: 22.02.2012 Page 15 <strong>of</strong> 22<br />
BPCL-KR<br />
Job: A307<br />
v. Works Contract Tax & service tax on transportation, if applicable, shall be included in the quoted<br />
prices and no variation including statutory variations shall be payable by BPCL.<br />
30.0 RECOVERY OF CUSTOM DUTY, EXCISE DUTY AND SALES TAX:<br />
In case <strong>of</strong> Indian Bidders, if the Statutory Variation entitles the employer to recover the amount<br />
(irrespective <strong>of</strong> contractual delivery) such amount will be recovered from any bill <strong>of</strong> the Supplier<br />
immediately on enforcement <strong>of</strong> such variation under intimation to the Supplier.<br />
31.0 GOVERNING LAW:<br />
Laws <strong>of</strong> India will govern the Agreement. All matters relating to this contract are subject to the<br />
exclusive jurisdiction <strong>of</strong> the Courts situated in Kochi, Ambalamugal (District), Kerala (India).<br />
32.0 PURCHASER’S RIGHTS AND REMEDIES:<br />
Without prejudice to PURCHASER’s right and remedies under Agreement, if SUPPLIER fails to<br />
commence delivery as per agreed schedule and/or in reasonable opinion <strong>of</strong> the PURCHASER,<br />
SUPPLIER is not in a position to makeup the delay to meet the intended purpose, the PURCHASER<br />
may terminate the AGREEMENT in full or part at SUPPLIER’s default and may get supplies from<br />
other sources at SUPPLIER’s risk and cost.<br />
33.0 DEDUCTION AT SOURCE:<br />
i. Purchaser will release the payment to the Supplier after effecting deductions as per applicable law in<br />
force. Purchaser will release the payment to the Supplier after effecting deductions as per applicable<br />
law in force. Owner shall deduct VAT on Works Contract as applicable & shall furnish TDS certificate<br />
to supplier.<br />
ii.<br />
Purchaser will release payments to the Supplier after <strong>of</strong>fsetting all dues to the Purchaser payable<br />
by the Supplier under the Contract.<br />
34.0 STATUTORY APPROVAL RELATED WITH SUPPLIES / WORKS:<br />
35.0 LIEN:<br />
Approval from any authority (i.e. Inspector <strong>of</strong> Boiler, Electrical Inspector, and Municipal Corporation<br />
<strong>of</strong> Greater Kochi (MCGK) etc.) required as per statutory rules and regulations <strong>of</strong> Central/ State<br />
Government shall be the responsibility <strong>of</strong> Contractor agency.<br />
The application on behalf <strong>of</strong> the OWNER for submission to relevant authorities along with copies <strong>of</strong><br />
required certificate complete in all respects shall be prepared and submitted by the Contractor<br />
agency well ahead <strong>of</strong> time so that the actual construction/ commissioning <strong>of</strong> the work is not delayed<br />
for want <strong>of</strong> the approval/ inspection by concerned authorities. The Contractor agency shall arrange<br />
the inspection <strong>of</strong> the works by the authorities and necessary coordination and liaison work in this<br />
respect shall be the responsibility <strong>of</strong> the Contractor agency. Reimbursement by the OWNER <strong>of</strong> the<br />
statutory fees payable by Contractor agency (as per advance approval <strong>of</strong> OWNER) may be provided<br />
for, subject to submission <strong>of</strong> receipt.<br />
The Contractor agency shall carry out any change/ addition required to meet the requirements <strong>of</strong> the<br />
statutory authorities, within the quoted rates. The inspection and acceptance <strong>of</strong> the work by statutory<br />
authorities shall be the responsibility <strong>of</strong> the Contractor agency.<br />
List <strong>of</strong> all documents, drawings, forms, affidavits etc required for the approvals shall be submitted by<br />
the contractor agency.<br />
Supplier shall ensure that the Scope <strong>of</strong> Supply supplied under the Agreement shall be free from any<br />
claims <strong>of</strong> title/liens from any third party. In the event <strong>of</strong> such claims by any party, Supplier shall at<br />
his own cost defend, indemnify and hold harmless Purchaser or its authorised representative from<br />
such disputes <strong>of</strong> title/liens, costs, consequences etc.<br />
36.0 LIMITATION OF LIABILITY:<br />
Notwithstanding anything contrary contained herein, the aggregate total liability <strong>of</strong> Seller under the<br />
Agreement or otherwise shall be limited to 100% <strong>of</strong> Agreement/ Order price. However, neither party<br />
shall be liable to the other party for any indirect and consequential damages, loss <strong>of</strong> pr<strong>of</strong>its or loss <strong>of</strong><br />
production.<br />
Page 86 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
SECTION-E: GENERAL INSTRUCTIONS<br />
37.0 GENERAL: Bidders shall submit their Bids in following manner & containing the listed inputs, duly<br />
filled-in, stamped & signed by authorized signatory <strong>of</strong> Bidder holding Power <strong>of</strong> Attorney, as a<br />
minimum requirement:<br />
a) PART-I: UNPRICED OFFER<br />
A. All technical specifications as per requirement <strong>of</strong> MR.<br />
B. Agreed Terms & Conditions duly filled in.<br />
C. Terms & Conditions for Supervision <strong>of</strong> Erection/Testing/Commissioning, if applicable<br />
D. Terms & Conditions for Site Work, if applicable<br />
E. Copy <strong>of</strong> Registration with <strong>EIL</strong>, if applicable<br />
F. Copy <strong>of</strong> MOU/ MOM, if any, signed with <strong>EIL</strong> and referred in <strong>of</strong>fer.<br />
G. Integrity Pact, duly filled-in, stamped & signed on each page (if applicable).<br />
H. Audited Financial Report <strong>of</strong> latest preceding Financial year.<br />
I. Deviation sheet, if any.<br />
J. Price Schedule with prices blanked out but “Quoted/ Not quoted” to be mentioned & its<br />
relevant enclosures, duly filled-in, stamped & signed on each page.<br />
b) PART-II: PRICED OFFER<br />
A. Price Schedule with prices filled in.<br />
B. Statement that all specifications and terms & conditions are as per un-priced part <strong>of</strong> <strong>of</strong>fer.<br />
c) Bidders in their own interest are requested to register on e- tendering <strong>portal</strong> and<br />
upload/submit their bid well in time. Bidders should avoid the last hour rush to the website<br />
for registration <strong>of</strong> user id & password, enabling <strong>of</strong> user id and mapping <strong>of</strong> digital signature<br />
serial number etc. since this exercise require activities from <strong>EIL</strong> & M/s Anatares System<br />
(Service Provider) and needs time. In the event <strong>of</strong> failure in bidder’s connectivity with<br />
<strong>EIL</strong>/Service Provider during the last few hours, bidder is likely to miss the deadline for bid<br />
submission. Due date extension request due to aforesaid reasons may not be entertained.<br />
Since the bidders are already registered at ASP e-tendering <strong>portal</strong>, bidders are advised to<br />
furnish the details <strong>of</strong> Digital Signature (serial no.) by email within one week <strong>of</strong> receipt <strong>of</strong><br />
intimation <strong>of</strong> issuance <strong>of</strong> RFQ to save time and avoid mapping <strong>of</strong> Digital Signature details to<br />
the bidders User ID at the bid uploading stage.<br />
d) Request for extension or any queries or issues related to difficulties in<br />
uploading/downloading bids, if any, received from any with less than four working days prior<br />
to bid due date shall generally be ignored, since there will not be adequate time for proper<br />
communication with Client and other Bidders.<br />
e) Bidders to refer Instruction to Bidders for E-<strong>Tender</strong>ing provided in the RFQ. Bidder shall<br />
download the Price Schedule in *.xls format from <strong>EIL</strong>’s Authorised Service Provider’s<br />
Electronic system / <strong>portal</strong> at www.tenderwizard.com/eil only, and use the same for uploading<br />
their Price Bids as per the Instruction provided.<br />
Note:<br />
Bidding currency shall be Indian Rupees for supplies dispatched from Indian & and USD/EURO for<br />
supplies dispatched from foreign.<br />
38.0 FRAUDULENT PRACTICES:<br />
The OWNER requires that Bidders/ Contractors observe the highest standard <strong>of</strong> ethics during<br />
the award/ execution <strong>of</strong> Contract. "Fraudulent Practice" means a misrepresentation <strong>of</strong> facts in order<br />
to influence the award <strong>of</strong> a Contract to the detriment <strong>of</strong> the Owner, and includes collusive practice<br />
among bidders (prior to or after bid submission) designed to establish bid prices at artificial noncompetitive<br />
levels and to deprive the Owner <strong>of</strong> the benefits <strong>of</strong> free and open competition.<br />
a) The OWNER will reject a proposal for award if it determines that the bidder recommended for<br />
award has engaged in fraudulent practices in competing for the Contract in question.<br />
Bidder is required to furnish the complete and correct information/ documents required for<br />
evaluation <strong>of</strong> their bids. If the information/ documents forming basis <strong>of</strong> evaluation is found to be<br />
false/ forged, the same shall be considered adequate ground for rejection <strong>of</strong> bids and forfeiture<br />
<strong>of</strong> Earnest Money Deposit.<br />
b) In case, the information/ document furnished by the Bidder/ Contractor forming basis <strong>of</strong><br />
evaluation <strong>of</strong> his bid is found to be false/ forged after the award <strong>of</strong> the contract, Owner shall<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 16 <strong>of</strong> 22<br />
Page 87 <strong>of</strong> 143
A307_SIB Rev.4 dtd: 22.02.2012 Page 17 <strong>of</strong> 22<br />
BPCL-KR<br />
Job: A307<br />
have full right to terminate the contract and get the remaining job executed at the risk & cost <strong>of</strong><br />
such Bidder/ Contractor without any prejudice to other rights available to Owner under the<br />
contract such as forfeiture <strong>of</strong> CPBG/ Security Deposit, withholding <strong>of</strong> payment etc.<br />
c) In case, this issue <strong>of</strong> submission <strong>of</strong> false documents comes to the notice after execution <strong>of</strong><br />
work, Owner shall have full right to forfeit any amount due to the Bidder/ Contractor along with<br />
forfeiture <strong>of</strong> CPBG/ Security Deposit furnished by the bidder/ contractor.<br />
d) Further, such bidder/ contractor shall be put on Blacklist/ Holiday/ Negative List <strong>of</strong> OWNER/<strong>EIL</strong><br />
debarring them from future business with Owner & <strong>EIL</strong> for a time period, as per the prevailing<br />
policy <strong>of</strong> OWNER & <strong>EIL</strong>.<br />
39.0 ONE BID PER BIDDER:<br />
a. A Bidder shall submit only one bid in the same bidding process. A Bidder who submits or<br />
participates in more than one bid will cause all the proposals in which the bidder has<br />
participated to be disqualified.<br />
b. Alternative price bids are not acceptable.<br />
40.0 LANGUAGE OF BID:<br />
a) The Bid prepared by the bidder, all correspondence/drawings and documents relating to the<br />
bid exchanged by the bidder with the Owner/Consultant shall be in English Language alone<br />
provided that any document furnished by the bidder may be written in another language so<br />
long as accompanied by an English translation, in which case, for the purpose <strong>of</strong> interpretation<br />
<strong>of</strong> the bid, the English translation shall govern.<br />
b) In the event <strong>of</strong> submission <strong>of</strong> any document/ certificate by the Bidder in a language other than<br />
English, the English translation <strong>of</strong> the same duly authenticated by Chamber <strong>of</strong> Commerce <strong>of</strong><br />
Bidder’s country shall be submitted by the Bidder. Metric measurement system shall be<br />
applied.<br />
41.0 EARNEST MONEY DEPOSIT:<br />
Bidder shall furnish, as part <strong>of</strong> its Bid, EMD for an amount as indicated in the NIT/ IFB. If the<br />
Bidder is unable to submit Bid Document Fee & EMD in original within the due date & time, then<br />
bidder shall submit the original Bid Document Fee & EMD within 7 days from the date <strong>of</strong> unpriced<br />
bid opening, provided copy <strong>of</strong> the same have been uploaded on E-<strong>Tender</strong>ing Website. In case<br />
the bidder fails to submit the same in original within 7 days, then their bid shall be rejected,<br />
irrespective <strong>of</strong> their status/ ranking in tender and notwithstanding the fact that a copy <strong>of</strong> Bid<br />
Document Fee & EMD was earlier uploaded by the bidder. OWNER shall not pay any interest on<br />
EMD furnished.<br />
The EMD shall be in favour <strong>of</strong> BPCL and shall be acceptable in the form <strong>of</strong> Crossed Demand Draft<br />
or Bank Guarantee in the prescribed pro-forma.<br />
The Bank Guarantees/DD for EMD shall be issued by any Scheduled Commercial Bank (other than<br />
co-operative Bank) in India or any Indian Branch <strong>of</strong> Foreign Bank and same shall be as per the<br />
format given in this bidding document. Swift Message or Cash or Cheque in lieu EMD shall not be<br />
acceptable.<br />
The bank guarantee for submission <strong>of</strong> EMD shall be valid as period mentioned in EMD / Bid<br />
Security format or elsewhere mentioned in Bid Document / RFQ.<br />
EMD/ Bid securities <strong>of</strong> unsuccessful bidders will be returned upon award <strong>of</strong> Contract. However,<br />
EMD <strong>of</strong> the successful Bidder will be returned upon the Bidder's acceptance <strong>of</strong> PO/ signing the<br />
Contract and furnishing the PBG.<br />
The EMD may be forfeited:<br />
If a Bidder withdraws its bid during the period <strong>of</strong> Bid Validity or does any breach <strong>of</strong><br />
tendering terms and conditions, or<br />
<br />
<br />
If a bidder modifies his bid on his own.<br />
In case <strong>of</strong> a successful Bidder, if the Bidder fails, within the specified period:<br />
i. To submit the order acceptance.<br />
ii. To furnish the PBG.<br />
42.0 MODIFICATION AND WITHDRAWAL OF BIDS:<br />
a) The Bidder may modify / withdraw its Bid prior to the due date prescribed for submission <strong>of</strong><br />
Bids.<br />
Page 88 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
b) No bid shall be modified subsequent to the deadline for submission <strong>of</strong> bids.<br />
c) No bid shall be allowed to be withdrawn in the interval between the deadline for submission<br />
<strong>of</strong> bids and the expiration <strong>of</strong> the period <strong>of</strong> bid validity specified by the bidder. Withdrawal <strong>of</strong> a<br />
bid during this interval shall result in the forfeiture <strong>of</strong> bidder’s bid security.<br />
43.0 EXAMINATION OF BIDS AND DETERMINATION OF RESPONSIVENESS:<br />
a. The Owner/<strong>EIL</strong> will examine the bids to determine whether they are complete, whether any<br />
computational errors have been made, whether the documents have been properly signed,<br />
and whether the bids are generally in order.<br />
f) Prior to the detailed evaluation, the Owner/<strong>EIL</strong> will determine whether each bid is <strong>of</strong><br />
acceptable quality, is generally complete and is responsive to the RFQ Documents. For the<br />
purposes <strong>of</strong> this determination, a responsive bid is one that conforms to all the terms,<br />
conditions and specifications <strong>of</strong> the RFQ Documents without deviations, objections,<br />
conditionality or reservations.<br />
c. Bidder shall not be allowed to submit any Price Implication or Revised Price after submission<br />
<strong>of</strong> Bid, unless there is change in the stipulations <strong>of</strong> the RFQ Document and such changes are<br />
incorporated through an Amendment. In case Exceptions and Deviations submitted by Bidder<br />
along with Bid are not considered as acceptable and no Amendment is issued, then in such a<br />
case the Bidders would be required to withdraw such Exceptions/Deviations in favour <strong>of</strong><br />
stipulations <strong>of</strong> the RFQ document and Bidders would not be eligible for submission <strong>of</strong> Price<br />
Implication/Revised Price, failing which such Bid(s) shall be considered as non responsive<br />
and rejected.<br />
d. The Owner/<strong>EIL</strong> determination <strong>of</strong> a bid’s responsiveness is to be based on the contents <strong>of</strong> the<br />
bid itself without recourse to extrinsic evidence. If a bid is not responsive, it will be rejected by<br />
the Owner/<strong>EIL</strong>, and may not subsequently be made responsive by the bidder by correction <strong>of</strong><br />
the nonconformity.<br />
44.0 OWNER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY BID:<br />
The Owner/<strong>EIL</strong> reserves the right to accept or reject any bid, and to annul the bidding process and<br />
reject all bids at any time prior to award <strong>of</strong> the order without thereby incurring any liability to the<br />
affected bidder or bidders or any obligations to inform the affected bidder or bidders <strong>of</strong> the ground<br />
for Owner/<strong>EIL</strong>’s action.<br />
45.0 NOTIFICATION OF AWARD:<br />
g) Prior to the expiration <strong>of</strong> period <strong>of</strong> bid validity Owner /<strong>EIL</strong> will notify the successful bidder in writing<br />
by fax/e-mail to be confirmed in writing, that his bid has been accepted. The notification <strong>of</strong> award/<br />
Fax <strong>of</strong> Acceptance will constitute the formation <strong>of</strong> the Order.<br />
h) The Delivery Schedule shall commence from the date <strong>of</strong> notification <strong>of</strong> award/ Fax <strong>of</strong> Acceptance<br />
(FOA).<br />
i) Award <strong>of</strong> Contract/Order will be by issuing Fax <strong>of</strong> Acceptance (FOA) <strong>of</strong> your bid. FOA will contain<br />
price, delivery and other salient terms <strong>of</strong> bid and RFQ Document.<br />
Bidder will be required to confirm receipt <strong>of</strong> the same by returning “Copy <strong>of</strong> the FOA” duly signed<br />
and stamped by the bidder as a token <strong>of</strong> acknowledgement to Owner and <strong>EIL</strong>. On receipt <strong>of</strong><br />
acknowledgement without any deviation/ condition, detail Purchase Order/ Contract will be issued<br />
in quadruplicate. Three copies <strong>of</strong> the same without any condition/ deviation will be returned duly<br />
signed and stamped by the bidder as a token <strong>of</strong> acknowledgement to Owner and <strong>EIL</strong>.<br />
46.0 WAIVER OR TRANSFER OF THE AGREEMENT:<br />
The successful bidder shall not waive the Agreement or transfer it to third parties, whether in part<br />
or in whole, nor waive any interest that is included in the Agreement without the prior written<br />
permission <strong>of</strong> the Owner.<br />
47.0 T&C FOR FOREIGN SUPPLIERS OPERATED THROUGH THEIR INDIAN OFFICE /<br />
SUBSIDIARIES:<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 18 <strong>of</strong> 22<br />
Page 89 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
I. The parent company shall issue an authorization from the authorized signatory like CEO, CFO, CS<br />
to confirm their authorization to the subsidiary to manufacture & supply the equipments.<br />
II.<br />
III.<br />
The parent company shall furnish a back-up guarantee duly signed by above signatory for the<br />
performance <strong>of</strong> the equipment.<br />
The order shall be placed on Indian subsidiary and the payment shall be released to Indian<br />
subsidiary.<br />
IV. Indian subsidiary shall be a manufacturing company in the same product & not a liaison /<br />
representative <strong>of</strong>fice.<br />
V. Bidder to submit bipartite agreement between parent & subsidiary to ensure experience &<br />
compliance to contract.<br />
VI.<br />
All critical components / parts to be supplied by parent company only which is enlisted with <strong>EIL</strong>.<br />
48.0 TAX RESIDENCY CERTIFICATE (TRC) FORMAT FOR FOREIGN BIDDER:<br />
Foreign Bidder shall submit Tax Residency Certificate (TRC) duly filled in detailed format enclosed<br />
with RFQ Document.<br />
49.0 REQUIREMENT OF EMPLOYMENT VISA FOR FOREIGN NATIONALS:<br />
i) All Foreign nationals coming to India for execution <strong>of</strong> Projects/ Contracts will have to apply for<br />
Employment Visa only and that grant <strong>of</strong> Employment Visa would be subject to strict adherence<br />
<strong>of</strong> following norms:<br />
a. Employment Visa is granted only for the skilled and qualified pr<strong>of</strong>essionals or to a person who is<br />
being engaged or appointed by a Company, Organization, Industry or Undertaking etc. in India<br />
on contract or employment basis at a senior level, skilled position such as technical expert, senior<br />
executive or in managerial position etc.<br />
b. Request for Employment Visa for jobs for which large number <strong>of</strong> qualified Indians are available, is<br />
not considered.<br />
c. Under no circumstances an Employment Visa is granted for routine, ordinary secretarial/ clerical<br />
jobs.<br />
ii) Suppliers are advised in their own interest to check latest Visa rules from Indian Embassy/ High<br />
Commission in their country in case Foreign nationals are required to be deputed to India during<br />
execution <strong>of</strong> the Contract.<br />
50.0 Order <strong>of</strong> Precedence <strong>of</strong> Commercial Documents:<br />
In case <strong>of</strong> an irreconcilable conflict between RFQ, Special Instructions to Bidders & General<br />
Purchase Conditions (GPC), the following shall prevail to the extent <strong>of</strong> such irreconcilable conflict in<br />
order <strong>of</strong> precedence:<br />
i) RFQ<br />
ii) Special Instructions to Bidders<br />
iii) General Purchase Conditions (GPC)<br />
SECTION-F: ADDITIONAL CLAUSES TO GPC<br />
51.0 The following is additional to Clause No. 38.0 <strong>of</strong> GPC(Indigenous):<br />
Settlement <strong>of</strong> dispute between CPSEs or CPSEs & Government Departments<br />
In the event <strong>of</strong> any dispute or difference relating to the interpretation and application <strong>of</strong> the provisions <strong>of</strong><br />
the contracts, such dispute or difference shall be referred by either party for Arbitration to the sole<br />
Arbitrator in the Department <strong>of</strong> Public Enterprises to be nominated by the Secretary to the Government<br />
<strong>of</strong> India in-charge <strong>of</strong> the Department <strong>of</strong> Public Enterprises. The Arbitration and Conciliation Act, 1996<br />
shall not be applicable to arbitration under this clause. The award <strong>of</strong> the Arbitrator shall be binding upon<br />
the parties to the dispute, provided, however, any party aggrieved by such award may make a further<br />
reference for setting aside or revision <strong>of</strong> the award to the Law Secretary, Department <strong>of</strong> Legal Affairs,<br />
Ministry <strong>of</strong> Law & Justice, Government <strong>of</strong> India. Upon such reference, the dispute shall be decided by<br />
the Law Secretary or the Special Secretary/Additional Secretary, when so authorized by the Law<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 19 <strong>of</strong> 22<br />
Page 90 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
Secretary, whose decision shall bind the Parties finally and conclusively. The Parties to the dispute will<br />
share equally the cost <strong>of</strong> arbitration as intimated by the Arbitrator.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 20 <strong>of</strong> 22<br />
Page 91 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
ANNEXURE-A<br />
INTEGRATED REFINERY EXPANSION PROJECT (IREP) OF<br />
M/s BPCL KOCHI REFINERY,<br />
KOCHI, KERALA (INDIA)<br />
(Job No. A307)<br />
TERMS & CONDITIONS FOR INDIAN SOURCED COMPONENTS / SERVICES BY FOREIGN<br />
BIDDER<br />
Foreign bidder may source components / sub-supplies and services from India, if allowed as per Material<br />
Requisition. Such sub-supplies / services shall be subject to following Commercial Terms & Conditions:<br />
1. PRICING:<br />
1.1 The Foreign bidder shall quote firm price for items being sourced from India in Indian rupees on FOT<br />
Site basis inclusive <strong>of</strong> packing, forwarding, transportation, all applicable taxes, duties & levies payable<br />
upto site.<br />
1.2 Materials if ordered against this Bidding Document are required to be dispatched on door delivery basis<br />
through a reliable bank approved Road Transport Company unless the transport company is named by<br />
the Owner.<br />
2. AWARD OF ORDER:<br />
Client may pace two separate order in this situation considering single point responsible taken care<br />
by foreign (principal) bidder under “Umbrella Contract”. However obligation <strong>of</strong> Performance Bank<br />
Guarantee & Price Reduction Schedule for complete package shall always lies with foreign<br />
(principal) Bidder.<br />
3. DELIVERY:<br />
The delivery period for items being sourced from India, shall be on FOT site basis within the delivery<br />
period specified for foreign bidder as per Terms <strong>of</strong> Bidding document.<br />
4. PRICE REDUCTION SCHEDULE FOR DELAY IN DELIVERY / SERVICES:<br />
PRS for delay in deliver / services shall be applicable on total order value including Indian sourced<br />
component / Service.<br />
5. OVERALL RESPONSIBILTY:<br />
Overall responsibility towards the contractual obligations like delivery, bid security, order execution,<br />
performance guarantee etc. including supplies being sourced from India shall be only with the<br />
foreign (principal) bidder.<br />
6. PERFORMANCE BANK GUARANTEE<br />
Foreign (principal) bidder shall submit one performance bank guarantee as per GPC for total order<br />
value including value <strong>of</strong> items source from India.<br />
7. INSPECTION<br />
i. Inspection <strong>of</strong> Item being sourced from India shall be by <strong>EIL</strong>/Owner.<br />
ii. Any change in sourcing from indigenous supplies to imported supplies and vice-versa after bid<br />
submission is not permitted.<br />
iii. Considering <strong>EIL</strong> Inspection charges, during evaluation prices <strong>of</strong> Indigenous source item shall be<br />
loaded by @1.25% <strong>of</strong> FOT Despatch Point Price price.<br />
8. PAYMENT TERMS:<br />
8.1 Indian Source supplies:<br />
100% payment along with taxes and duties will be paid against receipt & acceptance <strong>of</strong> Indian sourced<br />
goods/material at project site and on presentation <strong>of</strong> invoice suitable for availing Cenvat.<br />
8.2 Payment <strong>of</strong> Indian source supplies/Services shall be released directly to Indian counterpart against<br />
Invoices raised by Indian counterpart duly endorsed by Foreign principal for payment.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 21 <strong>of</strong> 22<br />
Page 92 <strong>of</strong> 143
BPCL-KR<br />
Job: A307<br />
8.3 The payments shall be made after Adjustment <strong>of</strong> Price Reduction Schedule.<br />
9. In case <strong>of</strong> any deviation to above requirement, loading shall be applicable as mentioned for Indian<br />
Bidder.<br />
A307_SIB Rev.4 dtd: 22.02.2012 Page 22 <strong>of</strong> 22<br />
Page 93 <strong>of</strong> 143
Page 94 <strong>of</strong> 143
Page 95 <strong>of</strong> 143
Page 96 <strong>of</strong> 143
Page 97 <strong>of</strong> 143
Page 98 <strong>of</strong> 143
Page 99 <strong>of</strong> 143
Page 100 <strong>of</strong> 143
Page 101 <strong>of</strong> 143
Page 102 <strong>of</strong> 143<br />
RFQ NO. PM/A166-000-WC-MR-3230/5014<br />
ITEM : FLANGES-CRASH MR<br />
NAME OF BIDDER: M/S __________________________________<br />
ITEM SL. NO.<br />
AS PER MR<br />
TAG NO./ ITEM CODE [ID.<br />
NO.]<br />
DESCRIPTION<br />
PRICE SCHEDULE<br />
1 FSC0127Z00419ZZZZ FLNG.SW, B-16.5, ASTM A 105, 150, RF/125AARH, 0.5 INCH, XS<br />
6.00 NOS<br />
2 FSC0147Z00510ZZZZ FLNG.SW, B-16.5, ASTM A 105, 300, RF/125AARH, 0.75 INCH, S160<br />
3.00 NOS<br />
3 FWB0147Z03089ZZZZ FLNG.WN, B-16.47-B, ASTM A 105, 300, RF/125AARH, 36.0 INCH, 20.0 MM<br />
THK<br />
3.00 NOS<br />
4 FWC0127Z01318ZZZZ FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH, 4.0 INCH, STD<br />
8.00 NOS<br />
5 FWC0127Z01602ZZZZ FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH, 8.0 INCH, S20<br />
1.00 NOS<br />
6 FWC0127Z01702ZZZZ FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH, 10.0 INCH, S20<br />
2.00 NOS<br />
7 FWC0127Z01806ZZZZ FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH, 12.0 INCH, S80<br />
4.00 NOS<br />
8 FWC0127Z02404ZZZZ FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH, 24.0 INCH, S40<br />
3.00 NOS<br />
9 FWC0147Z01518ZZZZ FLNG.WN, B-16.5, ASTM A 105, 300, RF/125AARH, 6.0 INCH, STD<br />
7.00 NOS<br />
10 FWC0147Z01618ZZZZ FLNG.WN, B-16.5, ASTM A 105, 300, RF/125AARH, 8.0 INCH, STD<br />
6.00 NOS<br />
11 FWC0147Z71518ZZZZ FLNG.WN, B-16.5, ASTM A 105, 300, RF/125AARH, H2, 6.0 INCH, STD<br />
7.00 NOS<br />
12 FNC0127Z015ZZZZZZ FLNG.SO, B-16.5, ASTM A 105, 150, RF/125AARH, 6.0 INCH<br />
2.00 NOS<br />
13 FBB0147Z030ZZZZZZ FLNG.BLIND, B-16.47-B, ASTM A 105, 300, RF/125AARH, 36.0 INCH<br />
3.00 NOS<br />
14 FBC0127Z009ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH, 2.0 INCH<br />
2.00 NOS<br />
15 FBC0127Z013ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH, 4.0 INCH<br />
2.00 NOS<br />
16 FBC0127Z015ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH, 6.0 INCH<br />
2.00 NOS<br />
17 FBC0127Z018ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH, 12.0 INCH<br />
4.00 NOS<br />
18 FBC0127Z024ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH, 24.0 INCH<br />
3.00 NOS<br />
19 FBC0147Z015ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, 6.0 INCH<br />
2.00 NOS<br />
20 FBC0147Z016ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, 8.0 INCH<br />
2.00 NOS<br />
21 FBC0147Z018ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, 12.0 INCH<br />
1.00 NOS<br />
22 FBC0147Z705ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, H2, 0.75 INCH<br />
1.00 NOS<br />
23 FBC0147Z715ZZZZZZ FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, H2, 6.0 INCH<br />
1.00 NOS<br />
24 FGK0121Z013ZZZZZZ FLNG.FIG.8, ASME-B16.48, ASTM A 105, 150, FF/125AARH, 4.0 INCH<br />
1.00 NOS<br />
25 *PS3400ZFNC34ZA1A FLNG.SO, 34.0 INCH, API 650, ASTM A 105, RF/125 AARH.,<br />
6.00 NOS<br />
Indicate firm transportation charges by GATI/XPS Cargo in percentage <strong>of</strong> quoted prices inclusive <strong>of</strong> Service Tax and Ed Cess, upto project site.<br />
QTY<br />
UOM<br />
Rate<br />
(Rs.)<br />
___________(%)<br />
Amount<br />
(Rs.)<br />
Page 1 <strong>of</strong> 2
Page 103 <strong>of</strong> 143<br />
RFQ NO. PM/A166-000-WC-MR-3230/5014<br />
ITEM : FLANGES-CRASH MR<br />
NAME OF BIDDER: M/S __________________________________<br />
DETAILS OF BUILT-IN-CIF VALUE OF IMPORT CONTENT, ITEM DETAILS OF IMPORT CONTENT AND RATES OF IMPORTS DUTY CONSIDERED AND INCLUDED IN QUOTED FOT DESPATCH POINT<br />
PRICES UNDER PRICE SCHEDULE<br />
For Item Sl .<br />
No. as per MR<br />
DESCRIPTION<br />
Description <strong>of</strong><br />
Imported Items<br />
Qty.<br />
(Unit____)<br />
*(1)<br />
CUSTOM<br />
TARIFF NO.<br />
BASIC CUSTOMS<br />
DUTY (%)<br />
(In Rs)<br />
1 2 3 4 5 6 7 8<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
i)_____<br />
ii)_____<br />
Total For Item<br />
S.No. ______<br />
TOTAL CIF VALUE<br />
NOTE:<br />
1<br />
2<br />
3<br />
4<br />
Form - “CIF/CD”, Details <strong>of</strong> Built-In CIF Value <strong>of</strong> Import Content & Custom Duty<br />
CIF value <strong>of</strong> Import<br />
Content included in<br />
quoted supply prices for<br />
column (2) Qty.<br />
Unit to be specified by the Bidder.<br />
Bidder to furnish the above details separately for each item Sl. No. <strong>of</strong> MR.<br />
Bidder to quote their prices after considering the benefit <strong>of</strong> CENVAT on CVD including Edu. Cess.<br />
The above details are for the purpose <strong>of</strong> Statutory Variation in Import Content only.<br />
RATE OF CUSTOM DUTY INCLUDED IN QUOTED SUPPLY PRICES<br />
CVD + EDU. CESS EDU. CESS ON SAD (%)<br />
TOTAL CUSTOM DUTY (%)<br />
ON CVD (%) CUSTOM<br />
DUTY (%)<br />
9<br />
Page 2 <strong>of</strong> 2
This drawing and design it covers are property <strong>of</strong> ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that it will not be reproduced, copied, exhibited nor used<br />
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. <strong>EIL</strong>-1641-515 Rev.0 A4-210x297<br />
<strong>EIL</strong> - 588 A - 216 x 279<br />
ITEM:<br />
MATERIAL REQUISITION (TOP SHEET)<br />
FLANGES- CRASH MR<br />
DOCUMENT NUMBER<br />
Issue Status (Fill 1 or 2 from below in this bracket)<br />
1. -> Entire Requisition Issued<br />
2. -> Only Revised Pages are Issued<br />
(Always quote this document number given below as reference)<br />
A166 000 WC MR 3230 C 05/11/2013 16/43<br />
JOB NO.<br />
Notes :<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
MR Category :I<br />
UNIT/<br />
AREA<br />
VENDOR CODE<br />
COST<br />
CENTRE<br />
DOC<br />
CODE<br />
SR.NO. REV DATE<br />
VENDOR NAME<br />
Material to be delivered at (job site) BPCL, KOCHI within the delivery period specified in the "Request For Quotation"<br />
(RFQ).<br />
This page is a record <strong>of</strong> all the Revisions <strong>of</strong> this Requisition.<br />
The nature <strong>of</strong> the Revision is briefly stated in the "Details" column below, the Requisition in its entirety shall be<br />
considered for contractual purposes.<br />
When a Requisition is revised, only the revised pages may be issued.<br />
When revised pages only are issued, the revised pages shall form part <strong>of</strong> the original Requisition. The original<br />
requisition alongwith the revised pages shall be considered in its entirety for contractual purposes.<br />
REV. DATE BY CHK. APPD.<br />
A<br />
B<br />
C<br />
Vendors are required to quote strictly as per technical specifications / notes stipulated in the material requisition.<br />
<strong>of</strong>fers with deviations are likely to be summarily rejected.<br />
30/10/2013<br />
04/11/2013<br />
05/11/2013<br />
BV<br />
BV<br />
BV<br />
PAS<br />
PAS<br />
PAS<br />
DETAILS<br />
ISSUE MR FOR BIDS<br />
This is a system generated approved document and does not require signature<br />
RG<br />
RG<br />
RG<br />
ORIGINATING<br />
DIVN./DEPT<br />
The<br />
REVISE & REISSUE MR FOR<br />
BIDS<br />
REVISE & REISSUE MR FOR<br />
BIDS<br />
[ ]<br />
ENGINEERS INDIA LIMITED<br />
NEW DELHI<br />
Page 104 <strong>of</strong> 143<br />
Project: IREP<br />
Client: BPCL<br />
Requisition No.<br />
A166-000-WC-MR-3230<br />
Page 1 <strong>of</strong> 4<br />
Rev<br />
C
This drawing and design it covers are property <strong>of</strong> ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that it will not be reproduced, copied, exhibited nor used<br />
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. <strong>EIL</strong>-1641-515 Rev.0 A4-210x297<br />
<strong>EIL</strong> - 588 A - 216 x 279<br />
SR. NO<br />
1<br />
2<br />
3<br />
4<br />
5<br />
DOCUMENT TITLE<br />
LIST OF ATTACHMENT<br />
TECHNICAL NOTES FOR<br />
FLANGES,SPECTACLE BLINDS AND<br />
DRIP RINGS<br />
INSPECTION AND TEST PLAN FOR<br />
FLANGES, SPECTACLE BLINDS AND<br />
DRIP RINGS<br />
SPECIFICATION FOR QUALITY<br />
MANAGEMENT SYSTEM REQUIREMENTS<br />
FROM BIDDERS<br />
SPECIFICATION FOR DOCUMENTATION<br />
REQUIREMENTS FROM SUPPLIERS<br />
ADDITIONAL TECHNICAL<br />
REQUIREMENT<br />
DOCUMENT NO.<br />
6-44-0053<br />
6-81-0006<br />
6-78-0001<br />
6-78-0003<br />
A166-000-16-43-ATR-<br />
3230<br />
REVISION<br />
NO. DATE<br />
4 04/07/2008<br />
4 17/06/2013<br />
0 04/06/2009<br />
0 04/06/2009<br />
2 05/11/2013<br />
ENGINEERS INDIA LIMITED<br />
NEW DELHI<br />
Page 105 <strong>of</strong> 143<br />
Project: IREP<br />
Client: BPCL<br />
Requisition No.<br />
A166-000-WC-MR-3230<br />
Page 2 <strong>of</strong> 4<br />
Rev<br />
C
This drawing and design it covers are property <strong>of</strong> ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that it will not be reproduced, copied, exhibited nor used<br />
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. <strong>EIL</strong>-1641-515 Rev.0 A4-210x297<br />
<strong>EIL</strong> - 588 A - 216 x 279<br />
MR ATTACHMENT<br />
SR.NO. ITEMCODE DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD<br />
Item Description:<br />
1<br />
Item Description:<br />
2<br />
Item Description:<br />
3<br />
Item Description:<br />
4<br />
5<br />
6<br />
7<br />
8<br />
Item Description:<br />
9<br />
10<br />
Item Description:<br />
11<br />
Item Description:<br />
12<br />
Item Description:<br />
13<br />
Item Description:<br />
14<br />
15<br />
16<br />
17<br />
18<br />
Item Description:<br />
19<br />
20<br />
21<br />
FSC0127Z00419ZZZZ<br />
FSC0147Z00510ZZZZ<br />
FWB0147Z03089ZZZZ<br />
FWC0127Z01318ZZZZ<br />
FWC0127Z01602ZZZZ<br />
FWC0127Z01702ZZZZ<br />
FWC0127Z01806ZZZZ<br />
FWC0127Z02404ZZZZ<br />
FWC0147Z01518ZZZZ<br />
FWC0147Z01618ZZZZ<br />
FWC0147Z71518ZZZZ<br />
FNC0127Z015ZZZZZZ<br />
FBB0147Z030ZZZZZZ<br />
FBC0127Z009ZZZZZZ<br />
FBC0127Z013ZZZZZZ<br />
FBC0127Z015ZZZZZZ<br />
FBC0127Z018ZZZZZZ<br />
FBC0127Z024ZZZZZZ<br />
FBC0147Z015ZZZZZZ<br />
FBC0147Z016ZZZZZZ<br />
FBC0147Z018ZZZZZZ<br />
Item Description:<br />
22<br />
23<br />
FBC0147Z705ZZZZZZ<br />
FBC0147Z715ZZZZZZ<br />
FLNG.SW, B-16.5, ASTM A 105, 150, RF/125AARH<br />
0.5 INCH, XS<br />
FLNG.SW, B-16.5, ASTM A 105, 300, RF/125AARH<br />
0.75 INCH, S160<br />
FLNG.WN, B-16.47-B, ASTM A 105, 300, RF/125AARH<br />
36.0 INCH, 20.0 MM<br />
THK<br />
FLNG.WN, B-16.5, ASTM A 105, 150, RF/125AARH<br />
4.0 INCH, STD<br />
8.0 INCH, S20<br />
10.0 INCH, S20<br />
12.0 INCH, S80<br />
24.0 INCH, S40<br />
FLNG.WN, B-16.5, ASTM A 105, 300, RF/125AARH<br />
6.0 INCH, STD<br />
8.0 INCH, STD<br />
FLNG.WN, B-16.5, ASTM A 105, 300, RF/125AARH, H2<br />
6.0 INCH, STD<br />
FLNG.SO, B-16.5, ASTM A 105, 150, RF/125AARH<br />
6.0 INCH<br />
FLNG.BLIND, B-16.47-B, ASTM A 105, 300, RF/125AARH<br />
36.0 INCH<br />
FLNG.BLIND, B-16.5, ASTM A 105, 150, RF/125AARH<br />
2.0 INCH<br />
4.0 INCH<br />
6.0 INCH<br />
12.0 INCH<br />
24.0 INCH<br />
FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH<br />
6.0 INCH<br />
8.0 INCH<br />
12.0 INCH<br />
FLNG.BLIND, B-16.5, ASTM A 105, 300, RF/125AARH, H2<br />
0.75 INCH<br />
6.0 INCH<br />
6 NOS<br />
3 NOS<br />
3 NOS<br />
8 NOS<br />
1 NOS<br />
2 NOS<br />
4 NOS<br />
3 NOS<br />
7 NOS<br />
6 NOS<br />
7 NOS<br />
2 NOS<br />
3 NOS<br />
2 NOS<br />
2 NOS<br />
2 NOS<br />
4 NOS<br />
3 NOS<br />
2 NOS<br />
2 NOS<br />
1 NOS<br />
1 NOS<br />
1 NOS<br />
ENGINEERS INDIA LIMITED<br />
NEW DELHI<br />
Page 106 <strong>of</strong> 143<br />
Project: IREP<br />
Client: BPCL<br />
Requisition No.<br />
A166-000-WC-MR-3230<br />
Page 3 <strong>of</strong> 4<br />
Rev<br />
C
This drawing and design it covers are property <strong>of</strong> ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that it will not be reproduced, copied, exhibited nor used<br />
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. <strong>EIL</strong>-1641-515 Rev.0 A4-210x297<br />
<strong>EIL</strong> - 588 A - 216 x 279<br />
MR ATTACHMENT<br />
SR.NO. ITEMCODE DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD<br />
Item Description: FLNG.FIG.8, ASME-B16.48, ASTM A 105, 150, FF/125AARH<br />
24 FGK0121Z013ZZZZZZ 4.0 INCH 1 NOS<br />
Item Description: FLNG.SO, 34.0 INCH, API 650, ASTM A 105, RF/125 AARH.<br />
25 *PS3400ZFNC34ZA1A<br />
6 NOS<br />
ENGINEERS INDIA LIMITED<br />
NEW DELHI<br />
Page 107 <strong>of</strong> 143<br />
Project: IREP<br />
Client: BPCL<br />
Requisition No.<br />
A166-000-WC-MR-3230<br />
Page 4 <strong>of</strong> 4<br />
Rev<br />
C
Page 108 <strong>of</strong> 143
Page 109 <strong>of</strong> 143
Page 110 <strong>of</strong> 143
Page 111 <strong>of</strong> 143
Page 112 <strong>of</strong> 143
Page 113 <strong>of</strong> 143
Page 114 <strong>of</strong> 143
0 el ENGINEERS<br />
51g-zir IW1-g INDIA LIMITED<br />
IA Govt <strong>of</strong> India Undertaking)<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 1 <strong>of</strong> 6<br />
traql, 4cicinv1 - f01 74 it.i R1 i i.)<br />
'Tor trteTur 479T<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
4. 17.06.2013 REVISED AND RE-ISSUED TKK RKS ( ' SCG DM<br />
3 15.07.2011 REVISED AND RE-ISSUED TKK SCG AKC DM<br />
2 30.06.2010 REVISED AND RE-ISSUED<br />
RKB VKJ SKP ND<br />
1 28.09.2007 REVISED AND RE-ISSUED PD RB MVKK VC<br />
0 23.04.2002 ISSUED FOR IMPLEMENTATION NKN SPS AKB SB<br />
Rev.<br />
No.<br />
Date<br />
Purpose<br />
Prepared<br />
by<br />
Checked<br />
by<br />
Standards Committee<br />
Convenor<br />
Approved by<br />
Standards Bureau<br />
Chairman<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 115 <strong>of</strong> 143
$1g-ar tifglft<br />
,Men 2:12277 an J931.11<br />
ENGINEERS<br />
INDIA LIMITED<br />
IA Govt <strong>of</strong> India Undeltalongt<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 2 <strong>of</strong> 6<br />
Abbreviations:<br />
C<strong>EIL</strong> Certification Engineers International Limited MRT Mechanical Run Test<br />
CIMFR Central Institute <strong>of</strong> Mining & Fuel Research NDT Non Destructive Testing<br />
CE Carbon Equivalent NPSH Net Positive Suction Head<br />
DFT Dry Film Thickness PO Purchase Order<br />
DPT Dye Penetrant Testing PESO Petroleum Explosive Safety Organization<br />
DHT De-hydrogen Heat Treatment PQR Procedure Qualification Record<br />
ERTL Electronics Regional Test Laboratory PR Purchase Requisition<br />
FCRI Fluid Control Research Institute PMI Positive Material Identification<br />
HT Heat Treatment RT Radiography Testing<br />
HIC Hydrogen Induced Cracking SSCC Sulphide Stress Corrosion Cracking<br />
ITP Inspection and Test Plan TC Test Certificate<br />
IP Ingress Protection TPI or TPIA Third Party Inspection Agency<br />
IHT Intermediate Heat Treatment UT Ultrasonic Testing<br />
IC Inspection Certificate VDR Vendor Data Requirement<br />
IGC Inter Granular Corrosion WPS Welding Procedure Specification<br />
MPT/MT Magnetic Particle Testing WPQ Welders Performance Qualification<br />
MTC<br />
Material Test Certificate<br />
Inspection Standards Committee<br />
Convenor : Mr. S C Gupta<br />
Members:<br />
Mr. R.K. Singh Mr. Rajeev Kumar Mr. Himangshu Pal<br />
Mr. Neeraj Mathur Mr. T Kamalakannan Mr. Deepak Gupta (Project)<br />
Mr. Mayank Jain<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 116 <strong>of</strong> 143
ei ENGINEERS<br />
INDIA LIMITED<br />
• ,i19 eiegner t75I IA Govt <strong>of</strong> india Undertaking)<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 3 <strong>of</strong> 6<br />
1.0 SCOPE<br />
This Inspection and Test Plan covers the minimum testing requirements <strong>of</strong> Flanges, Spectacle Blinds & Drip Rings.<br />
2.0 REFERENCE DOCUMENTS<br />
PO/PR/Standards referred therein/ Job specifications /Approved documents.<br />
3.0 INSPECTION AND TEST REQUIREMENTS<br />
SL<br />
NO.<br />
STAGE/ ACTIVITY<br />
CHARACTERISTICS<br />
QUANTUM OF<br />
CHECK<br />
RECORD<br />
SUB<br />
SUPPLIER<br />
SCOPE OF INSPECTION<br />
SUPPLIER<br />
<strong>EIL</strong>/TPIA<br />
1.0 Procedure<br />
1.1<br />
Heat Treatment, NDT<br />
and Other Procedures<br />
Documented Procedures 100%<br />
Procedure<br />
Documents<br />
- H R<br />
1.2 WPS,PQR & WPQ<br />
Welding Parameters &<br />
Qualification Record<br />
100%<br />
WPS,PQR<br />
&WPQ<br />
- H<br />
W- New<br />
R- Existing<br />
2.0 Material Inspection<br />
2.1 Raw Material Inspection<br />
Chemical & Mechanical<br />
Properties<br />
100% Test Certificates - H R<br />
3.0 In Process Inspection<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 117 <strong>of</strong> 143
~eln ENGINEERS<br />
INDIA LIMITED<br />
riecnw Jcraril IA Govt <strong>of</strong> Ind Undertaking)<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 4 <strong>of</strong> 6<br />
SL<br />
NO.<br />
STAGE/ ACTIVITY<br />
3.1 Welding / Forging<br />
3.2<br />
3.3<br />
3.4<br />
Heat Treatment<br />
Identification <strong>of</strong> Test<br />
Samples<br />
Product Analysis<br />
(As applicable)<br />
CHARACTERISTICS<br />
Forging /Welding<br />
Parameters<br />
Stress Relieving,<br />
Normalising, Tempering,<br />
Solution Annealing,<br />
Stabilization Heat<br />
Treatment etc. as<br />
applicable<br />
Product Chemical,<br />
Mechanical, Impact, IGC<br />
and Other test as applicable<br />
Chemical Composition<br />
QUANTUM OF<br />
CHECK<br />
100%<br />
RECORD<br />
Inspection<br />
Reports<br />
SUB<br />
SUPPLIER<br />
SCOPE OF INSPECTION<br />
SUPPLIER<br />
<strong>EIL</strong>/TPIA<br />
- H -<br />
100% HT chart - H R<br />
100% Test Reports - H<br />
As per PR/Purchase<br />
Specification<br />
H<br />
(Note-1)<br />
Test Reports - H R<br />
3.5<br />
Destructive Testing<br />
Mechanical, Impact, IGC<br />
and Other test as applicable<br />
100% Test Reports -<br />
H<br />
H<br />
(Note-1)<br />
3.6<br />
NDT as applicable<br />
Surface & Internal<br />
Imperfections<br />
As per PR/Purchase<br />
Specification<br />
NDT Reports - H R<br />
3.7<br />
Galvanizing<br />
(If Applicable)<br />
Integrity Of Galvanised<br />
Coating<br />
100%<br />
Inspection Report<br />
- H -<br />
4.0 Final Inspection<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 118 <strong>of</strong> 143
■31<br />
43,foosfit<br />
ENGINEERS<br />
INDIA LIMITED<br />
IA Govt <strong>of</strong> India UndeflakIngt<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 5 <strong>of</strong> 6<br />
SL<br />
NO.<br />
STAGE/ ACTIVITY<br />
4.1. Final Inspection<br />
CHARACTERISTICS<br />
1.Visual<br />
2. Dimensions<br />
3.Hardness<br />
4. Marking etc<br />
QUANTUM OF<br />
CHECK<br />
RECORD<br />
SUB<br />
SUPPLIER<br />
SCOPE OF INSPECTION<br />
SUPPLIER<br />
100% Inspection Report - H<br />
<strong>EIL</strong>/TPIA<br />
H<br />
(Note-1)<br />
4.2<br />
PMI Check<br />
Chemical Check<br />
As Per <strong>EIL</strong> Spec.<br />
6-81-0001 Inspection report - H RW<br />
4.3 Final Stamping<br />
Stamping Of Accepted<br />
Items<br />
Stamping <strong>of</strong> Items<br />
which are witnessed<br />
by <strong>EIL</strong>/TPIA.<br />
Inspection Report - H<br />
H<br />
(Note — 1)<br />
5.0 Painting<br />
5.1<br />
Rust Preventive Coating<br />
& Color Coding<br />
Visual & Color Coding as<br />
applicable<br />
100% Inspection Report - H -<br />
6.0 Documentation & IC<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 119 <strong>of</strong> 143
0 el<br />
• t NfZA eivone dri<br />
ENGINEERS<br />
INDIA LIMITED<br />
(A Govt <strong>of</strong> India Undertaking)<br />
INSPECTION AND TEST PLAN<br />
FOR<br />
FLANGES, SPECTACLE BLINDS & DRIP RINGS<br />
STANDARD SPECIFICATION No.<br />
6-81-0006 Rev. 4<br />
Page 6 <strong>of</strong> 6<br />
SL<br />
NO.<br />
6.1<br />
STAGE/ ACTIVITY<br />
Documentation &<br />
Inspection Certificate(IC)<br />
CHARACTERISTICS<br />
Review <strong>of</strong> Stage Inspection<br />
Reports / Test Reports &<br />
Issue <strong>of</strong> IC<br />
QUANTUM OF<br />
CHECK<br />
RECORD<br />
SUB<br />
SUPPLIER<br />
SCOPE OF INSPECTION<br />
SUPPLIER<br />
<strong>EIL</strong>/TPIA<br />
100% Supplier TC & IC - H H<br />
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. <strong>of</strong> each size and type <strong>of</strong> Bulk item)), R-<br />
Review, W-Witness (Give due notice, work may proceed after scheduled date).<br />
NOTES (As applicable):<br />
1. For Non NACE & Non Hydrogen service Carbon Steel Flanges, Spectacle Blinds & Drip Rings up to size 24"-300ANSI Class Will be accepted on review <strong>of</strong><br />
Supplier Test Certificates. Supplier Test Certificate to be reviewed by <strong>EIL</strong>/TPIA.<br />
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable.( unless otherwise<br />
agreed upon)<br />
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.<br />
Format No. 8-00-0001-F7 Rev. 0<br />
Copyright <strong>EIL</strong> — All rights reserved<br />
Page 120 <strong>of</strong> 143
Page 121 <strong>of</strong> 143
Page 122 <strong>of</strong> 143
Page 123 <strong>of</strong> 143
Page 124 <strong>of</strong> 143
Page 125 <strong>of</strong> 143
Page 126 <strong>of</strong> 143
Page 127 <strong>of</strong> 143
Page 128 <strong>of</strong> 143
Page 129 <strong>of</strong> 143
Page 130 <strong>of</strong> 143
Page 131 <strong>of</strong> 143
Page 132 <strong>of</strong> 143
Page 133 <strong>of</strong> 143
Page 134 <strong>of</strong> 143
Page 135 <strong>of</strong> 143
Page 136 <strong>of</strong> 143
Page 137 <strong>of</strong> 143
Page 138 <strong>of</strong> 143
Page 139 <strong>of</strong> 143
Page 140 <strong>of</strong> 143
Page 141 <strong>of</strong> 143
ADDITIONAL TECHNICAL<br />
REQUIREMENTS<br />
DOCUMENT No.<br />
A166-000-16-43-ATR-3230<br />
Rev. 2<br />
Page 1 <strong>of</strong> 2<br />
ADDITIONAL TECHNICAL<br />
REQUIREMENTS<br />
2 05/11/2013 ISSUED WITH MR BV PAS RG<br />
Rev. No Date Purpose<br />
Prepared<br />
by<br />
Checked by<br />
Approved by<br />
Format No. Page <strong>EIL</strong> 142 1641-1924 <strong>of</strong> 143 Rev. 1<br />
Copyright <strong>EIL</strong> – All rights reserved
ADDITIONAL TECHNICAL<br />
REQUIREMENTS<br />
DOCUMENT No.<br />
A166-000-16-43-ATR-3230<br />
Rev. 2<br />
Page 2 <strong>of</strong> 2<br />
ADDITIONAL TECHNICAL REQUIREMENTS<br />
(FLANGES- CAT-I)<br />
1. Vendor to note that no correspondence whatsoever shall be entered into or<br />
entertained after the bid submission.<br />
2. Vendor shall furnish quotations only for those items, for which he is approved by<br />
<strong>EIL</strong> and which he can supply strictly as per MR specifications.<br />
3. No technical details <strong>of</strong> any nature shall be included in the <strong>of</strong>fer.If the <strong>of</strong>fer<br />
contains any technical deviation or clarification or stipulates any<br />
technical specifications (even if in line with the MR requirements), the<br />
<strong>of</strong>fer shall be liable for rejection.<br />
4. The submission <strong>of</strong> prices by the vendor shall be construed to mean that he has<br />
confirmed compliance with all technical specifications <strong>of</strong> the corresponding<br />
item(s).<br />
5. Vendor shall confirm categorical compliance to entire list <strong>of</strong> attachments <strong>of</strong> MR,<br />
page 2 <strong>of</strong> 3 <strong>of</strong> Doc. No; A166-000-WC-MR-3230.<br />
6. For MR serial No.25 , Flange Dimension standard shall be as per API-650 (refer<br />
Dimension <strong>Table</strong> for Shell nozzle flange).<br />
Format No. Page <strong>EIL</strong> 143 1641-1924 <strong>of</strong> 143 Rev. 1<br />